73 projects on file, including joint ventures this contractor is part of.
Total projects
73
Total budget
₱2.7B
Average progress
93.1%
Completion rate
84.9%
Average risk score
51.0
Medium risk on average, out of 100
Flagged as unusual
6
8.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 73 | ₱2.7B | 51.0 | 6 | 93.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 50 | ₱1.6B | 48.1 | 2 | 97.3% |
| Flood Control and Drainage | 16 | ₱776M | 56.9 | 3 | 76.9% |
| OTHER | 5 | ₱240.5M | 66.9 | 1 | 100.0% |
| Bridges | 2 | ₱12.2M | 35.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0274CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. LIBO-O (LEFT SIDE), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱75.7M | 0% | High risk82 | Flagged0.076 |
| 23HO0289CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL STRUCTURE AT BARANGAY YLAYA, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 0% | High risk82 | Flagged0.066 |
| 18H00015ORGANIZATIONAL OUTCOME 1: ENDURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING OF PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD.) INCL. ROW, K0027+429-K0029+060, K0029+072-K0030+680 | Region VII | Region VII | Completed | ₱111M | 100% | High risk75 | Flagged0.004 |
| 24HO0156CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY LIBO-O (LEFT SIDE) PACK | Region VII | Cebu 7th DEO | On-Going | ₱38.5M | 0% | High risk74 | Flagged0.063 |
| 17HE0087NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - PRIMARY ROADS, NATALIO BACALSO AVENUE (CEBU SOUTH ROAD), CEBU SECTION 1: K009+-(570) TO K009+687.410; SECTION 2: K0015+496 TO K0015+830; SECTION 3: K0053+266 TO K0054+391 | Region VII | Cebu 1st DEO | Completed | ₱48.3M | 100% | High risk69 | —-0.025 |
| 24HE0055ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF OCAÑA RIVER FLOOD CONTROL STRUCTURE, CARCAR CITY, C | Region VII | Cebu 1st DEO | Completed | ₱120.6M | 100% | High risk65 | —-0.061 |
| 17HE0014ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) - PRIMARY ROADS K0054+391-K0054+725 NATALIO | Region VII | Cebu 1st DEO | Completed | ₱9.8M | 100% | High risk64 | —-0.031 |
| 23HO0090ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF ROAD DIKE AT BRGY. LIBO-O - BRGY. YLAYA, RONDA, CEBU | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
| 23HO0089ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF ROAD DIKE AT BRGY. YLAYA - BRGY. LIBO-O, RONDA, CEBU | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
| 17HE0088NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY ROAD, K0058+598-K0062+751, SIBONGA-DUMANJUG ROAD, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱38.8M | 100% | High risk63 | —-0.031 |
| 17HG0064REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), ARGAO-MOALBOAL ROAD-K0066+032-K0066+469, K0067+300-K0067+989, K0067+989-K0068+071 | Region VII | Cebu 2nd DEO | Completed | ₱32.6M | 100% | High risk63 | —-0.030 |
| 17HE0020ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) TERTIARY ROADS K0051=(-782)-K0051+000; K0054+778-K0055+ | Region VII | Cebu 1st DEO | Completed | ₱45.2M | 100% | High risk62 | —-0.063 |
| 23HE0074ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0051+480 - K0052+560, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱93.9M | 100% | High risk61 | —-0.084 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0274CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. LIBO-O (LEFT SIDE), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱75.7M | 0% | High risk82 | Flagged0.076 |
| 23HO0289CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL STRUCTURE AT BARANGAY YLAYA, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 0% | High risk82 | Flagged0.066 |
| 24HO0156CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY LIBO-O (LEFT SIDE) PACK | Region VII | Cebu 7th DEO | On-Going | ₱38.5M | 0% | High risk74 | Flagged0.063 |
| 25HD0190REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS - CONCRETING OF BRGY. TUBOD FMR, BRGY. TUBOD, SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱14.9M | 0% | Medium risk47 | Flagged0.031 |
| 18H00015ORGANIZATIONAL OUTCOME 1: ENDURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING OF PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD.) INCL. ROW, K0027+429-K0029+060, K0029+072-K0030+680 | Region VII | Region VII | Completed | ₱111M | 100% | High risk75 | Flagged0.004 |
| 24HG0076CONCRETING OF BRGY. LENGIGON TO ALAMBIJUD FMR PHASE II, BRGY. LENGIGON AND BRGY. ALAMBIJUD, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱14.9M | 100% | Medium risk48 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 23HO0274CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. LIBO-O (LEFT SIDE), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱75.7M | 0% | High risk82 | Flagged0.076 |
| 2 | 23HO0289CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL STRUCTURE AT BARANGAY YLAYA, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 0% | High risk82 | Flagged0.066 |
| 3 | 18H00015ORGANIZATIONAL OUTCOME 1: ENDURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING OF PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD.) INCL. ROW, K0027+429-K0029+060, K0029+072-K0030+680 | Region VII | Region VII | Completed | ₱111M | 100% | High risk75 | Flagged0.004 |
| 4 | 24HO0156CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY LIBO-O (LEFT SIDE) PACK | Region VII | Cebu 7th DEO | On-Going | ₱38.5M | 0% | High risk74 | Flagged0.063 |
| 5 | 17HE0087NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - PRIMARY ROADS, NATALIO BACALSO AVENUE (CEBU SOUTH ROAD), CEBU SECTION 1: K009+-(570) TO K009+687.410; SECTION 2: K0015+496 TO K0015+830; SECTION 3: K0053+266 TO K0054+391 | Region VII | Cebu 1st DEO | Completed | ₱48.3M | 100% | High risk69 | —-0.025 |
| 6 | 24HE0055ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF OCAÑA RIVER FLOOD CONTROL STRUCTURE, CARCAR CITY, C | Region VII | Cebu 1st DEO | Completed | ₱120.6M | 100% | High risk65 | —-0.061 |
| 7 | 17HE0014ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) - PRIMARY ROADS K0054+391-K0054+725 NATALIO | Region VII | Cebu 1st DEO | Completed | ₱9.8M | 100% | High risk64 | —-0.031 |
| 8 | 23HO0090ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF ROAD DIKE AT BRGY. LIBO-O - BRGY. YLAYA, RONDA, CEBU | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
| 9 | 23HO0089ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF ROAD DIKE AT BRGY. YLAYA - BRGY. LIBO-O, RONDA, CEBU | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
| 10 | 17HE0088NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY ROAD, K0058+598-K0062+751, SIBONGA-DUMANJUG ROAD, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱38.8M | 100% | High risk63 | —-0.031 |
| 11 | 17HG0064REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), ARGAO-MOALBOAL ROAD-K0066+032-K0066+469, K0067+300-K0067+989, K0067+989-K0068+071 | Region VII | Cebu 2nd DEO | Completed | ₱32.6M | 100% | High risk63 | —-0.030 |
| 12 | 17HE0020ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) TERTIARY ROADS K0051=(-782)-K0051+000; K0054+778-K0055+ | Region VII | Cebu 1st DEO | Completed | ₱45.2M | 100% | High risk62 | —-0.063 |
| 13 | 23HE0074ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0051+480 - K0052+560, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱93.9M | 100% | High risk61 | —-0.084 |
| 14 | 18H00032ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-ROAD WIDENING OF PRIMARY ROADS, N. BACALSO AVE (CEBU SOUTH RD) INCL. ROW-K0031+350-K0033+K0033+740 | Region VII | Region VII | Completed | ₱101.2M | 100% | Medium risk60 | —-0.063 |
| 15 | 17HE0029NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS - PRIMARY ROADS - OTHER PRIMARY ROADS - K0026+380-K0026+921, K0027+220-K0027+429 NATALIO BACALSO AVENUE (CEBU SOUTH ROAD), SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | Completed | ₱46.5M | 100% | Medium risk58 | —-0.063 |
| 16 | 25HD0097CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, CITY OF NAGA - SAN SAN FE | Region VII | Cebu 1st DEO | On-Going | ₱91.7M | 64% | Medium risk57 | —-0.047 |
| 17 | 25HO0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO BAGONBON (LEFT SIDE), BARANGAY LIBOO, | Region VII | Cebu 7th DEO | On-Going | ₱67.5M | 31% | Medium risk55 | —-0.018 |
| 18 | 22HG0042OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS, N. BACALSO AVE (CEBU SOUTH RD), K0074+238 - K0076+150 | Region VII | Cebu 2nd DEO | Completed | ₱69.2M | 100% | Medium risk54 | —-0.080 |
| 19 | 21HE0011ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - N. BACALSO AVE, (CEBU SOUTH RD) K0041+903 - K0043+544 | Region VII | Cebu 1st DEO | Completed | ₱58.5M | 100% | Medium risk54 | —-0.092 |
| 20 | 25HD0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - N BACALSO AVENUE (CEBU SOUTH RD) - K0023+021 - K0024+978, NAGA CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱73.6M | 100% | Medium risk54 | —-0.090 |
| 21 | 25HD0007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0019 + 000 - K0020 + 000, CITY OF | Region VII | Cebu 1st DEO | Completed | ₱81.1M | 100% | Medium risk54 | —-0.087 |
| 22 | 20HE0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - N BACALSO AVENUE (CEBU SOUTH RD) (S00285CB) K0015+251-K0016+750 | Region VII | Cebu 1st DEO | Completed | ₱72.4M | 100% | Medium risk54 | —-0.090 |
| 23 | 18HF0078CONSTRUCTION/IMPROVEMENT OF BRGY. MALOLOS-VETO-KANTABUGON ROAD LEADING TO HERMITS COVE, BOJO RIVER AND LUNHAW FARM RESORT, BRGY. MALOLOS, BARILI-BRGY. KANTABUGON, ALOGUINSAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱54.8M | 100% | Medium risk53 | —-0.091 |
| 24 | 18HG0069ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM; REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD-TERTIARY ROADS ARGAO-MOALBOAL ROAD; K0059+000 K0060+000, K0069+186 K0070+259, K0058+83 | Region VII | Cebu 2nd DEO | Completed | ₱51.3M | 100% | Medium risk52 | —-0.094 |
| 25 | 22HE0009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SIBONGA-DUMANJUG RD, K0063+000 - K0067+565, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱48.4M | 100% | Medium risk51 | —-0.094 |