Contractor dossier
253 projects on file, including joint ventures this contractor is part of.
Total projects
253
Total budget
₱16.3B
Average progress
92.4%
Completion rate
78.7%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
28
11.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 218 | ₱15B | 56.0 | 27 | 91.6% |
| Region V | 15 | ₱521.7M | 54.0 | 1 | 100.0% |
| Region VII | 9 | ₱313.8M | 46.9 | 0 | 100.0% |
| Region IV-B | 5 | ₱186.2M | 39.5 | 0 | 100.0% |
| Region VI | 3 | ₱196.4M | 60.8 | 0 | 100.0% |
| National Capital Region | 2 | ₱67.3M | 48.6 | 0 | 58.3% |
| Region XIII | 1 | ₱926K | 18.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 98 | ₱5.9B | 53.1 | 2 | 98.5% |
| Flood Control and Drainage | 59 | ₱4B | 54.2 | 2 | 93.1% |
| Bridges | 39 | ₱2.4B | 52.5 | 7 | 83.9% |
| Water Provision and Storage | 20 | ₱727M | 47.4 | 0 | 100.0% |
| OTHER | 19 | ₱2.4B | 82.9 | 14 | 79.5% |
| Buildings and Facilities | 17 | ₱761.8M | 50.2 | 2 | 84.5% |
| GAA 2025 SSP | 1 | ₱98.9M | 96.4 | 1 | 11.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IJ0053CSSP: CONSTRUCTION OF BUAO BRIDGE, BARANGAY BUAO, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98.9M | 11% | High risk96 | Flagged0.039 |
| 24IC0174CONCRETING OF BRGY. HUPIT FMR, BRGY. HUPIT, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱11.9M | 0% | High risk89 | Flagged0.068 |
| 22I00090SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITES - CONSTRUCTION OF JUNCTION NATIONAL ROAD BRGY. CAROLINA, CAN-AVID - DOLORES - MASLOG ROAD, (BRGY. MAGSAYSAY - BRGY. MAGONGBONG - BRGY. GAP-A | Region VIII | Region VIII | On-Going | ₱238.6M | 91% | High risk85 | Flagged0.043 |
| 24I00035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+219 - K0945+549, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 40% | High risk85 | Flagged0.039 |
| 24I00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+549 - K0945+879, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 50% | High risk85 | Flagged0.036 |
| 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 24I00140CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 45% | High risk84 | Flagged0.038 |
| 24I00204SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIVERSION COASTAL ROAD AND BRIDGE FROM SABANG SOUTH TO SABANG NORT | Region VIII | Region VIII | On-Going | ₱163.4M | 65% | High risk84 | Flagged0.028 |
| 19I00120ASSET PRESERVATION / REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CATBALOGAN DIVERSION RD. - KO801+(-850) - KO801+510, SAMAR | Region VIII | Region VIII | Completed | ₱236.4M | 100% | High risk84 | Flagged0.009 |
| 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 24IJ0050(RE-ADVERTISED) OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE 5A, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱144.2M | 81% | High risk83 | Flagged0.022 |
| 23I00109ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA - K1206+604 - K1209+000, K1212+046 - K1213+199, SOUTHERN LEYTE DISTRICT-SUB | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk82 | —-0.020 |
| 20GI0017ACCESS ROAD INCLUDING ALTERNATE ROUTE LEADING TO SEVEN CITIES AGRI TOURISM SITE, ALIMODIAN, ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱75.3M | 100% | High risk81 | —-0.019 |
| 23IJ0061(RE-ADVERTISED) CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE B, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.5M | 100% | High risk80 | —-0.029 |
| 18II0063CONSTRUCTION OF MISSING LINKS/NEW ROADS, ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD (NORTHERN SAMAR SIDE), INCL. ROW, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Terminated | ₱14.5M | 100% | High risk79 | Flagged0.011 |
| 18IM0015ROAD WIDENING - RIZAL AVENIDA EXT. ROAD K0905+(-909)-K0905+(-733), K0905+(-733)-K0905+(-705), K0905+(-480)-K0905+(-471),K0905+(-471)-K0905+(-440), TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱8.1M | 100% | High risk77 | —-0.037 |
| 17FK0009CLUSTER II-CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NAT'L. ROADS REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES IN FIRST DISTRICT OF SORSOGON | Region V | Sorsogon DEO | Completed | ₱41.9M | 100% | High risk75 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IC0174CONCRETING OF BRGY. HUPIT FMR, BRGY. HUPIT, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱11.9M | 0% | High risk89 | Flagged0.068 |
| 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 22I00090SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITES - CONSTRUCTION OF JUNCTION NATIONAL ROAD BRGY. CAROLINA, CAN-AVID - DOLORES - MASLOG ROAD, (BRGY. MAGSAYSAY - BRGY. MAGONGBONG - BRGY. GAP-A | Region VIII | Region VIII | On-Going | ₱238.6M | 91% | High risk85 | Flagged0.043 |
| 24I00035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+219 - K0945+549, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 40% | High risk85 | Flagged0.039 |
| 25IJ0053CSSP: CONSTRUCTION OF BUAO BRIDGE, BARANGAY BUAO, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98.9M | 11% | High risk96 | Flagged0.039 |
| 24I00140CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 45% | High risk84 | Flagged0.038 |
| 24I00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+549 - K0945+879, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 50% | High risk85 | Flagged0.036 |
| 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 24I00204SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIVERSION COASTAL ROAD AND BRIDGE FROM SABANG SOUTH TO SABANG NORT | Region VIII | Region VIII | On-Going | ₱163.4M | 65% | High risk84 | Flagged0.028 |
| 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 24IJ0050(RE-ADVERTISED) OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE 5A, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱144.2M | 81% | High risk83 | Flagged0.022 |
| 25I00112BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - PEÑA BR. (B00333SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.), SAMAR 1ST DEO | Region VIII | Region VIII | On-Going | ₱38.6M | 0% | Medium risk51 | Flagged0.016 |
| 18II0063CONSTRUCTION OF MISSING LINKS/NEW ROADS, ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD (NORTHERN SAMAR SIDE), INCL. ROW, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Terminated | ₱14.5M | 100% | High risk79 | Flagged0.011 |
| 19I00120ASSET PRESERVATION / REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CATBALOGAN DIVERSION RD. - KO801+(-850) - KO801+510, SAMAR | Region VIII | Region VIII | Completed | ₱236.4M | 100% | High risk84 | Flagged0.009 |
| 24I00032CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0944+882 - K0945+219, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 0% | High risk69 | Flagged0.009 |
| 17I00046CONSTRUCTION OF WESTERN LEYTE PROVINCIAL HOSPITAL IN BAYBAY, LEYTE, WESTERN LEYTE PROVINCIAL HOSPITAL, BRGY. COGON, BAYBAY CITY, LEYTE | Region VIII | Region VIII | Completed | ₱149M | 100% | Medium risk55 | Flagged0.008 |
| 17IJ0123CONCRETING OF GANDARA-MATUGUINAO ACCESS ROAD(PHASE III) SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱90.9M | 100% | High risk62 | Flagged0.007 |
| 25I00101BRIDGE - WIDENING OF PERMANENT BRIDGES - MAWO PARALLEL BR. (B00599SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.) (PHASE II) | Region VIII | Region VIII | On-Going | ₱159.2M | 35% | High risk67 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24I00134CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BAROBO, LLORENTE, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 91% | High risk69 | —-0.011 |
| 27 | 24I00062CONSTRUCTION OF BARANGAY NATIVIDAD FLOOD CONTROL STRUCTURE, SAN POLICARPO, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk68 | —-0.016 |
| 28 | 22IK0063CONSTRUCTION OF COASTAL DIKE AT PIER I TO BUNU-ANAN (PHASE 2), CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱144.1M | 85% | High risk68 | —-0.000 |
| 29 | 24I00063CONSTRUCTION OF BARANGAY SAN EDUARDO FLOOD CONTROL STRUCTURE, ORAS, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱138.7M | 81% | High risk68 | —-0.014 |
| 30 | 25IM0051REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY 60, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱7.9M | 0% | High risk68 | —-0.004 |
| 31 | 24I00034CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BURAK (ZONE 2 & 3), ORAS, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱138M | 94% | High risk68 | —-0.015 |
| 32 | 24IK0042CONST. OF FLOOD CONTROL ANTIAO BRIDGE IV (CATBALOGAN DIVERSION BRIDGE), SAN ANDRES, CATBALOGAN CITY, SAMAR, BRGY. SAN ANDRES, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱144.7M | 100% | High risk68 | —-0.057 |
| 33 | 24IJ0038OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE 4A | Region VIII | Samar 1st DEO | On-Going | ₱144.5M | 100% | High risk67 | —-0.008 |
| 34 | 24IJ0042OO1: (RE-ADVERTISED) CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱144.7M | 100% | High risk67 | —-0.008 |
| 35 | 25I00101BRIDGE - WIDENING OF PERMANENT BRIDGES - MAWO PARALLEL BR. (B00599SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.) (PHASE II) | Region VIII | Region VIII | On-Going | ₱159.2M | 35% | High risk67 | Flagged0.006 |
| 36 | 25IJ0036OO1: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE A (PHASE II), SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱144.7M | 35% | High risk67 | Flagged0.006 |
| 37 | 24I00066CONSTRUCTION OF BARANGAY MALINGON FLOOD CONTROL STRUCTURE, ORAS, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱136.5M | 96% | High risk67 | —-0.019 |
| 38 | 24I00238SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SAN JUANICO BR) - K0810+134 - K0810+500, K0815+000 - K0815+550, K0817+500 - K | Region VIII | Region VIII | On-Going | ₱332.5M | 78% | High risk66 | —-0.012 |
| 39 | 21I00042BRIDGE-REPLACEMENT OF BRIDGES (TEMPORARY TO PERMANENT)-PAMBUJAN BR. (B00545SM) ALONG SN ROQUE-CABABTOAN OLD RD., PAMBUJAN, CATARMAN, NORTHERN SAMAR | Region VIII | Region VIII | Completed | ₱152.7M | 100% | High risk66 | —-0.028 |
| 40 | 24I00065NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN STA. FE - SAN MIGUEL ROAD, LEYTE | Region VIII | Region VIII | On-Going | ₱192.2M | 91% | High risk65 | —-0.021 |
| 41 | 23IK0017CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SILAGA RIVER ALONG DAANG MAHARLIKA, SILAGA BRIDGE, BRGY. TULAY, STA. RITA, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱111M | 100% | High risk65 | —-0.066 |
| 42 | 23IK0021CONSTRUCTION OF FLOOD CONTROL STRUCTURE, GOLDEN BRIDGE SAN JUANICO BASEY SOHOTON ROAD, BASEY SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱111M | 100% | High risk65 | —-0.066 |
| 43 | 24I00097ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) K0695+000 - K0696+178, K0697+217 - K0697+533, K0724+748 - K0726+929, SAMAR 1ST | Region VIII | Region VIII | On-Going | ₱214.4M | 100% | High risk64 | —-0.024 |
| 44 | 23II0032PREVENTIVE MAINTENANCE, SECONDARY ROADS, PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG RD., K0822+872-K0826+250; K0827+501-K0828+550; K0839+964-K0844+000, 2ND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.073 |
| 45 | 18IJ0043WIDENING OF PERMANENT BRIDGES: MALAGA BR. (B00031SM), INCL. ROW ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) | Region VIII | Samar 1st DEO | Completed | ₱118.6M | 100% | High risk64 | —-0.040 |
| 46 | 18IG0096CONSTRUCTION OF BAYBAY CITY SPORTS COMPLEX, BAYBAY CITY, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.074 |
| 47 | 18IJ0121CONSTRUCTION OF REVETMENT, BARANGAY BURABOD, STA. MARGARITA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱95.8M | 100% | High risk63 | —-0.070 |
| 48 | 22IJ0066OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROAD,CALBAYOG CITY COASTAL ROAD,PACKAGE 3A,SAMAR | Region VIII | Samar 1st DEO | Completed | ₱96.2M | 100% | High risk63 | —-0.045 |
| 49 | 18II0055REPLACEMENT OF BRIDGES, (TEMPORARY TO PERMANENT), TALISAY BRIDGE (B00572SBM) ALONG RAWIS - TALISAY ROAD, LAOANG, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱117.1M | 100% | High risk63 | —-0.043 |
| 50 | 20I00060BRIDGE - REPLACEMENT OF BRIDGES (TEMPORARY TO PERMANENT) - SAN ROQUE BRIDGE (B000317SM) ALONG SN ROQUE - CABABTOAN OLD RD., SAN ROQUE, NORTHERN SAMAR | Region VIII | Region VIII | Completed | ₱122.8M | 100% | High risk63 | —-0.040 |