Contractor dossier
86 projects on file, including joint ventures this contractor is part of.
Total projects
86
Total budget
₱3.6B
Average progress
98.7%
Completion rate
83.7%
Average risk score
54.3
Medium risk on average, out of 100
Flagged as unusual
2
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 82 | ₱3.4B | 54.5 | 2 | 98.7% |
| Region II | 4 | ₱212.9M | 50.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 48 | ₱2.6B | 53.4 | 0 | 99.2% |
| Roads | 18 | ₱657.1M | 53.1 | 0 | 99.2% |
| Buildings and Facilities | 12 | ₱77.4M | 48.6 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱28.5M | 51.7 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱99.6M | 89.0 | 1 | 76.8% |
| OTHER | 2 | ₱57.9M | 70.8 | 1 | 99.8% |
| GAA 2025 OO-1 | 1 | ₱29.4M | 93.1 | 0 | 91.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0014OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0645+000 - K0645+243.5 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱29.4M | 91% | High risk93 | —-0.001 |
| 25PC0050OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONS/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONS OF FLOOD CONTROL STRUCTURE, STA. FILOMENA, STA. 0+000 - STA. 0+800, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱56.1M | 54% | High risk90 | Flagged0.007 |
| 25PB0008ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AL | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱43.5M | 100% | High risk88 | —-0.006 |
| 23PB0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY MAWIGUE, CONNER | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.5M | 100% | High risk80 | Flagged0.011 |
| 21PC0018FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF POBLACION FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER STA. 136+247.68-STA.136+752.68/(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱92.7M | 100% | High risk63 | —-0.044 |
| 22BD0089OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG. - CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECT, NATAPPIAN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱93M | 100% | High risk62 | —-0.051 |
| 24PC0049CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF POBLACION-LANGNAO-BALIWANAN ROAD, BRGY POBLACION & LANGNAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱48.4M | 100% | High risk62 | —-0.012 |
| 23PC0040CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER BASIN, BARANGAY SAN SEBASTIAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.047 |
| 23PC0041CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER BASIN, BAROCBOC-SAN MARIANO, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.042 |
| 19PC0026CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER (STA 0+000-STA0+500), BAROCBOC, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱93.6M | 100% | High risk61 | —-0.048 |
| 20PC0015CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱93.6M | 100% | High risk61 | —-0.051 |
| 23PC0027OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG.-CONS./REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS. OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC.,BAROCBOC SEC,STA. 19+657-STA 20+135 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.052 |
| 24PC0028OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF SLOPE PROTECTION ALONG CALOG CREEK(TRIBUTARY OF APAYAO-ABULUG RIVER BASIN), BRGY CAPAGA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱96.5M | 95% | High risk61 | —-0.012 |
| 21PC0009CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, STA. 20+135-STA. 20 +613(L/S), STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23PB0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY MAWIGUE, CONNER | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.5M | 100% | High risk80 | Flagged0.011 |
| 25PC0050OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONS/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONS OF FLOOD CONTROL STRUCTURE, STA. FILOMENA, STA. 0+000 - STA. 0+800, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱56.1M | 54% | High risk90 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25PC0014OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0645+000 - K0645+243.5 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱29.4M | 91% | High risk93 | —-0.001 |
| 2 | 25PC0050OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONS/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONS OF FLOOD CONTROL STRUCTURE, STA. FILOMENA, STA. 0+000 - STA. 0+800, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱56.1M | 54% | High risk90 | Flagged0.007 |
| 3 | 25PB0008ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AL | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱43.5M | 100% | High risk88 | —-0.006 |
| 4 | 23PB0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY MAWIGUE, CONNER | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.5M | 100% | High risk80 | Flagged0.011 |
| 5 | 21PC0018FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF POBLACION FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER STA. 136+247.68-STA.136+752.68/(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱92.7M | 100% | High risk63 | —-0.044 |
| 6 | 22BD0089OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG. - CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECT, NATAPPIAN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱93M | 100% | High risk62 | —-0.051 |
| 7 | 24PC0049CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF POBLACION-LANGNAO-BALIWANAN ROAD, BRGY POBLACION & LANGNAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱48.4M | 100% | High risk62 | —-0.012 |
| 8 | 23PC0040CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER BASIN, BARANGAY SAN SEBASTIAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.047 |
| 9 | 23PC0041CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER BASIN, BAROCBOC-SAN MARIANO, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.042 |
| 10 | 19PC0026CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER (STA 0+000-STA0+500), BAROCBOC, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱93.6M | 100% | High risk61 | —-0.048 |
| 11 | 20PC0015CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱93.6M | 100% | High risk61 | —-0.051 |
| 12 | 23PC0027OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG.-CONS./REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS. OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC.,BAROCBOC SEC,STA. 19+657-STA 20+135 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.052 |
| 13 | 24PC0028OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF SLOPE PROTECTION ALONG CALOG CREEK(TRIBUTARY OF APAYAO-ABULUG RIVER BASIN), BRGY CAPAGA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱96.5M | 95% | High risk61 | —-0.012 |
| 14 | 21PC0009CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, STA. 20+135-STA. 20 +613(L/S), STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.052 |
| 15 | 24PB0006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM, PAVING OF UNPAVED-TERTIARY ROADS | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱106.6M | 100% | Medium risk59 | —-0.036 |
| 16 | 18PC0006PACKAGE I: 1. CONSTRUCTION OF SIPA FLOOD CONTROL STRUCTURES ALONG APAYAO RIVER STA. 0+690-STA 1+164, STA. MARCELA, APAYAO, 2. CONSTRUCTION OF SIPA FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER STA. 1+164-STA 1+632, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱89.9M | 100% | Medium risk59 | —-0.055 |
| 17 | 19PC0039CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CONSTRUCTION OF SIPA FLOOD CONTROL STRUCTURE ALONG APAYAO-ABULUG RIVER BASIN, STA 1+499-2+299, SIPA, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱84.3M | 100% | Medium risk56 | —-0.054 |
| 18 | 22PC0014CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURES, SWAN SECTION, STA.37+121 - STA.37+682 (R/S) PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱79.6M | 100% | Medium risk56 | —-0.054 |
| 19 | 21PC0007NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS-ADAMS (ILOCOS NORTE)-CALANASAN (APAYAO) ROAD, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.4M | 100% | Medium risk56 | —-0.061 |
| 20 | 25PC0033OO1:ENSURE SAFE & RELIABLE NATL RD SYSTEM-ASSET PRESERVATION PROG-REHAB/RECONS/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD-K0669+250-K0669+400, K0669+700-K0670+024 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱17.9M | 86% | Medium risk55 | —-0.044 |
| 21 | 18PC0031CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES DAGUPAN-SALVACION ROAD IN SUPPORT OF HANDICRAFT FURNITURE, PINEAPPLE, BANANA, VEGETABLE, RICE, CORN, INDUSTRIES 0+000-1+140 DAGUPAN-SALVACION, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱19.2M | 100% | Medium risk55 | —-0.077 |
| 22 | 24PC0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM(BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF POBLACION-LANGNAO-BALIWANAN ROAD, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱48.8M | 98% | Medium risk55 | —-0.043 |
| 23 | 23PC0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING (FLORA EDUCATION DISTRICT), BARANGAY POBLACION WEST, FLORA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.4M | 100% | Medium risk55 | —-0.076 |
| 24 | 19PC0008NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION ALONG KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD, K0643+592-K0643+750, K0643+770-K0649+000, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱46.4M | 100% | Medium risk55 | —-0.071 |
| 25 | 23PB0012NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS APAYAO-CAGAYAN ROAD (ILI-GUINAMGAMMAN-RIZAL ROAD) - (S00694LZ) CHAINAGE 3027 - CHAINAGE 6054 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱72.4M | 100% | Medium risk55 | —-0.076 |