203 projects on file, including joint ventures this contractor is part of.
Total projects
203
Total budget
₱12.7B
Average progress
88.5%
Completion rate
76.4%
Average risk score
48.9
Medium risk on average, out of 100
Flagged as unusual
24
11.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 123 | ₱9B | 48.2 | 21 | 88.4% |
| Region VII | 79 | ₱3.6B | 50.0 | 3 | 88.5% |
| Region X | 1 | ₱14.7M | 45.3 | 0 | 91.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 93 | ₱5.8B | 45.3 | 3 | 93.4% |
| Buildings and Facilities | 49 | ₱2.4B | 46.5 | 3 | 88.5% |
| Flood Control and Drainage | 38 | ₱2.3B | 46.5 | 2 | 91.3% |
| Bridges | 8 | ₱668.3M | 50.8 | 4 | 85.0% |
| GAA 2025 SSP | 5 | ₱690.9M | 95.4 | 5 | 50.4% |
| GAA 2025 OO-1 | 4 | ₱335M | 94.3 | 4 | 10.2% |
| OTHER | 4 | ₱170.1M | 77.8 | 3 | 74.0% |
| Bridges, Roads | 2 | ₱294.3M | 52.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00059CONSTRUCTION OF BYPASS ROAD, MAGKIANGKANG, VILLA UNDAYON-NEW SALEM-MT CARMEL MT. ARARAT, PACKAGE 3, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱192M | 82% | High risk96 | Flagged0.033 |
| 25N00257(CLUSTER I) 1.) TUBAY-CABADBARAN COASTAL ROAD (CONSTRUCTION OF BRIDGE), AGUSAN DEL NORTE, 2.) CONSTRUCTION OF TUBAY-CABADBARAN BRIDGE, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱335.3M | 55% | High risk96 | Flagged0.043 |
| 25NH0125CONSTRUCTION (COMPLETION) OF ADELA SERRA TY MEMORIAL HOSPITAL, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.9M | 11% | High risk95 | Flagged0.042 |
| 25NH0136CONSTRUCTION (COMPLETION) OF MEDICAL SCHOOL BUILDING OF NEMSU, BARANGAY ROSARIO, TANDAG CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95M | 16% | High risk95 | Flagged0.047 |
| 25NB0019REHABILITATION OF DELTA BRIDGE ALONG POBLACION-MAGTUYOM SECTION, SAN LUIS, AGUSAN DEL SUR, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱19.6M | 88% | High risk95 | Flagged0.016 |
| 25NG0036SURIGAO - DAVAO COASTAL RD (S00358MN) - K1168+459.70 - K1169+941.50 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱66.9M | 1% | High risk94 | Flagged0.031 |
| 25NG0037SURIGAO-DAVAO COASTAL RD (S00358MN) - K1166+200 - K1168+459.70 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱76.4M | 1% | High risk94 | Flagged0.031 |
| 25NG0038SURIGAO-DAVAO COASTAL RD (S00358MN) - K1178+872 - K1179+334, K1201+010.45 - K1202+039, K1202+697 - K1205+025 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.5M | 1% | High risk94 | Flagged0.035 |
| 25N00269SAN LUIS BR. (B01974MN) ALONG BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA RD, PHASE I | Region XIII | Region XIII | On-Going | ₱96.2M | 38% | High risk94 | Flagged0.023 |
| 25NA0037CONCRETING OF TANUG-TANUGON-MAGDAGUNOT FMR, BRGY. POBLACION 2, TUBAY, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱14.9M | 100% | High risk84 | Flagged0.005 |
| 25N00202CONSTRUCTION (COMPLETION) OF REGIONAL OFFICE NO. XIII BUILDING, DOONGAN, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱96.5M | 44% | High risk79 | Flagged0.019 |
| 23NA0077CONSTRUCTION OF MULTI - PURPOSE BUILDING (SPORTS COMPLEX), BRGY. MABINI, CITY OF CABADBARAN, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | On-Going | ₱29.7M | 52% | High risk74 | Flagged0.017 |
| 17NA0029IMPROVEMENT/WIDENING OF BRIDGES TO MORE THAN 2 LANES, WIDENING OF BRIDGE-SANGHAN BRIDGE(B00845MN)ALONG DAANG MAHARLIKA(SURIGAO-AGUSAN SECTION), CABADBARAN CITY, AGUSAN DEL NORTE 2ND L.D. | Region XIII | Agusan del Norte DEO | Completed | ₱29.1M | 100% | High risk74 | —-0.030 |
| 24N00213CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING CONCEPCION BRIDGE IN BARANGAY CONCEPCION, CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱149.6M | 82% | High risk67 | Flagged0.038 |
| 25HD0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SIMALA, SIBONGA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱148.4M | 54% | High risk66 | Flagged0.005 |
| 17N00008CONSTRUCTION OF ROAD DIKE ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION), JABONGA, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱193M | 100% | High risk65 | —-0.012 |
| 24NH0122CONST. OF FLOOD CONTROL STRUCTURE AT TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱144.7M | 73% | High risk65 | Flagged0.046 |
| 21HH0159OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MAMBALING SOUTH BOULEVARD, PHASE 1, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱144.8M | 100% | High risk64 | —-0.070 |
| 25HD0096ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST-/MAINT- OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST- OF FLOOD MITIGATION STRUCTURE ALONG NAGA RIVER, SITIO BANKER, BRGY LUTAC, C | Region VII | Cebu 1st DEO | On-Going | ₱96.5M | 32% | High risk64 | —-0.015 |
| 25HD0102ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST OF FLOOD MITIGATION STRUCTURE ALONG NAGA RIVER, PUROK ACACIA, PROPER LUTAC, CIT | Region VII | Cebu 1st DEO | On-Going | ₱96.4M | 36% | High risk64 | —-0.017 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NH0136CONSTRUCTION (COMPLETION) OF MEDICAL SCHOOL BUILDING OF NEMSU, BARANGAY ROSARIO, TANDAG CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95M | 16% | High risk95 | Flagged0.047 |
| 24NH0122CONST. OF FLOOD CONTROL STRUCTURE AT TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱144.7M | 73% | High risk65 | Flagged0.046 |
| 25N00257(CLUSTER I) 1.) TUBAY-CABADBARAN COASTAL ROAD (CONSTRUCTION OF BRIDGE), AGUSAN DEL NORTE, 2.) CONSTRUCTION OF TUBAY-CABADBARAN BRIDGE, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱335.3M | 55% | High risk96 | Flagged0.043 |
| 25NH0125CONSTRUCTION (COMPLETION) OF ADELA SERRA TY MEMORIAL HOSPITAL, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.9M | 11% | High risk95 | Flagged0.042 |
| 24N00213CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING CONCEPCION BRIDGE IN BARANGAY CONCEPCION, CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱149.6M | 82% | High risk67 | Flagged0.038 |
| 25NG0038SURIGAO-DAVAO COASTAL RD (S00358MN) - K1178+872 - K1179+334, K1201+010.45 - K1202+039, K1202+697 - K1205+025 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.5M | 1% | High risk94 | Flagged0.035 |
| 25N00059CONSTRUCTION OF BYPASS ROAD, MAGKIANGKANG, VILLA UNDAYON-NEW SALEM-MT CARMEL MT. ARARAT, PACKAGE 3, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱192M | 82% | High risk96 | Flagged0.033 |
| 24NH0126CONST. OF MPB (GYMNASIUM), CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱99M | 30% | Medium risk52 | Flagged0.032 |
| 25NG0036SURIGAO - DAVAO COASTAL RD (S00358MN) - K1168+459.70 - K1169+941.50 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱66.9M | 1% | High risk94 | Flagged0.031 |
| 25NG0037SURIGAO-DAVAO COASTAL RD (S00358MN) - K1166+200 - K1168+459.70 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱76.4M | 1% | High risk94 | Flagged0.031 |
| 24HH0132CONSTRUCTION OF 4STY16CL, OPRRA NHS (DAY & NIGHT), CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱63.6M | 27% | Medium risk55 | Flagged0.027 |
| 18N00102CONSTRUCTION OF ADGAWAN BRIDGE AND APPROACHES ALONG SAN LUIS-BINICALAN ROAD, SAN LUIS, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱142.6M | 100% | Medium risk56 | Flagged0.023 |
| 25N00269SAN LUIS BR. (B01974MN) ALONG BUTUAN CITY-TALACOGON-LORETO-VERUELA-STA. JOSEFA RD, PHASE I | Region XIII | Region XIII | On-Going | ₱96.2M | 38% | High risk94 | Flagged0.023 |
| 25N00202CONSTRUCTION (COMPLETION) OF REGIONAL OFFICE NO. XIII BUILDING, DOONGAN, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱96.5M | 44% | High risk79 | Flagged0.019 |
| 23NA0077CONSTRUCTION OF MULTI - PURPOSE BUILDING (SPORTS COMPLEX), BRGY. MABINI, CITY OF CABADBARAN, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | On-Going | ₱29.7M | 52% | High risk74 | Flagged0.017 |
| 25NB0019REHABILITATION OF DELTA BRIDGE ALONG POBLACION-MAGTUYOM SECTION, SAN LUIS, AGUSAN DEL SUR, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱19.6M | 88% | High risk95 | Flagged0.016 |
| 17N00159TAGABASE - BAKINGKING FMR PHASE III - COMPLETION, ESPERANZA, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱130.3M | 100% | Medium risk46 | Flagged0.015 |
| 20NA0086READ - CONCRETING OF SITIO BULAK, BRGY. LOWER OLAVE FMR, BRGY. LOWER OLAVE, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Terminated | ₱56.2M | 57% | Medium risk49 | Flagged0.012 |
| 25N00270SALVACION BR. (B00790MN) ALONG NRJ CUEVAS-BISLIG RD, PHASE I | Region XIII | Region XIII | On-Going | ₱96.2M | 26% | Medium risk50 | Flagged0.011 |
| 25HD0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SIMALA, SIBONGA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱148.4M | 54% | High risk66 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 25NA0022CONSTRUCTION OF SABO DAM ALONG BALEGUIAN CREEK, MARAIGUING CIS, JABONGA, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱14.6M | 100% | Medium risk38 | —-0.069 |
| 177 | 18NH0048NRJ TAGO POBLACION ROAD LEADING TO PROPOSED TAGO BAYWALK,BRGY. PURISIMA (POB.), TAGO,SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱39.7M | 100% | Medium risk38 | —-0.075 |
| 178 | 20NB0004CONSTRUCTION OF BANK PROTECTION ALONG WAWA RIVER (MAHAGKOT SECTION) DOWNSTREAM, BRGY. MAHAGKOT, ESPERANZA, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱29.4M | 100% | Medium risk38 | —-0.065 |
| 179 | 22NB0014CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION/REHABILITATION OF SINADYAP RIVER PHASE II, STA. 0+067.00 - STA. 0+429.00 (L/S), STA. 0+040.00 - STA. 0+430.00 (R/S), BAYUGAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱45.1M | 100% | Medium risk38 | —-0.065 |
| 180 | 23NA0036CONSTRUCTION OF MAMKAS FLOOD CONTROL PROJECT, BRGY. MAMKAS, KITCHARAO, AGUSAN DEL NORTE (PACKAGE 2) | Region XIII | Agusan del Norte DEO | Completed | ₱29.1M | 100% | Medium risk38 | —-0.071 |
| 181 | 24NA0031CONSTRUCTION OF MAMKAS FLOOD CONTROL PROJECT, PACKAGE 2, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱24.4M | 100% | Medium risk38 | —-0.072 |
| 182 | 23NA0035CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGAY RIVER, BRGY. SAN ANTONIO RTR, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱24.4M | 100% | Medium risk38 | —-0.066 |
| 183 | 23NA0034CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGAY RIVER, BRGY. BALANG-BALANG RTR, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱24.2M | 100% | Medium risk38 | —-0.068 |
| 184 | 24NA0020CONSTRUCTION OF BALEGUIAN CIS SLOPE PROTECTION WORKS, JABONGA, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱19.6M | 100% | Medium risk38 | —-0.070 |
| 185 | 18NB0049CONSTRUCTION OF BANK PROTECTION ALONG AGUSAN RIVER, TALACOGON, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱27.5M | 100% | Medium risk37 | —-0.065 |
| 186 | 20NC0065CONSTRUCTION OF BANK/SLOPE PROTECTION ALONG LAPAG CREEK, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱19.6M | 100% | Medium risk37 | —-0.061 |
| 187 | 21NC0029CONSTRUCTION OF BANK IMPROVEMENT AND IMPROVEMENT OF MAINIT-MAPUTI CREEK (PHASE II), SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱14.9M | 100% | Medium risk37 | —-0.062 |
| 188 | 20NC0067CONSTRUCTION OF BANK PROTECTION AND IMPROVEMENT OF MAINIT-MAPUTI CREEK, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱21M | 100% | Medium risk37 | —-0.062 |
| 189 | 18N00095CONSTRUCTION OF REGIONAL EVACUATION CENTER, PUROK 8, BRGY. SAN ISIDRO, LAS NIEVES, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱34.7M | 100% | Medium risk37 | —-0.072 |
| 190 | 22NB0036CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), ESPERANZA, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱29.4M | 100% | Medium risk37 | —-0.069 |
| 191 | 18NI0030CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS-ACCESS ROAD LEADING TO TABON PORT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱31.4M | 100% | Medium risk37 | —-0.072 |
| 192 | 24NI0080CONCRETING OF PUROK 1 TO PUROK SITIO GUINHALINAN, BRGY. JAVIER FMR, BAROBO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱39.8M | 100% | Medium risk37 | —-0.020 |
| 193 | 18NB0044CONSTRUCTION OF CONCRETE DIKE ALONG POBLACION-MAGTUYON-TALACOGON (PHASE II), POBLACION, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱21.2M | 100% | Medium risk36 | —-0.065 |
| 194 | 18N00094CONSTRUCTION OF REGIONAL EVACUATION CENTER, BRGY. DEL MONTE, TALACOGON, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱34.7M | 100% | Medium risk36 | —-0.068 |
| 195 | 20NC0142CONCRETING OF BRGY. LA FORTUNA TO PUROK 5 TO PUROK 6, BRGY. SINOBONG FMR, VERUELA, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱24.9M | 100% | Medium risk36 | —-0.024 |
| 196 | 20NA0085READ - CONCRETING OF SITIO AFGA TO SITIO BULAK FMR, BRGY. OLAVE, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Terminated | ₱9.7M | 76% | Medium risk34 | Flagged0.003 |
| 197 | 22NA0035CONCRETING OF PUROK 7, BRGY. LOWER OLAVE FMR, BRGY. LOWER OLAVE, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱11.9M | 100% | Medium risk34 | —-0.039 |
| 198 | 19NA0066CONCRETING OF SITIO MASUNDONG-GUIMNANAN BRGY. MAHABA FMR PHASE II, BRGY. MAHABA CABADBARAN CITY | Region XIII | Agusan del Norte DEO | Completed | ₱9.7M | 100% | Medium risk34 | —-0.036 |
| 199 | 20HE0075BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF A MULTI-PURPOSE BUILDING PROJECT, ENHANCEMENT AND IMPROVEMENT OF TALISAY PUBLIC PLAZA AND HERITAGE PARK IN BRGY. POBLACION, CITY OF TALISAY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.7M | 100% | Low risk30 | —-0.096 |
| 200 | 16N00042REHABILITATION OF SAN LUIS - BINICALAN ROAD (PHASE 3), INCLUDING ONE (1) BRIDGE (TAGBULAKAN BRIDGE), SAN LUIS, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱1.8M | 100% | Low risk21 | —-0.048 |