Opening the dossier…
Opening the dossier…
Contractor dossier
203 projects on file, including joint ventures this contractor is part of.
Total projects
203
Total budget
₱12.7B
Average progress
88.5%
Completion rate
76.4%
Average risk score
48.9
Medium risk on average, out of 100
Flagged as unusual
24
11.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 123 | ₱9B | 48.2 | 21 | 88.4% |
| Region VII | 79 | ₱3.6B | 50.0 | 3 | 88.5% |
| Region X | 1 | ₱14.7M | 45.3 | 0 | 91.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 93 | ₱5.8B | 45.3 | 3 | 93.4% |
| Buildings and Facilities | 49 | ₱2.4B | 46.5 | 3 | 88.5% |
| Flood Control and Drainage | 38 | ₱2.3B | 46.5 | 2 | 91.3% |
| Bridges | 8 | ₱668.3M | 50.8 | 4 | 85.0% |
| GAA 2025 SSP | 5 | ₱690.9M | 95.4 | 5 | 50.4% |
| GAA 2025 OO-1 | 4 | ₱335M | 94.3 | 4 | 10.2% |
| OTHER | 4 | ₱170.1M | 77.8 | 3 | 74.0% |
| Bridges, Roads | 2 | ₱294.3M | 52.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00059CONSTRUCTION OF BYPASS ROAD, MAGKIANGKANG, VILLA UNDAYON-NEW SALEM-MT CARMEL MT. ARARAT, PACKAGE 3, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱192M | 82% | High risk96 | Flagged0.033 |
| 25N00257(CLUSTER I) 1.) TUBAY-CABADBARAN COASTAL ROAD (CONSTRUCTION OF BRIDGE), AGUSAN DEL NORTE, 2.) CONSTRUCTION OF TUBAY-CABADBARAN BRIDGE, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱335.3M | 55% | High risk96 | Flagged0.043 |
| 25NH0125CONSTRUCTION (COMPLETION) OF ADELA SERRA TY MEMORIAL HOSPITAL, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.9M | 11% | High risk95 | Flagged0.042 |
| 25NH0136CONSTRUCTION (COMPLETION) OF MEDICAL SCHOOL BUILDING OF NEMSU, BARANGAY ROSARIO, TANDAG CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95M | 16% | High risk95 | Flagged0.047 |
| 25NB0019REHABILITATION OF DELTA BRIDGE ALONG POBLACION-MAGTUYOM SECTION, SAN LUIS, AGUSAN DEL SUR, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱19.6M | 88% | High risk95 | Flagged0.016 |
| 25NG0036SURIGAO - DAVAO COASTAL RD (S00358MN) - K1168+459.70 - K1169+941.50 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱66.9M | 1% | High risk94 | Flagged0.031 |
| 25NG0037SURIGAO-DAVAO COASTAL RD (S00358MN) - K1166+200 - K1168+459.70 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱76.4M | 1% | High risk94 | Flagged0.031 |
| 25NG0038SURIGAO-DAVAO COASTAL RD (S00358MN) - K1178+872 - K1179+334, K1201+010.45 - K1202+039, K1202+697 - K1205+025 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.5M | 1% | High risk94 | Flagged0.035 |
| 25N00269SAN LUIS BR. (B01974MN) ALONG BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA RD, PHASE I | Region XIII | Region XIII | On-Going | ₱96.2M | 38% | High risk94 | Flagged0.023 |
| 25NA0037CONCRETING OF TANUG-TANUGON-MAGDAGUNOT FMR, BRGY. POBLACION 2, TUBAY, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱14.9M | 100% | High risk84 | Flagged0.005 |
| 25N00202CONSTRUCTION (COMPLETION) OF REGIONAL OFFICE NO. XIII BUILDING, DOONGAN, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱96.5M | 44% | High risk79 | Flagged0.019 |
| 23NA0077CONSTRUCTION OF MULTI - PURPOSE BUILDING (SPORTS COMPLEX), BRGY. MABINI, CITY OF CABADBARAN, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | On-Going | ₱29.7M | 52% | High risk74 | Flagged0.017 |
| 17NA0029IMPROVEMENT/WIDENING OF BRIDGES TO MORE THAN 2 LANES, WIDENING OF BRIDGE-SANGHAN BRIDGE(B00845MN)ALONG DAANG MAHARLIKA(SURIGAO-AGUSAN SECTION), CABADBARAN CITY, AGUSAN DEL NORTE 2ND L.D. | Region XIII | Agusan del Norte DEO | Completed | ₱29.1M | 100% | High risk74 | —-0.030 |
| 24N00213CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING CONCEPCION BRIDGE IN BARANGAY CONCEPCION, CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱149.6M | 82% | High risk67 | Flagged0.038 |
| 25HD0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SIMALA, SIBONGA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱148.4M | 54% | High risk66 | Flagged0.005 |
| 17N00008CONSTRUCTION OF ROAD DIKE ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION), JABONGA, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱193M | 100% | High risk65 | —-0.012 |
| 24NH0122CONST. OF FLOOD CONTROL STRUCTURE AT TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱144.7M | 73% | High risk65 | Flagged0.046 |
| 21HH0159OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MAMBALING SOUTH BOULEVARD, PHASE 1, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱144.8M | 100% | High risk64 | —-0.070 |
| 25HD0096ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST-/MAINT- OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST- OF FLOOD MITIGATION STRUCTURE ALONG NAGA RIVER, SITIO BANKER, BRGY LUTAC, C | Region VII | Cebu 1st DEO | On-Going | ₱96.5M | 32% | High risk64 | —-0.015 |
| 25HD0102ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST OF FLOOD MITIGATION STRUCTURE ALONG NAGA RIVER, PUROK ACACIA, PROPER LUTAC, CIT | Region VII | Cebu 1st DEO | On-Going | ₱96.4M | 36% | High risk64 | —-0.017 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NH0136CONSTRUCTION (COMPLETION) OF MEDICAL SCHOOL BUILDING OF NEMSU, BARANGAY ROSARIO, TANDAG CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95M | 16% | High risk95 | Flagged0.047 |
| 24NH0122CONST. OF FLOOD CONTROL STRUCTURE AT TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱144.7M | 73% | High risk65 | Flagged0.046 |
| 25N00257(CLUSTER I) 1.) TUBAY-CABADBARAN COASTAL ROAD (CONSTRUCTION OF BRIDGE), AGUSAN DEL NORTE, 2.) CONSTRUCTION OF TUBAY-CABADBARAN BRIDGE, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱335.3M | 55% | High risk96 | Flagged0.043 |
| 25NH0125CONSTRUCTION (COMPLETION) OF ADELA SERRA TY MEMORIAL HOSPITAL, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.9M | 11% | High risk95 | Flagged0.042 |
| 24N00213CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING CONCEPCION BRIDGE IN BARANGAY CONCEPCION, CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱149.6M | 82% | High risk67 | Flagged0.038 |
| 25NG0038SURIGAO-DAVAO COASTAL RD (S00358MN) - K1178+872 - K1179+334, K1201+010.45 - K1202+039, K1202+697 - K1205+025 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.5M | 1% | High risk94 | Flagged0.035 |
| 25N00059CONSTRUCTION OF BYPASS ROAD, MAGKIANGKANG, VILLA UNDAYON-NEW SALEM-MT CARMEL MT. ARARAT, PACKAGE 3, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱192M | 82% | High risk96 | Flagged0.033 |
| 24NH0126CONST. OF MPB (GYMNASIUM), CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱99M | 30% | Medium risk52 | Flagged0.032 |
| 25NG0036SURIGAO - DAVAO COASTAL RD (S00358MN) - K1168+459.70 - K1169+941.50 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱66.9M | 1% | High risk94 | Flagged0.031 |
| 25NG0037SURIGAO-DAVAO COASTAL RD (S00358MN) - K1166+200 - K1168+459.70 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱76.4M | 1% | High risk94 | Flagged0.031 |
| 24HH0132CONSTRUCTION OF 4STY16CL, OPRRA NHS (DAY & NIGHT), CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱63.6M | 27% | Medium risk55 | Flagged0.027 |
| 18N00102CONSTRUCTION OF ADGAWAN BRIDGE AND APPROACHES ALONG SAN LUIS-BINICALAN ROAD, SAN LUIS, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱142.6M | 100% | Medium risk56 | Flagged0.023 |
| 25N00269SAN LUIS BR. (B01974MN) ALONG BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA RD, PHASE I | Region XIII | Region XIII | On-Going | ₱96.2M | 38% | High risk94 | Flagged0.023 |
| 25N00202CONSTRUCTION (COMPLETION) OF REGIONAL OFFICE NO. XIII BUILDING, DOONGAN, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱96.5M | 44% | High risk79 | Flagged0.019 |
| 23NA0077CONSTRUCTION OF MULTI - PURPOSE BUILDING (SPORTS COMPLEX), BRGY. MABINI, CITY OF CABADBARAN, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | On-Going | ₱29.7M | 52% | High risk74 | Flagged0.017 |
| 25NB0019REHABILITATION OF DELTA BRIDGE ALONG POBLACION-MAGTUYOM SECTION, SAN LUIS, AGUSAN DEL SUR, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱19.6M | 88% | High risk95 | Flagged0.016 |
| 17N00159TAGABASE - BAKINGKING FMR PHASE III - COMPLETION, ESPERANZA, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱130.3M | 100% | Medium risk46 | Flagged0.015 |
| 20NA0086READ - CONCRETING OF SITIO BULAK, BRGY. LOWER OLAVE FMR, BRGY. LOWER OLAVE, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Terminated | ₱56.2M | 57% | Medium risk49 | Flagged0.012 |
| 25N00270SALVACION BR. (B00790MN) ALONG NRJ CUEVAS-BISLIG RD, PHASE I | Region XIII | Region XIII | On-Going | ₱96.2M | 26% | Medium risk50 | Flagged0.011 |
| 25HD0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SIMALA, SIBONGA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱148.4M | 54% | High risk66 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 20N00062GUIMNANA- MAHABA PROVINCIAL ROAD LEADING TO RIVER TUGNAW AND BARANAS FALLS, CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk45 | —-0.070 |
| 127 | 20N00072MAHABA PROVINCIAL ROAD LEADING TO SUMAG-A FALLS AND SABORO FALLS, CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk45 | —-0.070 |
| 128 | 21N00078SAN ANTONIO- LAVINTIK- MALINHAWOD AND PROVINCIAL ROAD IN SUPPORT TO ABACA FIBER PROCESSING, RTR, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱98.9M | 100% | Medium risk45 | —-0.072 |
| 129 | 22N00049CONSTRUCTION OF MAGKIANGKIANG, VILLA UNDAYON- NEW SALEM- MT. CARMEL- MT. ARARAT BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱111M | 100% | Medium risk45 | —-0.068 |
| 130 | 22N00009CANTILAN- MADRID BYPASS ROAD (SDCR ALTERNATE ROUTE), SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk45 | —-0.069 |
| 131 | 21N00031CONSTRUCTION OF NRJ DAANG MAHARLIKA- STA. IRENE- LA PURISIMA- SAN MIGUEL ROAD, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱105M | 100% | Medium risk45 | —-0.071 |
| 132 | 21N00058CONSTRUCTION (COMPLETION) OF REGIONAL OFFICE XIII BUILDING, DOONGAN, BUTUAN CITY (PACKAGE 2) | Region XIII | Region XIII | Completed | ₱96.5M | 100% | Medium risk45 | —-0.059 |
| 133 | 21N00057CONSTRUCTION (COMPLETION) OF REGIONAL OFFICE XIII BUILDING, DOONGAN, BUTUAN CITY (PACKAGE 1) | Region XIII | Region XIII | Completed | ₱96.5M | 100% | Medium risk45 | —-0.064 |
| 134 | 20N00054CONSTRUCTION (COMPLETION) OF REGIONAL OFFICE NO. XIII, DOONGAN BUTUAN CITY PHASE I, BRGY. DOONGAN, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱96.5M | 100% | Medium risk45 | —-0.065 |
| 135 | 22N00048CONSTRUCTION OF KAUSWAGAN-MAHARLIKA ROAD (PHASE 1), TALACOGON, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱111M | 100% | Medium risk45 | —-0.066 |
| 136 | 22NB0044CONSTRUCTION OF ROAD, SALVACION, OMOT ROAD, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱96.5M | 100% | Medium risk45 | —-0.065 |
| 137 | 22NB0045CONSTRUCTION OF MAGKIANGKIANG, VILLA UNDAYON NEW SALEM MT. CARMEL MT. ARAYAT BYPASS ROAD, BAYUGAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱96.5M | 100% | Medium risk45 | —-0.073 |
| 138 | 18HE0098CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT LIPATA CENTRAL ELEMENTARY SCHOOL, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱36.9M | 100% | Medium risk45 | —-0.045 |
| 139 | 22N00052CONSTRUCTION OF SALVACION-OMOT ROAD, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱111M | 100% | Medium risk45 | —-0.065 |
| 140 | 18NA0036ROAD WIDENING TERTIARY ROADS, AGUSAN MALAYBALAY RD., K1271+984 - K1272+445.60, K1273+000 - K1274+031.96, LAS NIEVES AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱58M | 100% | Medium risk44 | —-0.082 |
| 141 | 24HE0228CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) -MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION (PHASE 5) OF SPORTS FACILITY, CITY HALL COMPOUND LAWAAN II, CITY OF TALISAY, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱19.8M | 92% | Medium risk44 | —-0.008 |
| 142 | 22NB0046CONSTRUCTION OF ROAD, KAUSWAGAN MAHARLIKA (PHASE I), TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱72.4M | 100% | Medium risk43 | —-0.071 |
| 143 | 24NB0076NRJ MAUG-LA PURISIMA-NEW TUBIGON, PACKAGE 5, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱85.9M | 100% | Medium risk43 | —-0.076 |
| 144 | 24NA0004CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG AGAY RIVER, BARANGAY BALANG-BALANG, REMEDIOS T. ROMUALDEZ, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱72.2M | 100% | Medium risk43 | —-0.065 |
| 145 | 24NA0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGAY RIVER, BRGY. SAN ANTONIO, REMEDIOS T. ROMUALDEZ | Region XIII | Agusan del Norte DEO | Completed | ₱72.2M | 100% | Medium risk43 | —-0.063 |
| 146 | 23NB0039CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF KAUSWAGAN - MAHARLIKA ROAD, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱77.2M | 100% | Medium risk43 | —-0.074 |
| 147 | 21NH0092CONSTRUCTION OF DIKE REVETMENT ALONG LIANGAN RIVER, LIANGA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱81.7M | 100% | Medium risk43 | —-0.053 |
| 148 | 23NB0042CONSTRUCTION OF GRAVEL ROAD - NRJ MAUG - LA PURISIMA - NEW TUBIGON, PACKAGE 4, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱53M | 100% | Medium risk42 | —-0.079 |
| 149 | 20NA0029REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS, AGUSAN - MALAYBALAY ROAD (S00397MN)-K1274+901-K1275+072, K1276+371-K1276+467.57 | Region XIII | Agusan del Norte DEO | Completed | ₱49M | 100% | Medium risk42 | —-0.083 |
| 150 | 24N00099CONSTRUCTION (COMPLETION) OF REGIONAL OFFICE XIII BUILDING, DOONGAN, BUTUAN CITY (PACKAGE 1) | Region XIII | Region XIII | On-Going | ₱45.1M | 96% | Medium risk42 | —-0.045 |