Contractor dossier
86 projects on file, including joint ventures this contractor is part of.
Total projects
86
Total budget
₱3.6B
Average progress
98.7%
Completion rate
83.7%
Average risk score
54.3
Medium risk on average, out of 100
Flagged as unusual
2
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 82 | ₱3.4B | 54.5 | 2 | 98.7% |
| Region II | 4 | ₱212.9M | 50.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 48 | ₱2.6B | 53.4 | 0 | 99.2% |
| Roads | 18 | ₱657.1M | 53.1 | 0 | 99.2% |
| Buildings and Facilities | 12 | ₱77.4M | 48.6 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱28.5M | 51.7 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱99.6M | 89.0 | 1 | 76.8% |
| OTHER | 2 | ₱57.9M | 70.8 | 1 | 99.8% |
| GAA 2025 OO-1 | 1 | ₱29.4M | 93.1 | 0 | 91.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0014OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0645+000 - K0645+243.5 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱29.4M | 91% | High risk93 | —-0.001 |
| 25PC0050OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONS/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONS OF FLOOD CONTROL STRUCTURE, STA. FILOMENA, STA. 0+000 - STA. 0+800, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱56.1M | 54% | High risk90 | Flagged0.007 |
| 25PB0008ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AL | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱43.5M | 100% | High risk88 | —-0.006 |
| 23PB0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY MAWIGUE, CONNER | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.5M | 100% | High risk80 | Flagged0.011 |
| 21PC0018FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF POBLACION FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER STA. 136+247.68-STA.136+752.68/(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱92.7M | 100% | High risk63 | —-0.044 |
| 22BD0089OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG. - CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECT, NATAPPIAN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱93M | 100% | High risk62 | —-0.051 |
| 24PC0049CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF POBLACION-LANGNAO-BALIWANAN ROAD, BRGY POBLACION & LANGNAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱48.4M | 100% | High risk62 | —-0.012 |
| 23PC0040CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER BASIN, BARANGAY SAN SEBASTIAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.047 |
| 23PC0041CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER BASIN, BAROCBOC-SAN MARIANO, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.042 |
| 19PC0026CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER (STA 0+000-STA0+500), BAROCBOC, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱93.6M | 100% | High risk61 | —-0.048 |
| 20PC0015CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱93.6M | 100% | High risk61 | —-0.051 |
| 23PC0027OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG.-CONS./REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS. OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC.,BAROCBOC SEC,STA. 19+657-STA 20+135 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.052 |
| 24PC0028OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF SLOPE PROTECTION ALONG CALOG CREEK(TRIBUTARY OF APAYAO-ABULUG RIVER BASIN), BRGY CAPAGA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱96.5M | 95% | High risk61 | —-0.012 |
| 21PC0009CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, STA. 20+135-STA. 20 +613(L/S), STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23PB0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY MAWIGUE, CONNER | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.5M | 100% | High risk80 | Flagged0.011 |
| 25PC0050OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONS/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONS OF FLOOD CONTROL STRUCTURE, STA. FILOMENA, STA. 0+000 - STA. 0+800, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱56.1M | 54% | High risk90 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 19PC0031CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF SAN SEBASTIAN FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, SAN SEBASTIAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱19M | 100% | Medium risk52 | —-0.065 |
| 52 | 18PC0033CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES PANAY-BATO SABEL ROAD IN SUPPORT OF CASSAVA, CORN, RICE, MANDARIN, TOURISM HANDICRAFTS, FURNITURE AND COCONUT 0+000-0+880, PANAY-BATO-SABEL STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱19M | 100% | Medium risk52 | —-0.079 |
| 53 | 18PC0015CONSTRUCTION OF ELEAZAR FLOOD CONTROL, BRGY. ELEAZAR, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱23.4M | 100% | Medium risk52 | —-0.063 |
| 54 | 21PC0047BUILDINGS AND OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING (ASSOCIATION OF BARANGAY CAPTAINS), STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.8M | 100% | Medium risk52 | —-0.067 |
| 55 | 22PB0010FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE-CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL STRUCTURE, STA. 38+293-STA.39 +543 (L/S) BRGY. MALAMA, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱51.8M | 100% | Medium risk52 | —-0.060 |
| 56 | 21PC0010CONSTRUCTION OF SIPA-SAN MARIANO FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, STA. 25+380-STA. 25+700 (L/S) STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱45.9M | 100% | Medium risk51 | —-0.060 |
| 57 | 20PC0057CONSTRUCTION OF SIPA FLOOD CONTROL STRUCTURE STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱19M | 100% | Medium risk51 | —-0.065 |
| 58 | 22PC0049(CSSP)-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL IT)-SAN CARLOS PALALI-MALEKKEG ROAD IN SUPPORT OF CASSAVA, CORN, RICE, MANDARIN, TOURISM, HANDICRAFT, FURNITURE AND COCONUT, SANTA MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.9M | 100% | Medium risk51 | —-0.075 |
| 59 | 24PC0054CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM(BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CALABIGAN FLOOD CONTROL STRUCTURE, BARANGAY CALABIGAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱21.5M | 100% | Medium risk51 | —-0.027 |
| 60 | 23PC0066CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE FACILITIES-CONSTRUCTION OF CALABIGAN FLOOD CONTROL STRUCTURE, BRGY. CALABIGAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱14.2M | 100% | Medium risk51 | —-0.062 |
| 61 | 18PC0080REHABILITATION OF CALOG CREEK, POBLACION, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱55.3M | 100% | Medium risk51 | —-0.012 |
| 62 | 23PB0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM, CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY BANBAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱9.5M | 100% | Medium risk51 | —-0.044 |
| 63 | 23PB0031ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS, KABUGAO-PUDTOL-LUNA-CAGAYAN BRDY RD- K0604+(-053) - K0604+025, K0591+620 - K0591+645, K0600+780 - K0600+824 | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱16.6M | 100% | Medium risk51 | —-0.039 |
| 64 | 19PC0106REHABILITATION OF POBLACION CALANASAN FLOOD CONTROL STRUCTURE POBLACION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱36.7M | 100% | Medium risk50 | —-0.015 |
| 65 | 23PC0077CONSTRUCTION OF 1 STOREY 2 CL SCHOOL BUILDING, ATOK ELEMENTARY SCHOOL, FLORA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱6M | 100% | Medium risk50 | —-0.042 |
| 66 | 21PC0019CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITH IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTON OF CABICUNGAN FLOOD CONTROL STRUCTURE STA. 13+180-13+280(L/S), STA. 13+580-13+605(L/S), STA. 13+230-13+430(R/S), STA.13+460-13+510(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱47.5M | 100% | Medium risk50 | —-0.058 |
| 67 | 22PC0034ORG. OUTCOME 2:PROTECT LIVES AND PROP. AGAINST MAJOR FLOODS CONS/REHAB OF FLOOD MITIGATION FACIL. WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS. OF CABICUNGAN RIVER BASIN FLOOD CONTROL STRUCTURE, DAPPAY SECTION, STA. 11+470-STA.12+090(R/S),CALANASAN | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.058 |
| 68 | 22PC0068CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS CONSTRUCTION OF STA FILOMENA FLOOD CONTROL STRUCTURE, STA 0+440 - STA 1+400, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱47.2M | 100% | Medium risk50 | —-0.054 |
| 69 | 23PC0081CONSTRUCTION OF 1 STOREY 2 CL SCHOOL BUILDING, SAN JOSE INTEGRATED SCHOOL, FLORA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱6M | 100% | Medium risk50 | —-0.042 |
| 70 | 23PB0049CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM, CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY ALANGIGAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱9.5M | 100% | Medium risk50 | —-0.044 |
| 71 | 18PC0028CONSTRUCTION OF CADACLAN FLOOD CONTROL, BRGY. CADACLAN, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱33M | 100% | Medium risk50 | —-0.060 |
| 72 | 18PC0012CONSTRUCTION OF STA. ROSA FLOOD CONTROL, BRGY, STA. FILOMENA, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱28M | 100% | Medium risk49 | —-0.060 |
| 73 | 23PC0094CONSTRUCTION OF FLOOD CONTROL STRUCTURE SITIO SINIGPIT, BRGY. STA. FILOMENA, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱48.3M | 100% | Medium risk49 | —-0.008 |
| 74 | 21PC0067LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - DRAINAGE/PROTECTION WORKS-CONSTRUCTION OF STA. FILOMENA FLOODWAY/FLOOD CONTROL STRUCTURE, STA. FILOMENA, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.9M | 100% | Medium risk49 | —-0.059 |
| 75 | 18PL0064CONSTRUCTION OF FLOOD CONTROL (BOLISLIS SITE) ALONG CHICO RIVER, PASONGLAO, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱25.8M | 100% | Medium risk49 | —-0.060 |