Opening the dossier…
Opening the dossier…
Contractor dossier
203 projects on file, including joint ventures this contractor is part of.
Total projects
203
Total budget
₱12.7B
Average progress
88.5%
Completion rate
76.4%
Average risk score
48.9
Medium risk on average, out of 100
Flagged as unusual
24
11.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 123 | ₱9B | 48.2 | 21 | 88.4% |
| Region VII | 79 | ₱3.6B | 50.0 | 3 | 88.5% |
| Region X | 1 | ₱14.7M | 45.3 | 0 | 91.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 93 | ₱5.8B | 45.3 | 3 | 93.4% |
| Buildings and Facilities | 49 | ₱2.4B | 46.5 | 3 | 88.5% |
| Flood Control and Drainage | 38 | ₱2.3B | 46.5 | 2 | 91.3% |
| Bridges | 8 | ₱668.3M | 50.8 | 4 | 85.0% |
| GAA 2025 SSP | 5 | ₱690.9M | 95.4 | 5 | 50.4% |
| GAA 2025 OO-1 | 4 | ₱335M | 94.3 | 4 | 10.2% |
| OTHER | 4 | ₱170.1M | 77.8 | 3 | 74.0% |
| Bridges, Roads | 2 | ₱294.3M | 52.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00059CONSTRUCTION OF BYPASS ROAD, MAGKIANGKANG, VILLA UNDAYON-NEW SALEM-MT CARMEL MT. ARARAT, PACKAGE 3, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱192M | 82% | High risk96 | Flagged0.033 |
| 25N00257(CLUSTER I) 1.) TUBAY-CABADBARAN COASTAL ROAD (CONSTRUCTION OF BRIDGE), AGUSAN DEL NORTE, 2.) CONSTRUCTION OF TUBAY-CABADBARAN BRIDGE, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱335.3M | 55% | High risk96 | Flagged0.043 |
| 25NH0125CONSTRUCTION (COMPLETION) OF ADELA SERRA TY MEMORIAL HOSPITAL, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.9M | 11% | High risk95 | Flagged0.042 |
| 25NH0136CONSTRUCTION (COMPLETION) OF MEDICAL SCHOOL BUILDING OF NEMSU, BARANGAY ROSARIO, TANDAG CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95M | 16% | High risk95 | Flagged0.047 |
| 25NB0019REHABILITATION OF DELTA BRIDGE ALONG POBLACION-MAGTUYOM SECTION, SAN LUIS, AGUSAN DEL SUR, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱19.6M | 88% | High risk95 | Flagged0.016 |
| 25NG0036SURIGAO - DAVAO COASTAL RD (S00358MN) - K1168+459.70 - K1169+941.50 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱66.9M | 1% | High risk94 | Flagged0.031 |
| 25NG0037SURIGAO-DAVAO COASTAL RD (S00358MN) - K1166+200 - K1168+459.70 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱76.4M | 1% | High risk94 | Flagged0.031 |
| 25NG0038SURIGAO-DAVAO COASTAL RD (S00358MN) - K1178+872 - K1179+334, K1201+010.45 - K1202+039, K1202+697 - K1205+025 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.5M | 1% | High risk94 | Flagged0.035 |
| 25N00269SAN LUIS BR. (B01974MN) ALONG BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA RD, PHASE I | Region XIII | Region XIII | On-Going | ₱96.2M | 38% | High risk94 | Flagged0.023 |
| 25NA0037CONCRETING OF TANUG-TANUGON-MAGDAGUNOT FMR, BRGY. POBLACION 2, TUBAY, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱14.9M | 100% | High risk84 | Flagged0.005 |
| 25N00202CONSTRUCTION (COMPLETION) OF REGIONAL OFFICE NO. XIII BUILDING, DOONGAN, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱96.5M | 44% | High risk79 | Flagged0.019 |
| 23NA0077CONSTRUCTION OF MULTI - PURPOSE BUILDING (SPORTS COMPLEX), BRGY. MABINI, CITY OF CABADBARAN, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | On-Going | ₱29.7M | 52% | High risk74 | Flagged0.017 |
| 17NA0029IMPROVEMENT/WIDENING OF BRIDGES TO MORE THAN 2 LANES, WIDENING OF BRIDGE-SANGHAN BRIDGE(B00845MN)ALONG DAANG MAHARLIKA(SURIGAO-AGUSAN SECTION), CABADBARAN CITY, AGUSAN DEL NORTE 2ND L.D. | Region XIII | Agusan del Norte DEO | Completed | ₱29.1M | 100% | High risk74 | —-0.030 |
| 24N00213CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING CONCEPCION BRIDGE IN BARANGAY CONCEPCION, CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱149.6M | 82% | High risk67 | Flagged0.038 |
| 25HD0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SIMALA, SIBONGA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱148.4M | 54% | High risk66 | Flagged0.005 |
| 17N00008CONSTRUCTION OF ROAD DIKE ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION), JABONGA, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱193M | 100% | High risk65 | —-0.012 |
| 24NH0122CONST. OF FLOOD CONTROL STRUCTURE AT TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱144.7M | 73% | High risk65 | Flagged0.046 |
| 21HH0159OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MAMBALING SOUTH BOULEVARD, PHASE 1, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱144.8M | 100% | High risk64 | —-0.070 |
| 25HD0096ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST-/MAINT- OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST- OF FLOOD MITIGATION STRUCTURE ALONG NAGA RIVER, SITIO BANKER, BRGY LUTAC, C | Region VII | Cebu 1st DEO | On-Going | ₱96.5M | 32% | High risk64 | —-0.015 |
| 25HD0102ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST OF FLOOD MITIGATION STRUCTURE ALONG NAGA RIVER, PUROK ACACIA, PROPER LUTAC, CIT | Region VII | Cebu 1st DEO | On-Going | ₱96.4M | 36% | High risk64 | —-0.017 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NH0136CONSTRUCTION (COMPLETION) OF MEDICAL SCHOOL BUILDING OF NEMSU, BARANGAY ROSARIO, TANDAG CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95M | 16% | High risk95 | Flagged0.047 |
| 24NH0122CONST. OF FLOOD CONTROL STRUCTURE AT TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱144.7M | 73% | High risk65 | Flagged0.046 |
| 25N00257(CLUSTER I) 1.) TUBAY-CABADBARAN COASTAL ROAD (CONSTRUCTION OF BRIDGE), AGUSAN DEL NORTE, 2.) CONSTRUCTION OF TUBAY-CABADBARAN BRIDGE, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱335.3M | 55% | High risk96 | Flagged0.043 |
| 25NH0125CONSTRUCTION (COMPLETION) OF ADELA SERRA TY MEMORIAL HOSPITAL, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.9M | 11% | High risk95 | Flagged0.042 |
| 24N00213CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING CONCEPCION BRIDGE IN BARANGAY CONCEPCION, CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱149.6M | 82% | High risk67 | Flagged0.038 |
| 25NG0038SURIGAO-DAVAO COASTAL RD (S00358MN) - K1178+872 - K1179+334, K1201+010.45 - K1202+039, K1202+697 - K1205+025 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.5M | 1% | High risk94 | Flagged0.035 |
| 25N00059CONSTRUCTION OF BYPASS ROAD, MAGKIANGKANG, VILLA UNDAYON-NEW SALEM-MT CARMEL MT. ARARAT, PACKAGE 3, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱192M | 82% | High risk96 | Flagged0.033 |
| 24NH0126CONST. OF MPB (GYMNASIUM), CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱99M | 30% | Medium risk52 | Flagged0.032 |
| 25NG0036SURIGAO - DAVAO COASTAL RD (S00358MN) - K1168+459.70 - K1169+941.50 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱66.9M | 1% | High risk94 | Flagged0.031 |
| 25NG0037SURIGAO-DAVAO COASTAL RD (S00358MN) - K1166+200 - K1168+459.70 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱76.4M | 1% | High risk94 | Flagged0.031 |
| 24HH0132CONSTRUCTION OF 4STY16CL, OPRRA NHS (DAY & NIGHT), CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱63.6M | 27% | Medium risk55 | Flagged0.027 |
| 18N00102CONSTRUCTION OF ADGAWAN BRIDGE AND APPROACHES ALONG SAN LUIS-BINICALAN ROAD, SAN LUIS, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱142.6M | 100% | Medium risk56 | Flagged0.023 |
| 25N00269SAN LUIS BR. (B01974MN) ALONG BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA RD, PHASE I | Region XIII | Region XIII | On-Going | ₱96.2M | 38% | High risk94 | Flagged0.023 |
| 25N00202CONSTRUCTION (COMPLETION) OF REGIONAL OFFICE NO. XIII BUILDING, DOONGAN, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱96.5M | 44% | High risk79 | Flagged0.019 |
| 23NA0077CONSTRUCTION OF MULTI - PURPOSE BUILDING (SPORTS COMPLEX), BRGY. MABINI, CITY OF CABADBARAN, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | On-Going | ₱29.7M | 52% | High risk74 | Flagged0.017 |
| 25NB0019REHABILITATION OF DELTA BRIDGE ALONG POBLACION-MAGTUYOM SECTION, SAN LUIS, AGUSAN DEL SUR, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱19.6M | 88% | High risk95 | Flagged0.016 |
| 17N00159TAGABASE - BAKINGKING FMR PHASE III - COMPLETION, ESPERANZA, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱130.3M | 100% | Medium risk46 | Flagged0.015 |
| 20NA0086READ - CONCRETING OF SITIO BULAK, BRGY. LOWER OLAVE FMR, BRGY. LOWER OLAVE, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Terminated | ₱56.2M | 57% | Medium risk49 | Flagged0.012 |
| 25N00270SALVACION BR. (B00790MN) ALONG NRJ CUEVAS-BISLIG RD, PHASE I | Region XIII | Region XIII | On-Going | ₱96.2M | 26% | Medium risk50 | Flagged0.011 |
| 25HD0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SIMALA, SIBONGA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱148.4M | 54% | High risk66 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25N00059CONSTRUCTION OF BYPASS ROAD, MAGKIANGKANG, VILLA UNDAYON-NEW SALEM-MT CARMEL MT. ARARAT, PACKAGE 3, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱192M | 82% | High risk96 | Flagged0.033 |
| 2 | 25N00257(CLUSTER I) 1.) TUBAY-CABADBARAN COASTAL ROAD (CONSTRUCTION OF BRIDGE), AGUSAN DEL NORTE, 2.) CONSTRUCTION OF TUBAY-CABADBARAN BRIDGE, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱335.3M | 55% | High risk96 | Flagged0.043 |
| 3 | 25NH0125CONSTRUCTION (COMPLETION) OF ADELA SERRA TY MEMORIAL HOSPITAL, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.9M | 11% | High risk95 | Flagged0.042 |
| 4 | 25NH0136CONSTRUCTION (COMPLETION) OF MEDICAL SCHOOL BUILDING OF NEMSU, BARANGAY ROSARIO, TANDAG CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95M | 16% | High risk95 | Flagged0.047 |
| 5 | 25NB0019REHABILITATION OF DELTA BRIDGE ALONG POBLACION-MAGTUYOM SECTION, SAN LUIS, AGUSAN DEL SUR, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱19.6M | 88% | High risk95 | Flagged0.016 |
| 6 | 25NG0036SURIGAO - DAVAO COASTAL RD (S00358MN) - K1168+459.70 - K1169+941.50 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱66.9M | 1% | High risk94 | Flagged0.031 |
| 7 | 25NG0037SURIGAO-DAVAO COASTAL RD (S00358MN) - K1166+200 - K1168+459.70 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱76.4M | 1% | High risk94 | Flagged0.031 |
| 8 | 25NG0038SURIGAO-DAVAO COASTAL RD (S00358MN) - K1178+872 - K1179+334, K1201+010.45 - K1202+039, K1202+697 - K1205+025 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.5M | 1% | High risk94 | Flagged0.035 |
| 9 | 25N00269SAN LUIS BR. (B01974MN) ALONG BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA RD, PHASE I | Region XIII | Region XIII | On-Going | ₱96.2M | 38% | High risk94 | Flagged0.023 |
| 10 | 25NA0037CONCRETING OF TANUG-TANUGON-MAGDAGUNOT FMR, BRGY. POBLACION 2, TUBAY, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱14.9M | 100% | High risk84 | Flagged0.005 |
| 11 | 25N00202CONSTRUCTION (COMPLETION) OF REGIONAL OFFICE NO. XIII BUILDING, DOONGAN, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱96.5M | 44% | High risk79 | Flagged0.019 |
| 12 | 23NA0077CONSTRUCTION OF MULTI - PURPOSE BUILDING (SPORTS COMPLEX), BRGY. MABINI, CITY OF CABADBARAN, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | On-Going | ₱29.7M | 52% | High risk74 | Flagged0.017 |
| 13 | 17NA0029IMPROVEMENT/WIDENING OF BRIDGES TO MORE THAN 2 LANES, WIDENING OF BRIDGE-SANGHAN BRIDGE(B00845MN)ALONG DAANG MAHARLIKA(SURIGAO-AGUSAN SECTION), CABADBARAN CITY, AGUSAN DEL NORTE 2ND L.D. | Region XIII | Agusan del Norte DEO | Completed | ₱29.1M | 100% | High risk74 | —-0.030 |
| 14 | 24N00213CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING CONCEPCION BRIDGE IN BARANGAY CONCEPCION, CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱149.6M | 82% | High risk67 | Flagged0.038 |
| 15 | 25HD0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SIMALA, SIBONGA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱148.4M | 54% | High risk66 | Flagged0.005 |
| 16 | 17N00008CONSTRUCTION OF ROAD DIKE ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION), JABONGA, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱193M | 100% | High risk65 | —-0.012 |
| 17 | 24NH0122CONST. OF FLOOD CONTROL STRUCTURE AT TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱144.7M | 73% | High risk65 | Flagged0.046 |
| 18 | 21HH0159OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MAMBALING SOUTH BOULEVARD, PHASE 1, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱144.8M | 100% | High risk64 | —-0.070 |
| 19 | 25HD0096ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST-/MAINT- OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST- OF FLOOD MITIGATION STRUCTURE ALONG NAGA RIVER, SITIO BANKER, BRGY LUTAC, C | Region VII | Cebu 1st DEO | On-Going | ₱96.5M | 32% | High risk64 | —-0.015 |
| 20 | 25HD0102ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST OF FLOOD MITIGATION STRUCTURE ALONG NAGA RIVER, PUROK ACACIA, PROPER LUTAC, CIT | Region VII | Cebu 1st DEO | On-Going | ₱96.4M | 36% | High risk64 | —-0.017 |
| 21 | 23H00050LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION (COMPLETION) OF DPWH REGIONAL OFFICE VII, ANNEX BUILDING, CEBU CITY | Region VII | Region VII | On-Going | ₱192.9M | 55% | High risk64 | Flagged0.002 |
| 22 | 21HI0139DESIGN AND BUILD FOR THE PROPOSED CONSTRUCTION OF 7 - STOREY ACADEMIC BUILDING AT CTU LILOAN CAMPUS, LILOAN, CEBU | Region VII | Cebu 5th DEO | Completed | ₱143.9M | 100% | High risk63 | —-0.054 |
| 23 | 21H00006LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF DPWH REGIONAL OFFICE VII, ANNEX BUILDING, CEBU CITY, SOUTH ROAD PROPERTIES (SRP), CEBU CITY | Region VII | Region VII | Completed | ₱144.8M | 100% | High risk63 | —-0.049 |
| 24 | 24HH0136OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MAMBALING SOUTH BOULEVARD, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱94.5M | 39% | High risk60 | —-0.036 |
| 25 | 23HH0123OO1: ENSURE SAFE AND RELIABLE NATIONAL ROADSYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MAMBALING SOUTH BOULEVARD, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱96.3M | 100% | High risk60 | —-0.043 |