Opening the dossier…
Opening the dossier…
Contractor dossier
102 projects on file, including joint ventures this contractor is part of.
Total projects
102
Total budget
₱2.1B
Average progress
98.4%
Completion rate
95.1%
Average risk score
41.1
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 80 | ₱1.9B | 45.2 | 0 | 97.9% |
| Region III | 15 | ₱102M | 21.9 | 0 | 100.0% |
| Region VI | 4 | ₱67.1M | 41.2 | 0 | 100.0% |
| Region IV-A | 3 | ₱22.8M | 27.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 37 | ₱696.4M | 39.3 | 0 | 95.5% |
| Roads | 31 | ₱521.5M | 39.6 | 0 | 100.0% |
| Flood Control and Drainage | 29 | ₱723.1M | 42.1 | 0 | 100.0% |
| OTHER | 2 | ₱52.9M | 54.7 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱48.5M | 94.6 | 0 | 100.0% |
| Bridges | 1 | ₱19.6M | 47.2 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱3.1M | 37.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OB0319CONSTRUCTION OF SLOPE PROTECTION, SAPANG USUSAN (MALIIT), CAYETANO BLVD. TO BASEBALL FIELD, BARANGAY USUSAN, TAGUIG CITY (PHASE 1) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱48.5M | 100% | High risk95 | —-0.002 |
| 23OB0426CONSTRUCTION OF PPTA BYPASS ROAD TO CAYETANO BLVD., TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱94.6M | 100% | High risk61 | —-0.081 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 18CD0158COMPLETION OF MULTI-PURPOSE BUILDING BARANGAY PEREZ, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱1.9M | 100% | Low risk9 | —-0.106 |
| 102 | 21CC0039CONSTRUCTION OF MULTI-PURPOSE BUILDING (PILAK HEAD OFFICE), BARANGAY BUNSURAN 1ST, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱1.9M | 100% | Low risk8 | —-0.107 |