Contractor dossier
57 projects on file, including joint ventures this contractor is part of.
Total projects
57
Total budget
₱1.1B
Average progress
99.3%
Completion rate
96.5%
Average risk score
29.2
Low risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 57 | ₱1.1B | 29.2 | 0 | 99.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 28 | ₱356.4M | 27.2 | 0 | 99.9% |
| Flood Control and Drainage | 20 | ₱637.1M | 30.5 | 0 | 98.2% |
| Buildings and Facilities | 4 | ₱28.7M | 32.6 | 0 | 100.0% |
| Bridges | 4 | ₱19.8M | 18.1 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱29.4M | 88.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CH0020CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BARANGAY SAN ANTONIO (PHASE II), FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱29.4M | 100% | High risk89 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CH0020CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BARANGAY SAN ANTONIO (PHASE II), FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱29.4M | 100% | High risk89 | —-0.030 |
| 2 | 23CH0079CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES, GUMAIN-PORAC RIVER AT LUBAO AND FLORIDABLANCA, PAMPANGA, LUBAO AND FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.079 |
| 3 | 17CH0131CONCRETING OF BARANGAY SAN PEDRO PALCARANGAN FMR, BRGY. SAN PEDRO PALCARANGAN, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱4.8M | 100% | Medium risk55 | —-0.009 |
| 4 | 23CH0012SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CAULAMAN RIVER IRRIGATION SYSTEM MAIN CANAL SERVICE ROAD, FLORIDABLANCA | Region III | Pampanga 2nd DEO | Completed | ₱64.2M | 100% | Medium risk41 | —-0.098 |
| 5 | 24CH0086IMPROVEMENT OF LUBAO-FLORIDABLANCA VIA SAN PABLO ROAD, SAN ANTONIO-CABANGCALAN, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱59.4M | 100% | Medium risk40 | —-0.099 |
| 6 | 25CH0007ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - LUBAO DIVERSION RD. - K0084+(-882)-K0084+561, K0084+963-K0085+238, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱53.3M | 98% | Medium risk38 | —-0.070 |
| 7 | 22CH0050CONSTRUCTION OF 2-BAY ADAC HANGAR, 5TH FW, BASA AIR BASE, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱19.6M | 100% | Medium risk35 | —-0.100 |
| 8 | 19CH0129CONSTRUCTION OF ROAD NETWORK AT BASA AIR BASE, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱19.6M | 100% | Medium risk34 | —-0.103 |
| 9 | 19CH0051ASSET-PRESERVATION-PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-SAN FERNANDO-LUBAO ROAD K0085+676-K0085+1076.00, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱24.5M | 100% | Medium risk34 | —-0.104 |
| 10 | 24CH0137CONCRETING OF BRGY. FORTUNA FMR, BRGY. FORTUNA, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱14.9M | 100% | Medium risk34 | —-0.042 |
| 11 | 22CH0041CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG PORAC RIVER, ASCOMO-PULUNGMASLE, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱48.8M | 100% | Medium risk33 | —-0.090 |
| 12 | 23CH0064CONSTRUCTION OF SLOPE PROTECTION ALONG BARANGAY SAN ANTONIO, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.091 |
| 13 | 22CH0053CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG PORAC RIVER, JALUNG SECTION, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱48.8M | 100% | Medium risk33 | —-0.090 |
| 14 | 18CH0110CONSTRUCTION/CONCRETING OF ROAD AND CANALIZATION, BARANGAY JALUNG, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱14.3M | 100% | Medium risk32 | —-0.103 |
| 15 | 17CH0063CONSTRUCTION OF MULTI-PURPOSE BUILDING IN DEL CARMEN ELEM. SCHOOL, DEL CARMEN, FLORIDABLANCA, PAMPAN | Region III | Pampanga 2nd DEO | Completed | ₱1.9M | 100% | Medium risk32 | —-0.071 |
| 16 | 17CH0067CONSTRUCTION/IMPROVEMENT OF MULTI-PURPOSE BUILDING IN PIO, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱1.9M | 100% | Medium risk32 | —-0.071 |
| 17 | 23CH0055CONSTRUCTION OF SLOPE PROTECTION WITH ROAD DIKE ALONG GPDC, STA. RITA - CITY OF SAN PEDRO, PAMPANGA, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.091 |
| 18 | 23CH0118IMPROVEMENT/REHABILITATION OF SIX (6) CLASSROOM SCHOOL BUILDING AT VALDEZ ELEMENTARY SCHOOL, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱5.2M | 100% | Medium risk31 | —-0.105 |
| 19 | 19CH0055REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE STA. CRUZ BR. 1 (B01505LZ) ALONG JOSE ABAD SANTOS AVENUE (JASA), LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱5.8M | 100% | Medium risk30 | —-0.063 |
| 20 | 19CH0076CONCRETING OF ROAD ALONG SITIO TELAPATIO IN BRGY. JALUNG, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱7.4M | 100% | Medium risk30 | —-0.103 |
| 21 | 19CH0108RIPRAPPING AND CONCRETING OF ROAD SHOULDER AT ECO PARK IN BARANGAY SAN ISIDRO, STA. RITA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱9.9M | 100% | Medium risk30 | —-0.104 |
| 22 | 21CH0089FLOOD MANAGEMENT PROGRAM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION (WITH CONCRETING OF TOP DIKE) GPDC, SAN PABLO-STA. RITA, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱29.4M | 100% | Low risk30 | —-0.090 |
| 23 | 21CH0030LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF ROAD, BARANGAY ANBON, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱4.9M | 100% | Low risk30 | —-0.104 |
| 24 | 21CH0047LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - REHABILITATION OF ROAD BARANGAY SINURA, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱4.9M | 100% | Low risk30 | —-0.104 |
| 25 | 17CH0073ROAD CONCRETING IN STA. CRUZ, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱1.9M | 100% | Low risk30 | —-0.063 |