Contractor dossier
44 projects on file, including joint ventures this contractor is part of.
Total projects
44
Total budget
₱2.4B
Average progress
96.0%
Completion rate
88.6%
Average risk score
60.1
High risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 39 | ₱2.1B | 60.3 | 0 | 95.5% |
| Region IV-B | 2 | ₱81.7M | 59.8 | 0 | 100.0% |
| Region IV-A | 2 | ₱145.5M | 55.7 | 0 | 100.0% |
| National Capital Region | 1 | ₱96.5M | 60.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 35 | ₱2B | 60.8 | 0 | 97.1% |
| Bridges | 4 | ₱117.6M | 55.1 | 0 | 100.0% |
| Flood Control and Drainage | 3 | ₱113.9M | 54.1 | 0 | 100.0% |
| Bridges, Roads | 2 | ₱196.2M | 66.6 | 0 | 62.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18F00093NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, SAN FERNANDO-SAN JACINTO-MONREAL ROAD, MASBATE, TICAO ISLAND, MASBATE | Region V | Region V | Completed | ₱144.7M | 100% | High risk70 | —-0.071 |
| 18F00046OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS-MASBATE-CATAINGAN-PLACER ROAD, MASBATE PROVINCE | Region V | Region V | Completed | ₱155.6M | 100% | High risk68 | —-0.066 |
| 22F00061OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-BALDOZA BR. (B00058MT) ALONG BUENAVISTA-KAWAYAN RD., CAWAYAN, MASBATE 3RD LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱107.1M | 100% | High risk68 | —-0.061 |
| 18F00051CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, MASBATE PROVINCE | Region V | Region V | Completed | ₱179.1M | 100% | High risk67 | —-0.064 |
| 21F00087CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, MASBATE, BALUD, MASBATE (2ND LEGISLATIVE DIS | Region V | Region V | Completed | ₱139.9M | 100% | High risk67 | —-0.077 |
| 19F00008OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-POBLACION MOROCBOROCAN-GUINHADAP ROAD, MASBATE, MASBATE 1ST LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱96.5M | 100% | High risk66 | —-0.076 |
| 18F00096OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/NEW ROADS - POBLACION MOROCBOROCAN-GUINHADAP ROAD, MASBATE, MASBATE 1ST LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱96.5M | 100% | High risk66 | —-0.066 |
| 24F00105ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-TAGKAWAYAN-LABO DIVERSION ROAD (LABO SECTION) BUSIG ON BRIDGE-PHASE II, CAMARINES NORTE, LABO, CAMARINES NORTE | Region V | Region V | On-Going | ₱89.1M | 26% | High risk65 | —-0.021 |
| 20F00057OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-POBLACION MOROCBOROCAN-GUINHADAP ROAD, MASBATE, MASBATE 1ST LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱70.9M | 29% | High risk64 | —-0.011 |
| 20F00073CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, MASBATE, BALUD, MASBATE (2ND LEGISLATIVE DIS | Region V | Region V | Completed | ₱120.6M | 100% | High risk64 | —-0.075 |
| 22F00060CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM (ROLL-IT) - BALUD NATIONAL ROAD CONNECTING BARANGAY | Region V | Region V | On-Going | ₱112.9M | 70% | High risk63 | —-0.035 |
| 20FJ0012NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, BUENAVISTA-KAWAYAN ROAD, K0056+851 - K0059+400 | Region V | Masbate 3rd DEO | On-Going | ₱67.5M | 100% | High risk63 | —-0.030 |
| 20FJ0013NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, BUENAVISTA-KAWAYAN ROAD, K0037+500 - K0038+860, K0040+728 - K0041+728 | Region V | Masbate 3rd DEO | Completed | ₱64.1M | 100% | High risk63 | —-0.093 |
| 19FJ0017NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, MASBATE-CATAINGAN-PLACER ROAD, K0039+505 - K0040+715, K0078+681 - K0078+850, K0081+521 - K0082+532 | Region V | Masbate 3rd DEO | Completed | ₱67.2M | 100% | High risk63 | —-0.088 |
| 20FJ0014LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, CONCRETING OF JUNCTION NATIONAL ROAD, BRGY. SAN PEDRO TO BRGY. CONCEPCION, MADAMBA AGUADA ROAD, CATAINGAN, MASBATE | Region V | Masbate 3rd DEO | Completed | ₱64.3M | 100% | High risk63 | —-0.094 |
| 17FJ0006ASSET PRES. OF NATL. RD NETWORK SERVICES - REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATL. ROADS INCL | Region V | Masbate 3rd DEO | Completed | ₱27.8M | 100% | High risk61 | —-0.053 |
| 17EB0060NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CROSSING MWCR (POLA)-CASAGUE-JCT ALAKAAC RD K0379 + 996 K0381 + 308, S00163MR, SANTA CRUZ, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱35.9M | 100% | High risk61 | —-0.020 |
| 22OF0247PREVENTIVE MAINTENANCE - SECONDARY ROADS COMMONWEALTH AVE (S05453LZ) K0016 + 000 - K0016 + 600, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.086 |
| 20D00033FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS PARIAN- SAN JOSE-BUCAL DIVERSION ROAD, LAGUNA | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk60 | —-0.085 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 18F00093NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, SAN FERNANDO-SAN JACINTO-MONREAL ROAD, MASBATE, TICAO ISLAND, MASBATE | Region V | Region V | Completed | ₱144.7M | 100% | High risk70 | —-0.071 |
| 2 | 18F00046OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS-MASBATE-CATAINGAN-PLACER ROAD, MASBATE PROVINCE | Region V | Region V | Completed | ₱155.6M | 100% | High risk68 | —-0.066 |
| 3 | 22F00061OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-BALDOZA BR. (B00058MT) ALONG BUENAVISTA-KAWAYAN RD., CAWAYAN, MASBATE 3RD LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱107.1M | 100% | High risk68 | —-0.061 |
| 4 | 18F00051CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, MASBATE PROVINCE | Region V | Region V | Completed | ₱179.1M | 100% | High risk67 | —-0.064 |
| 5 | 21F00087CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, MASBATE, BALUD, MASBATE (2ND LEGISLATIVE DIS | Region V | Region V | Completed | ₱139.9M | 100% | High risk67 | —-0.077 |
| 6 | 19F00008OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-POBLACION MOROCBOROCAN-GUINHADAP ROAD, MASBATE, MASBATE 1ST LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱96.5M | 100% | High risk66 | —-0.076 |
| 7 | 18F00096OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/NEW ROADS - POBLACION MOROCBOROCAN-GUINHADAP ROAD, MASBATE, MASBATE 1ST LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱96.5M | 100% | High risk66 | —-0.066 |
| 8 | 24F00105ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-TAGKAWAYAN-LABO DIVERSION ROAD (LABO SECTION) BUSIG ON BRIDGE-PHASE II, CAMARINES NORTE, LABO, CAMARINES NORTE | Region V | Region V | On-Going | ₱89.1M | 26% | High risk65 | —-0.021 |
| 9 | 20F00057OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-POBLACION MOROCBOROCAN-GUINHADAP ROAD, MASBATE, MASBATE 1ST LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱70.9M | 29% | High risk64 | —-0.011 |
| 10 | 20F00073CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, MASBATE, BALUD, MASBATE (2ND LEGISLATIVE DIS | Region V | Region V | Completed | ₱120.6M | 100% | High risk64 | —-0.075 |
| 11 | 22F00060CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM (ROLL-IT) - BALUD NATIONAL ROAD CONNECTING BARANGAY | Region V | Region V | On-Going | ₱112.9M | 70% | High risk63 | —-0.035 |
| 12 | 20FJ0012NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, BUENAVISTA-KAWAYAN ROAD, K0056+851 - K0059+400 | Region V | Masbate 3rd DEO | On-Going | ₱67.5M | 100% | High risk63 | —-0.030 |
| 13 | 20FJ0013NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, BUENAVISTA-KAWAYAN ROAD, K0037+500 - K0038+860, K0040+728 - K0041+728 | Region V | Masbate 3rd DEO | Completed | ₱64.1M | 100% | High risk63 | —-0.093 |
| 14 | 19FJ0017NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, MASBATE-CATAINGAN-PLACER ROAD, K0039+505 - K0040+715, K0078+681 - K0078+850, K0081+521 - K0082+532 | Region V | Masbate 3rd DEO | Completed | ₱67.2M | 100% | High risk63 | —-0.088 |
| 15 | 20FJ0014LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, CONCRETING OF JUNCTION NATIONAL ROAD, BRGY. SAN PEDRO TO BRGY. CONCEPCION, MADAMBA AGUADA ROAD, CATAINGAN, MASBATE | Region V | Masbate 3rd DEO | Completed | ₱64.3M | 100% | High risk63 | —-0.094 |
| 16 | 17FJ0006ASSET PRES. OF NATL. RD NETWORK SERVICES - REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATL. ROADS INCL | Region V | Masbate 3rd DEO | Completed | ₱27.8M | 100% | High risk61 | —-0.053 |
| 17 | 17EB0060NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CROSSING MWCR (POLA)-CASAGUE-JCT ALAKAAC RD K0379 + 996 K0381 + 308, S00163MR, SANTA CRUZ, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱35.9M | 100% | High risk61 | —-0.020 |
| 18 | 22OF0247PREVENTIVE MAINTENANCE - SECONDARY ROADS COMMONWEALTH AVE (S05453LZ) K0016 + 000 - K0016 + 600, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.086 |
| 19 | 20D00033FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS PARIAN- SAN JOSE-BUCAL DIVERSION ROAD, LAGUNA | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk60 | —-0.085 |
| 20 | 18FM0016REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS WITH DRAINAGE - SAN FERNANDO NORTH ROAD. | Region V | Masbate 1st DEO | Completed | ₱46M | 100% | Medium risk59 | —-0.096 |
| 21 | 17EB0084CONCRETING OF ACCESS ROAD, BRGY. NICOLAS TO BRGY. ALIBOG, MAGSAYSAY, MINDORO OCCIDENTAL, MAGSAYSAY, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱45.7M | 100% | Medium risk59 | —-0.041 |
| 22 | 18FI0030ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE SECONDARY ROADS, MASBATE-CATAINGAN-PLACER RD, K00 | Region V | Masbate 2nd DEO | Completed | ₱14.5M | 100% | Medium risk59 | —-0.098 |
| 23 | 19FJ0033LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF DAPDAP-SIMAWA ROAD, USON, MASBATE | Region V | Masbate 3rd DEO | Completed | ₱18.6M | 100% | Medium risk58 | —-0.099 |
| 24 | 19FJ0032LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF DAPDAP-SIMAWA ROAD, USON, MASBATE | Region V | Masbate 3rd DEO | Completed | ₱27.9M | 100% | Medium risk58 | —-0.098 |
| 25 | 22FI0021ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MASBATE - MILAGROS RD. (S00015MT) - K0024+000 - K0024+274, MILAGROS, MASBATE | Region V | Masbate 2nd DEO | Completed | ₱16.2M | 100% | Medium risk58 | —-0.099 |