Contractor dossier
73 projects on file, including joint ventures this contractor is part of.
Total projects
73
Total budget
₱2.7B
Average progress
93.1%
Completion rate
84.9%
Average risk score
51.0
Medium risk on average, out of 100
Flagged as unusual
6
8.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 73 | ₱2.7B | 51.0 | 6 | 93.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 50 | ₱1.6B | 48.1 | 2 | 97.3% |
| Flood Control and Drainage | 16 | ₱776M | 56.9 | 3 | 76.9% |
| OTHER | 5 | ₱240.5M | 66.9 | 1 | 100.0% |
| Bridges | 2 | ₱12.2M | 35.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0274CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. LIBO-O (LEFT SIDE), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱75.7M | 0% | High risk82 | Flagged0.076 |
| 23HO0289CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL STRUCTURE AT BARANGAY YLAYA, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 0% | High risk82 | Flagged0.066 |
| 18H00015ORGANIZATIONAL OUTCOME 1: ENDURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING OF PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD.) INCL. ROW, K0027+429-K0029+060, K0029+072-K0030+680 | Region VII | Region VII | Completed | ₱111M | 100% | High risk75 | Flagged0.004 |
| 24HO0156CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY LIBO-O (LEFT SIDE) PACK | Region VII | Cebu 7th DEO | On-Going | ₱38.5M | 0% | High risk74 | Flagged0.063 |
| 17HE0087NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - PRIMARY ROADS, NATALIO BACALSO AVENUE (CEBU SOUTH ROAD), CEBU SECTION 1: K009+-(570) TO K009+687.410; SECTION 2: K0015+496 TO K0015+830; SECTION 3: K0053+266 TO K0054+391 | Region VII | Cebu 1st DEO | Completed | ₱48.3M | 100% | High risk69 | —-0.025 |
| 24HE0055ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF OCAÑA RIVER FLOOD CONTROL STRUCTURE, CARCAR CITY, C | Region VII | Cebu 1st DEO | Completed | ₱120.6M | 100% | High risk65 | —-0.061 |
| 17HE0014ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) - PRIMARY ROADS K0054+391-K0054+725 NATALIO | Region VII | Cebu 1st DEO | Completed | ₱9.8M | 100% | High risk64 | —-0.031 |
| 23HO0090ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF ROAD DIKE AT BRGY. LIBO-O - BRGY. YLAYA, RONDA, CEBU | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
| 23HO0089ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF ROAD DIKE AT BRGY. YLAYA - BRGY. LIBO-O, RONDA, CEBU | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
| 17HE0088NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY ROAD, K0058+598-K0062+751, SIBONGA-DUMANJUG ROAD, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱38.8M | 100% | High risk63 | —-0.031 |
| 17HG0064REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), ARGAO-MOALBOAL ROAD-K0066+032-K0066+469, K0067+300-K0067+989, K0067+989-K0068+071 | Region VII | Cebu 2nd DEO | Completed | ₱32.6M | 100% | High risk63 | —-0.030 |
| 17HE0020ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) TERTIARY ROADS K0051=(-782)-K0051+000; K0054+778-K0055+ | Region VII | Cebu 1st DEO | Completed | ₱45.2M | 100% | High risk62 | —-0.063 |
| 23HE0074ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0051+480 - K0052+560, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱93.9M | 100% | High risk61 | —-0.084 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0274CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. LIBO-O (LEFT SIDE), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱75.7M | 0% | High risk82 | Flagged0.076 |
| 23HO0289CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL STRUCTURE AT BARANGAY YLAYA, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 0% | High risk82 | Flagged0.066 |
| 24HO0156CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY LIBO-O (LEFT SIDE) PACK | Region VII | Cebu 7th DEO | On-Going | ₱38.5M | 0% | High risk74 | Flagged0.063 |
| 25HD0190REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS - CONCRETING OF BRGY. TUBOD FMR, BRGY. TUBOD, SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱14.9M | 0% | Medium risk47 | Flagged0.031 |
| 18H00015ORGANIZATIONAL OUTCOME 1: ENDURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING OF PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD.) INCL. ROW, K0027+429-K0029+060, K0029+072-K0030+680 | Region VII | Region VII | Completed | ₱111M | 100% | High risk75 | Flagged0.004 |
| 24HG0076CONCRETING OF BRGY. LENGIGON TO ALAMBIJUD FMR PHASE II, BRGY. LENGIGON AND BRGY. ALAMBIJUD, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱14.9M | 100% | Medium risk48 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 19HE0013ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - CARCAR-BARILI-MANTAYUPAN RD (S00289CB) K0041+(-752)-K0042+582, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱15.1M | 100% | Medium risk47 | —-0.097 |
| 52 | 25HD0010ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0042+128 - K0042 + 673, CARCAR CITY, | Region VII | Cebu 1st DEO | Completed | ₱20.3M | 100% | Medium risk47 | —-0.097 |
| 53 | 23HE0045ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0049+660 - K0050+211, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱17.5M | 100% | Medium risk47 | —-0.097 |
| 54 | 24HE0031ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0033+616 - K0033+935, SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | Completed | ₱26.8M | 100% | Medium risk47 | —-0.096 |
| 55 | 24HE0039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K000035+220 - K0035+451, K0035+451 - K0035+580, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱21.6M | 100% | Medium risk47 | —-0.096 |
| 56 | 23HE0107ORGANIZATIONAL OUTCONE 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0029+832-K0029+1675, SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | Completed | ₱23M | 100% | Medium risk47 | —-0.096 |
| 57 | 22HE0011ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHAB./RECONST./ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0028+903 - K0029+060, K0029+072 - K0029+832, SAN FERNANDO, C | Region VII | Cebu 1st DEO | Completed | ₱23.1M | 100% | Medium risk47 | —-0.096 |
| 58 | 24HE0030ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) K0033+397 - K0033+616, SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | Completed | ₱19.2M | 100% | Medium risk47 | —-0.096 |
| 59 | 24HE0214ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0033+164 - K0033+935, SAN FERNANDO, CE | Region VII | Cebu 1st DEO | Completed | ₱24.1M | 100% | Medium risk47 | —-0.097 |
| 60 | 21HE0147LOCAL PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM - CONCRETING OF LOCAL ROAD, BARANGAY TAPUL - MANIPIS, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱23.8M | 100% | Medium risk46 | —-0.097 |
| 61 | 20HE0097LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - ROAD CONCRETING, BRGY. LINAO, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.097 |
| 62 | 22HE0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0017+750 - K0018+250, NAGA CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱24.5M | 100% | Medium risk46 | —-0.097 |
| 63 | 23HG0036OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N. BACALSO AVE (CEBU SOUTH RD) - K0073+000 - K0073+600 | Region VII | Cebu 2nd DEO | Completed | ₱14.1M | 100% | Medium risk46 | —-0.096 |
| 64 | 25HE0006CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, SITIO GUSO, BARANGAY PANADTARAN, ARGAO, CE | Region VII | Cebu 2nd DEO | On-Going | ₱4.9M | 100% | Medium risk46 | —-0.065 |
| 65 | 24HE0146ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHAB/RECONST OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0051+790 - K0051+960, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱12M | 100% | Medium risk46 | —-0.098 |
| 66 | 18HG0070ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM; REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD-TERTIARY ROADS ARGAO-MOALBOAL ROAD; K0066+469 K0066+675, K0066+675 K0066+695 (SAVINGS), C | Region VII | Cebu 2nd DEO | Completed | ₱5.6M | 100% | Medium risk46 | —-0.097 |
| 67 | 22HG0004CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD, GUIWANON BARANGAY ROAD, BARANGAY GUIWANON, ARGAO, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱7.9M | 100% | Medium risk46 | —-0.097 |
| 68 | 23HE0043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0039+476 - K0039+755, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱7.3M | 100% | Medium risk46 | —-0.096 |
| 69 | 20HE0096LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INSFRASTRUCTURE INCLUDING LOCAL PROJECTS - ROAD CONCRETING IN BRGY. TAPUL, TALISAY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.098 |
| 70 | 21HE0177CONCRETING OF BRGY. TAPUL TO BRGY. MANIPIS FMR, BRGY. TAPUL AND BRGY. MANIPIS, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱12.4M | 100% | Medium risk42 | —-0.044 |
| 71 | 18HE0005ASSET PRESERVATION - PREVENTIVE MAINTENANCE OF ROAD - PRIMARY ROADS - NATALIO BACALSO AVENUE (CEBU SOUTH RD.) (S00288CB) | Region VII | Cebu 1st DEO | Completed | ₱2.1M | 100% | Low risk27 | —-0.092 |
| 72 | 22HE0024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - ABUNO BR. (B00516CB) ALONG N BACALSO AVE (CEBU SOUTH RD), MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱2.9M | 100% | Low risk23 | —-0.060 |
| 73 | 23HE0047ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU SOUTH COASTAL RD - K0012+225 - K0012+332, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.4M | 100% | Low risk22 | —-0.094 |