Opening the dossier…
Opening the dossier…
Contractor dossier
125 projects on file, including joint ventures this contractor is part of.
Total projects
125
Total budget
₱6.7B
Average progress
95.1%
Completion rate
85.6%
Average risk score
47.9
Medium risk on average, out of 100
Flagged as unusual
7
5.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 49 | ₱2.6B | 49.5 | 5 | 94.8% |
| Region I | 24 | ₱985.8M | 50.5 | 0 | 93.7% |
| Region XII | 16 | ₱1.1B | 35.3 | 0 | 100.0% |
| Cordillera Administrative Region | 9 | ₱714.1M | 54.4 | 1 | 96.7% |
| Region III | 9 | ₱158.1M | 35.0 | 0 | 100.0% |
| Region X | 5 | ₱433.7M | 54.4 | 0 | 100.0% |
| National Capital Region | 4 | ₱177.4M | 47.8 | 0 | 73.8% |
| Region VIII | 3 | ₱198M | 54.7 | 0 | 100.0% |
| Region IV-B | 2 | ₱210.2M | 57.5 | 0 | 86.0% |
| Region IV-A | 2 | ₱57.2M | 47.0 | 0 | 100.0% |
| Region XIII | 1 | ₱39M | 95.2 | 1 | 57.5% |
| Region II | 1 | ₱44.1M | 44.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 53 | ₱3.1B | 46.1 | 0 | 98.6% |
| Flood Control and Drainage | 38 | ₱2.4B | 51.7 | 1 | 99.3% |
| Buildings and Facilities | 19 | ₱501.4M | 35.5 | 2 | 93.3% |
| Bridges | 9 | ₱353.6M | 46.8 | 0 | 83.3% |
| OTHER | 4 | ₱198.3M | 73.0 | 2 | 71.0% |
| GAA 2025 SSP | 1 | ₱39M | 95.2 | 1 | 57.5% |
| GAA 2025 OO-1 | 1 | ₱76M | 93.8 | 1 | 29.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NH0061CONSTRUCTION OF BRIDGE LINKING BURGOS AND TAG-ANUNGAN BOTH OF CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39M | 58% | High risk95 | Flagged0.028 |
| 25L00093PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY (DAVAO CITY - JCT. DIGOS SECT) - (S00039MN) K1517+804 - K1518+060, K1518+231 - K1518+405, (S01455MN) CHAINAGE 2488 - CHAINAGE 3712, DAVAO CITY | Region XI | Region XI | On-Going | ₱76M | 30% | High risk94 | Flagged0.022 |
| 22LB0308CONSTRUCTION OF ROAD WITH DRAINAGE AT BARANGAY TALOMO PROPER, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱57.9M | 74% | High risk76 | Flagged0.034 |
| 25L00106CONSTRUCTION (COMPLETION) OF BUILDING INSTITUTE FOR INFECTIOUS DISEASE, SOUTHERN PHILIPPINES MEDICAL CENTER, DAVAO CITY, PHASE II | Region XI | Region XI | On-Going | ₱42M | 11% | High risk72 | Flagged0.031 |
| 21MB0028ROAD WIDENING INCLUDING DRAINAGE ALONG MABUHAY ROAD, STA. 3+666 TO STA. 4+991, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱65.5M | 100% | High risk72 | —-0.024 |
| 18LB0022CONST./IMP. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS JCT. DAVAO COTABATO OLD ROAD BA | Region XI | Davao City DEO | Completed | ₱32.8M | 100% | High risk72 | —-0.026 |
| 19P00045REHABILITATION OF THE FLOOD MITIGATION STRUCTURE ALONG BUED RIVER BASIN, CAMP 1 SECTION, TABAAN SUR, TUBA, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk67 | Flagged0.009 |
| 17AJ0032CONSTRUCTION OF CONCRETE REVETMENT ALONG MARUSAY RIVER AT LASIP SECTION, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱23.9M | 100% | High risk65 | —-0.046 |
| 17AJ0054CONSTRUCTION OF PROTECTION WORKS ALONG AGNO RIVER, GUELEW SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱9.8M | 100% | High risk65 | —-0.048 |
| 17AI0040OFF-CARRIAGEWAY IMPVT INCL DRAINAGE ALONG PANGASINAN-NUEVA ECIJA RD, STA 186+009-STA. 186+492 | Region I | Pangasinan 3rd DEO | Completed | ₱9.5M | 100% | High risk65 | —-0.059 |
| 22L00092CONSTRUCTION OF JUNCTION SALINGCOMOT - BATAWAN ROAD, BAGANGA, DAVAO ORIENTAL | Region XI | Region XI | Completed | ₱164M | 100% | High risk64 | —-0.049 |
| 18PE0107REHABILITATION AND CONSTRUCTION OF DUNGON BRIDGE FLOOD CONTROL, CAMP 1, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱92.6M | 100% | High risk64 | —-0.003 |
| 18PE0106REHABILITATION AND CONSTRUCTION OF BUED RIVER BASIN FLOOD MITIGATION STRUCTURE, CAMP 1 SECTION, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱92.5M | 100% | High risk62 | —-0.002 |
| 21L00042ROAD WIDENING ALONG FATIMA - MALABOG ROAD (S00059MN), K1507+010-K1508+498, DAVAO CITY | Region XI | Region XI | On-Going | ₱100.5M | 74% | High risk62 | —-0.011 |
| 22A00078CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PARONGKING RIVER, BRGY. AMBONAO AND BRGY. SAN MIGUEL, CALASIAO, PANGASINAN (PHASE I) | Region I | Region I | Completed | ₱129.6M | 100% | High risk62 | —-0.049 |
| 22A00079CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PARONGKING RIVER, BRGY. AMBONAO AND BRGY. SAN MIGUEL, CALASIAO, PANGASINAN (PHASE II) | Region I | Region I | Completed | ₱128.3M | 100% | High risk62 | —-0.050 |
| 21LB0305CONSTRUCTION OF DRAINAGE SYSTEM LEADING TO TUPAZ OUTFALL, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.063 |
| 24KL0071CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALAE RIVER (RIGHT SIDE), PACKAGE 3, BARANGAY CASINGLOT, TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱125.5M | 100% | High risk61 | —-0.064 |
| 24KL0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALAE RIVER (RIGHT SIDE), PACKAGE 4, BARANGAY CASINGLOT, TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱125.5M | 100% | High risk61 | —-0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22LB0308CONSTRUCTION OF ROAD WITH DRAINAGE AT BARANGAY TALOMO PROPER, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱57.9M | 74% | High risk76 | Flagged0.034 |
| 25L00106CONSTRUCTION (COMPLETION) OF BUILDING INSTITUTE FOR INFECTIOUS DISEASE, SOUTHERN PHILIPPINES MEDICAL CENTER, DAVAO CITY, PHASE II | Region XI | Region XI | On-Going | ₱42M | 11% | High risk72 | Flagged0.031 |
| 25NH0061CONSTRUCTION OF BRIDGE LINKING BURGOS AND TAG-ANUNGAN BOTH OF CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39M | 58% | High risk95 | Flagged0.028 |
| 25L00093PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY (DAVAO CITY - JCT. DIGOS SECT) - (S00039MN) K1517+804 - K1518+060, K1518+231 - K1518+405, (S01455MN) CHAINAGE 2488 - CHAINAGE 3712, DAVAO CITY | Region XI | Region XI | On-Going | ₱76M | 30% | High risk94 | Flagged0.022 |
| 21LB0383CONSTRUCTION OF OFFICE BUILDING FOR THE NATIONAL PROSECUTION SERVICE IN REGION XI (PHASE III) | Region XI | Davao City DEO | On-Going | ₱49.7M | 86% | Medium risk46 | Flagged0.021 |
| 19P00045REHABILITATION OF THE FLOOD MITIGATION STRUCTURE ALONG BUED RIVER BASIN, CAMP 1 SECTION, TABAAN SUR, TUBA, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk67 | Flagged0.009 |
| 24LH0109CONSTRUCTION OF 3STY12CL, VINZONS ELEM. SCHOOL, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 2nd DEO | On-Going | ₱47.6M | 86% | Medium risk47 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25NH0061CONSTRUCTION OF BRIDGE LINKING BURGOS AND TAG-ANUNGAN BOTH OF CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39M | 58% | High risk95 | Flagged0.028 |
| 2 | 25L00093PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY (DAVAO CITY - JCT. DIGOS SECT) - (S00039MN) K1517+804 - K1518+060, K1518+231 - K1518+405, (S01455MN) CHAINAGE 2488 - CHAINAGE 3712, DAVAO CITY | Region XI | Region XI | On-Going | ₱76M | 30% | High risk94 | Flagged0.022 |
| 3 | 22LB0308CONSTRUCTION OF ROAD WITH DRAINAGE AT BARANGAY TALOMO PROPER, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱57.9M | 74% | High risk76 | Flagged0.034 |
| 4 | 25L00106CONSTRUCTION (COMPLETION) OF BUILDING INSTITUTE FOR INFECTIOUS DISEASE, SOUTHERN PHILIPPINES MEDICAL CENTER, DAVAO CITY, PHASE II | Region XI | Region XI | On-Going | ₱42M | 11% | High risk72 | Flagged0.031 |
| 5 | 21MB0028ROAD WIDENING INCLUDING DRAINAGE ALONG MABUHAY ROAD, STA. 3+666 TO STA. 4+991, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱65.5M | 100% | High risk72 | —-0.024 |
| 6 | 18LB0022CONST./IMP. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS JCT. DAVAO COTABATO OLD ROAD BA | Region XI | Davao City DEO | Completed | ₱32.8M | 100% | High risk72 | —-0.026 |
| 7 | 19P00045REHABILITATION OF THE FLOOD MITIGATION STRUCTURE ALONG BUED RIVER BASIN, CAMP 1 SECTION, TABAAN SUR, TUBA, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk67 | Flagged0.009 |
| 8 | 17AJ0032CONSTRUCTION OF CONCRETE REVETMENT ALONG MARUSAY RIVER AT LASIP SECTION, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱23.9M | 100% | High risk65 | —-0.046 |
| 9 | 17AJ0054CONSTRUCTION OF PROTECTION WORKS ALONG AGNO RIVER, GUELEW SECTION, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱9.8M | 100% | High risk65 | —-0.048 |
| 10 | 17AI0040OFF-CARRIAGEWAY IMPVT INCL DRAINAGE ALONG PANGASINAN-NUEVA ECIJA RD, STA 186+009-STA. 186+492 | Region I | Pangasinan 3rd DEO | Completed | ₱9.5M | 100% | High risk65 | —-0.059 |
| 11 | 22L00092CONSTRUCTION OF JUNCTION SALINGCOMOT - BATAWAN ROAD, BAGANGA, DAVAO ORIENTAL | Region XI | Region XI | Completed | ₱164M | 100% | High risk64 | —-0.049 |
| 12 | 18PE0107REHABILITATION AND CONSTRUCTION OF DUNGON BRIDGE FLOOD CONTROL, CAMP 1, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱92.6M | 100% | High risk64 | —-0.003 |
| 13 | 18PE0106REHABILITATION AND CONSTRUCTION OF BUED RIVER BASIN FLOOD MITIGATION STRUCTURE, CAMP 1 SECTION, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱92.5M | 100% | High risk62 | —-0.002 |
| 14 | 21L00042ROAD WIDENING ALONG FATIMA - MALABOG ROAD (S00059MN), K1507+010-K1508+498, DAVAO CITY | Region XI | Region XI | On-Going | ₱100.5M | 74% | High risk62 | —-0.011 |
| 15 | 22A00078CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PARONGKING RIVER, BRGY. AMBONAO AND BRGY. SAN MIGUEL, CALASIAO, PANGASINAN (PHASE I) | Region I | Region I | Completed | ₱129.6M | 100% | High risk62 | —-0.049 |
| 16 | 22A00079CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PARONGKING RIVER, BRGY. AMBONAO AND BRGY. SAN MIGUEL, CALASIAO, PANGASINAN (PHASE II) | Region I | Region I | Completed | ₱128.3M | 100% | High risk62 | —-0.050 |
| 17 | 21LB0305CONSTRUCTION OF DRAINAGE SYSTEM LEADING TO TUPAZ OUTFALL, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.063 |
| 18 | 24KL0071CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALAE RIVER (RIGHT SIDE), PACKAGE 3, BARANGAY CASINGLOT, TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱125.5M | 100% | High risk61 | —-0.064 |
| 19 | 24KL0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALAE RIVER (RIGHT SIDE), PACKAGE 4, BARANGAY CASINGLOT, TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱125.5M | 100% | High risk61 | —-0.064 |
| 20 | 21LA0109ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG MONTEVISTA - COMPOSTELA - MATI BDRY RD (S00135MN), DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.067 |
| 21 | 23E00208CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF MAG-ASAWANG TUBIG RIVER CONTROL (GABION REVETMENT), NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱94.4M | 72% | Medium risk60 | —-0.012 |
| 22 | 23P00046ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BAGUIO - BONTOC RD, K0359+510 - K0359+580 | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱144.8M | 85% | Medium risk59 | —-0.021 |
| 23 | 17CJ0059REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL (LEFT DIKE), SAN BARTOLOME SECTION, SAN BARTOLOME, GERONA, TARLAC, STA 0+000 - 0+377.50 | Region III | Tarlac DEO | Completed | ₱37.3M | 100% | Medium risk59 | —-0.005 |
| 24 | 22LF0039SURIGAO DEL SUR BDRY - DAVAO OR COASTAL RD - K1618+833 - K1622+000, CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱89.5M | 100% | Medium risk57 | —-0.064 |
| 25 | 23P00047ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BAGUIO - BONTOC RD, K0359+610 - K0359+693SABANGAN | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱96.5M | 85% | Medium risk56 | —-0.032 |