Contractor dossier
253 projects on file, including joint ventures this contractor is part of.
Total projects
253
Total budget
₱16.3B
Average progress
92.4%
Completion rate
78.7%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
28
11.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 218 | ₱15B | 56.0 | 27 | 91.6% |
| Region V | 15 | ₱521.7M | 54.0 | 1 | 100.0% |
| Region VII | 9 | ₱313.8M | 46.9 | 0 | 100.0% |
| Region IV-B | 5 | ₱186.2M | 39.5 | 0 | 100.0% |
| Region VI | 3 | ₱196.4M | 60.8 | 0 | 100.0% |
| National Capital Region | 2 | ₱67.3M | 48.6 | 0 | 58.3% |
| Region XIII | 1 | ₱926K | 18.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 98 | ₱5.9B | 53.1 | 2 | 98.5% |
| Flood Control and Drainage | 59 | ₱4B | 54.2 | 2 | 93.1% |
| Bridges | 39 | ₱2.4B | 52.5 | 7 | 83.9% |
| Water Provision and Storage | 20 | ₱727M | 47.4 | 0 | 100.0% |
| OTHER | 19 | ₱2.4B | 82.9 | 14 | 79.5% |
| Buildings and Facilities | 17 | ₱761.8M | 50.2 | 2 | 84.5% |
| GAA 2025 SSP | 1 | ₱98.9M | 96.4 | 1 | 11.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IJ0053CSSP: CONSTRUCTION OF BUAO BRIDGE, BARANGAY BUAO, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98.9M | 11% | High risk96 | Flagged0.039 |
| 24IC0174CONCRETING OF BRGY. HUPIT FMR, BRGY. HUPIT, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱11.9M | 0% | High risk89 | Flagged0.068 |
| 22I00090SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITES - CONSTRUCTION OF JUNCTION NATIONAL ROAD BRGY. CAROLINA, CAN-AVID - DOLORES - MASLOG ROAD, (BRGY. MAGSAYSAY - BRGY. MAGONGBONG - BRGY. GAP-A | Region VIII | Region VIII | On-Going | ₱238.6M | 91% | High risk85 | Flagged0.043 |
| 24I00035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+219 - K0945+549, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 40% | High risk85 | Flagged0.039 |
| 24I00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+549 - K0945+879, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 50% | High risk85 | Flagged0.036 |
| 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 24I00140CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 45% | High risk84 | Flagged0.038 |
| 24I00204SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIVERSION COASTAL ROAD AND BRIDGE FROM SABANG SOUTH TO SABANG NORT | Region VIII | Region VIII | On-Going | ₱163.4M | 65% | High risk84 | Flagged0.028 |
| 19I00120ASSET PRESERVATION / REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CATBALOGAN DIVERSION RD. - KO801+(-850) - KO801+510, SAMAR | Region VIII | Region VIII | Completed | ₱236.4M | 100% | High risk84 | Flagged0.009 |
| 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 24IJ0050(RE-ADVERTISED) OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE 5A, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱144.2M | 81% | High risk83 | Flagged0.022 |
| 23I00109ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA - K1206+604 - K1209+000, K1212+046 - K1213+199, SOUTHERN LEYTE DISTRICT-SUB | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk82 | —-0.020 |
| 20GI0017ACCESS ROAD INCLUDING ALTERNATE ROUTE LEADING TO SEVEN CITIES AGRI TOURISM SITE, ALIMODIAN, ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱75.3M | 100% | High risk81 | —-0.019 |
| 23IJ0061(RE-ADVERTISED) CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE B, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.5M | 100% | High risk80 | —-0.029 |
| 18II0063CONSTRUCTION OF MISSING LINKS/NEW ROADS, ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD (NORTHERN SAMAR SIDE), INCL. ROW, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Terminated | ₱14.5M | 100% | High risk79 | Flagged0.011 |
| 18IM0015ROAD WIDENING - RIZAL AVENIDA EXT. ROAD K0905+(-909)-K0905+(-733), K0905+(-733)-K0905+(-705), K0905+(-480)-K0905+(-471),K0905+(-471)-K0905+(-440), TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱8.1M | 100% | High risk77 | —-0.037 |
| 17FK0009CLUSTER II-CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NAT'L. ROADS REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES IN FIRST DISTRICT OF SORSOGON | Region V | Sorsogon DEO | Completed | ₱41.9M | 100% | High risk75 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IC0174CONCRETING OF BRGY. HUPIT FMR, BRGY. HUPIT, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱11.9M | 0% | High risk89 | Flagged0.068 |
| 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 22I00090SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITES - CONSTRUCTION OF JUNCTION NATIONAL ROAD BRGY. CAROLINA, CAN-AVID - DOLORES - MASLOG ROAD, (BRGY. MAGSAYSAY - BRGY. MAGONGBONG - BRGY. GAP-A | Region VIII | Region VIII | On-Going | ₱238.6M | 91% | High risk85 | Flagged0.043 |
| 24I00035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+219 - K0945+549, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 40% | High risk85 | Flagged0.039 |
| 25IJ0053CSSP: CONSTRUCTION OF BUAO BRIDGE, BARANGAY BUAO, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98.9M | 11% | High risk96 | Flagged0.039 |
| 24I00140CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 45% | High risk84 | Flagged0.038 |
| 24I00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+549 - K0945+879, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 50% | High risk85 | Flagged0.036 |
| 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 24I00204SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIVERSION COASTAL ROAD AND BRIDGE FROM SABANG SOUTH TO SABANG NORT | Region VIII | Region VIII | On-Going | ₱163.4M | 65% | High risk84 | Flagged0.028 |
| 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 24IJ0050(RE-ADVERTISED) OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE 5A, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱144.2M | 81% | High risk83 | Flagged0.022 |
| 25I00112BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - PEÑA BR. (B00333SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.), SAMAR 1ST DEO | Region VIII | Region VIII | On-Going | ₱38.6M | 0% | Medium risk51 | Flagged0.016 |
| 18II0063CONSTRUCTION OF MISSING LINKS/NEW ROADS, ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD (NORTHERN SAMAR SIDE), INCL. ROW, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Terminated | ₱14.5M | 100% | High risk79 | Flagged0.011 |
| 19I00120ASSET PRESERVATION / REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CATBALOGAN DIVERSION RD. - KO801+(-850) - KO801+510, SAMAR | Region VIII | Region VIII | Completed | ₱236.4M | 100% | High risk84 | Flagged0.009 |
| 24I00032CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0944+882 - K0945+219, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 0% | High risk69 | Flagged0.009 |
| 17I00046CONSTRUCTION OF WESTERN LEYTE PROVINCIAL HOSPITAL IN BAYBAY, LEYTE, WESTERN LEYTE PROVINCIAL HOSPITAL, BRGY. COGON, BAYBAY CITY, LEYTE | Region VIII | Region VIII | Completed | ₱149M | 100% | Medium risk55 | Flagged0.008 |
| 17IJ0123CONCRETING OF GANDARA-MATUGUINAO ACCESS ROAD(PHASE III) SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱90.9M | 100% | High risk62 | Flagged0.007 |
| 25I00101BRIDGE - WIDENING OF PERMANENT BRIDGES - MAWO PARALLEL BR. (B00599SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.) (PHASE II) | Region VIII | Region VIII | On-Going | ₱159.2M | 35% | High risk67 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20IJ0030CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CAPOOCAN - DAGUM DIVERSION ROAD, CALBAYOG CITY,SAMAR | Region VIII | Samar 1st DEO | Completed | ₱57M | 100% | Medium risk55 | —-0.090 |
| 102 | 19IJ0154(RE-ADVERTISE) 001:PREVENTIVE MAINTENANCE - PRIMARY ROADS DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) - K0704+000 - K0705+000, K0713+590 - K0714+000), SAMAR | Region VIII | Samar 1st DEO | Completed | ₱72.9M | 100% | Medium risk55 | —-0.089 |
| 103 | 18IJ0053REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG CALBAYOG - CATARMAN ROAD, K0787+672 - K0787+740, K0791+174 - K0791+220, K0792+526- K0792+560, K0792+585 - K0792+647, K0792+667 - K0792+731, K0793+491 - K0793+629, K0794 | Region VIII | Samar 1st DEO | Completed | ₱87.9M | 100% | Medium risk55 | —-0.085 |
| 104 | 17FL0037CONC. OF LOCAL ROADS - CLUSTER 5, GOGON-SAN RAFAEL RD., PTO. DIAZ, SOR., BIGUIN-JAMORAWON-SAN FRANCI | Region V | Sorsogon 2nd DEO | Completed | ₱16.5M | 100% | Medium risk55 | —-0.064 |
| 105 | 18IG0066WIDENING OF PERMANENT BRIDGES, BANGKEROHAN BR. (B00283LT) ALONG ORMOC-BAYBAY-SOUTHERN LEYTE BOUNDARY ROAD, HILONGOS, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱58.2M | 100% | Medium risk55 | —-0.058 |
| 106 | 17I00046CONSTRUCTION OF WESTERN LEYTE PROVINCIAL HOSPITAL IN BAYBAY, LEYTE, WESTERN LEYTE PROVINCIAL HOSPITAL, BRGY. COGON, BAYBAY CITY, LEYTE | Region VIII | Region VIII | Completed | ₱149M | 100% | Medium risk55 | Flagged0.008 |
| 107 | 20I00033ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JARO - DAGAMI - BURAUEN - LA PAZ RD., K0977+000 - K0987+050, K0979+200 - K0980+100, K0981+000 - K0982+000, K0986+000 - K0986+866, LEYTE 2ND LD | Region VIII | Region VIII | Completed | ₱67.3M | 100% | Medium risk54 | —-0.091 |
| 108 | 23IJ0024OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDLSIDE -PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) K0778+360 - K0778+441 | Region VIII | Samar 1st DEO | On-Going | ₱54M | 100% | Medium risk54 | —-0.045 |
| 109 | 25IM0046CONSTRUCTION OF MULTI-PURPOSE BUILDING, OFFICE AND BARRACKS OF AVIATION SECURITY GROUP, KUTA KANKABATO, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱24.7M | 30% | Medium risk54 | —-0.036 |
| 110 | 17FK0013CLUSTER I-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST./REHAB. OF CENTRAL RIVER CONTROL AND CONST. OF CAWIT RIVER CONTROL, CASIGURAN | Region V | Sorsogon DEO | Completed | ₱47.1M | 100% | Medium risk54 | —-0.055 |
| 111 | 23IC0174CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. CANMOGSAY, TOLOSA, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱48.2M | 100% | Medium risk54 | —-0.023 |
| 112 | 19II0004ASSET PRESERVATION, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, CATARMAN-LAOANG RD.-K0774+1109-K0775+000, K0781+000-K0781+832, K0785+148, K0786+000, K0786+575-K0788+156, 2ND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱63.7M | 100% | Medium risk54 | —-0.091 |
| 113 | 22IK0057PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR), K0880+726 - 881+000; K0882+000 - K0882+200; K0886+210 - K0886+713; K0889+000 - K0889+480; K0883+133 - K0995+000, STA. RITA, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱48.7M | 100% | Medium risk54 | —-0.095 |
| 114 | 20IJ0058LOCAL PROGRAM: CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, STA. MARGARITA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱54.8M | 100% | Medium risk54 | —-0.042 |
| 115 | 17FK0029CLUSTER I-CONSTRUCTION OF MULTI-PURPOSE BLDG. EVACUATION CENTER, ESCUALA, CASIGURAN AND CONSTRUCTION OF MULTI-PURPOSE BLDG. (EDUCATIONAL AND LIVELIHOOD CENTER), INLAGADIAN, CASIGURAN | Region V | Sorsogon DEO | Completed | ₱19.2M | 100% | Medium risk54 | —-0.059 |
| 116 | 18IM0035CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG TIGBAO STA. FE-SAN MIGUEL ROAD (S00033LT), TACLOBAN CITY K0904+194-K0904+360, K0905+(-215)-K0905+(-131), K0905+400-K0905+586, K0905+561-K0905+586, K0908+(-549)-K0908+(-476), K0908+(-421)-K0908+(-275).. | Region VIII | Tacloban City DEO | Completed | ₱48M | 100% | Medium risk54 | —-0.095 |
| 117 | 25IK0012CCSP-SIPAG- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ACCESS ROAD LEADING TO BARANGAY PANGDAN, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱49M | 22% | Medium risk54 | —-0.035 |
| 118 | 23IC0176CONSTRUCTION OF SHORELINE PROTECTION, BRGY. STA. CRUZ, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱48.2M | 100% | Medium risk53 | —-0.025 |
| 119 | 23IC0175CONSTRUCTION OF SHORELINE PROTECTION, BRGY. BAGACAY, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱48.2M | 100% | Medium risk53 | —-0.025 |
| 120 | 21IA0132REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - BILIRAN BRIDGE (B00057BR) ALONG LEYTE-BILIRAN RD. BILIRAN PROVINCE | Region VIII | Biliran DEO | Completed | ₱47.3M | 100% | Medium risk53 | —-0.061 |
| 121 | 18IM0030CONSTRUCTION OF KNIGHTRIDGE BRIDGE BRGY. CAMANSIHAY, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱49.4M | 100% | Medium risk53 | —-0.053 |
| 122 | 22IJ0014CONSTRUCTION OF LEVEL III WATER SYSTEM, BRGY. CABUNGAAN AND BRGY. ILIJAN, STO. NIÑO, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.9M | 100% | Medium risk53 | —-0.063 |
| 123 | 17FL0013CONST. OF FLOOD CONTROL ALONG CADAC-AN RIVER, (DOWNSTREAM) STA. 0+436-STA. 0+722 BOTH SIDES BRGY. BI | Region V | Sorsogon 2nd DEO | Completed | ₱44.1M | 100% | Medium risk53 | —-0.039 |
| 124 | 17FL0011CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CADAC-AN RIVER (DOWNSTREAM) STA. 0+722 - STA. 1+010 BO | Region V | Sorsogon 2nd DEO | Completed | ₱44.1M | 100% | Medium risk53 | —-0.039 |
| 125 | 22IA0080REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES-BILIRAN BR.(B00057BR) ALONG LEYTE-BILIRAN RD. K1005+500 (124.48014, 11.45709 TO 124.47887, 11.45506) | Region VIII | Biliran DEO | Completed | ₱49M | 100% | Medium risk53 | —-0.062 |