Contractor dossier
253 projects on file, including joint ventures this contractor is part of.
Total projects
253
Total budget
₱16.3B
Average progress
92.4%
Completion rate
78.7%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
28
11.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 218 | ₱15B | 56.0 | 27 | 91.6% |
| Region V | 15 | ₱521.7M | 54.0 | 1 | 100.0% |
| Region VII | 9 | ₱313.8M | 46.9 | 0 | 100.0% |
| Region IV-B | 5 | ₱186.2M | 39.5 | 0 | 100.0% |
| Region VI | 3 | ₱196.4M | 60.8 | 0 | 100.0% |
| National Capital Region | 2 | ₱67.3M | 48.6 | 0 | 58.3% |
| Region XIII | 1 | ₱926K | 18.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 98 | ₱5.9B | 53.1 | 2 | 98.5% |
| Flood Control and Drainage | 59 | ₱4B | 54.2 | 2 | 93.1% |
| Bridges | 39 | ₱2.4B | 52.5 | 7 | 83.9% |
| Water Provision and Storage | 20 | ₱727M | 47.4 | 0 | 100.0% |
| OTHER | 19 | ₱2.4B | 82.9 | 14 | 79.5% |
| Buildings and Facilities | 17 | ₱761.8M | 50.2 | 2 | 84.5% |
| GAA 2025 SSP | 1 | ₱98.9M | 96.4 | 1 | 11.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IJ0053CSSP: CONSTRUCTION OF BUAO BRIDGE, BARANGAY BUAO, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98.9M | 11% | High risk96 | Flagged0.039 |
| 24IC0174CONCRETING OF BRGY. HUPIT FMR, BRGY. HUPIT, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱11.9M | 0% | High risk89 | Flagged0.068 |
| 22I00090SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITES - CONSTRUCTION OF JUNCTION NATIONAL ROAD BRGY. CAROLINA, CAN-AVID - DOLORES - MASLOG ROAD, (BRGY. MAGSAYSAY - BRGY. MAGONGBONG - BRGY. GAP-A | Region VIII | Region VIII | On-Going | ₱238.6M | 91% | High risk85 | Flagged0.043 |
| 24I00035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+219 - K0945+549, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 40% | High risk85 | Flagged0.039 |
| 24I00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+549 - K0945+879, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 50% | High risk85 | Flagged0.036 |
| 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 24I00140CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 45% | High risk84 | Flagged0.038 |
| 24I00204SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIVERSION COASTAL ROAD AND BRIDGE FROM SABANG SOUTH TO SABANG NORT | Region VIII | Region VIII | On-Going | ₱163.4M | 65% | High risk84 | Flagged0.028 |
| 19I00120ASSET PRESERVATION / REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CATBALOGAN DIVERSION RD. - KO801+(-850) - KO801+510, SAMAR | Region VIII | Region VIII | Completed | ₱236.4M | 100% | High risk84 | Flagged0.009 |
| 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 24IJ0050(RE-ADVERTISED) OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE 5A, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱144.2M | 81% | High risk83 | Flagged0.022 |
| 23I00109ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA - K1206+604 - K1209+000, K1212+046 - K1213+199, SOUTHERN LEYTE DISTRICT-SUB | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk82 | —-0.020 |
| 20GI0017ACCESS ROAD INCLUDING ALTERNATE ROUTE LEADING TO SEVEN CITIES AGRI TOURISM SITE, ALIMODIAN, ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱75.3M | 100% | High risk81 | —-0.019 |
| 23IJ0061(RE-ADVERTISED) CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE B, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.5M | 100% | High risk80 | —-0.029 |
| 18II0063CONSTRUCTION OF MISSING LINKS/NEW ROADS, ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD (NORTHERN SAMAR SIDE), INCL. ROW, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Terminated | ₱14.5M | 100% | High risk79 | Flagged0.011 |
| 18IM0015ROAD WIDENING - RIZAL AVENIDA EXT. ROAD K0905+(-909)-K0905+(-733), K0905+(-733)-K0905+(-705), K0905+(-480)-K0905+(-471),K0905+(-471)-K0905+(-440), TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱8.1M | 100% | High risk77 | —-0.037 |
| 17FK0009CLUSTER II-CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NAT'L. ROADS REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES IN FIRST DISTRICT OF SORSOGON | Region V | Sorsogon DEO | Completed | ₱41.9M | 100% | High risk75 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IC0174CONCRETING OF BRGY. HUPIT FMR, BRGY. HUPIT, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱11.9M | 0% | High risk89 | Flagged0.068 |
| 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 22I00090SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITES - CONSTRUCTION OF JUNCTION NATIONAL ROAD BRGY. CAROLINA, CAN-AVID - DOLORES - MASLOG ROAD, (BRGY. MAGSAYSAY - BRGY. MAGONGBONG - BRGY. GAP-A | Region VIII | Region VIII | On-Going | ₱238.6M | 91% | High risk85 | Flagged0.043 |
| 24I00035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+219 - K0945+549, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 40% | High risk85 | Flagged0.039 |
| 25IJ0053CSSP: CONSTRUCTION OF BUAO BRIDGE, BARANGAY BUAO, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98.9M | 11% | High risk96 | Flagged0.039 |
| 24I00140CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 45% | High risk84 | Flagged0.038 |
| 24I00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+549 - K0945+879, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 50% | High risk85 | Flagged0.036 |
| 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 24I00204SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIVERSION COASTAL ROAD AND BRIDGE FROM SABANG SOUTH TO SABANG NORT | Region VIII | Region VIII | On-Going | ₱163.4M | 65% | High risk84 | Flagged0.028 |
| 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 24IJ0050(RE-ADVERTISED) OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE 5A, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱144.2M | 81% | High risk83 | Flagged0.022 |
| 25I00112BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - PEÑA BR. (B00333SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.), SAMAR 1ST DEO | Region VIII | Region VIII | On-Going | ₱38.6M | 0% | Medium risk51 | Flagged0.016 |
| 18II0063CONSTRUCTION OF MISSING LINKS/NEW ROADS, ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD (NORTHERN SAMAR SIDE), INCL. ROW, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Terminated | ₱14.5M | 100% | High risk79 | Flagged0.011 |
| 19I00120ASSET PRESERVATION / REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CATBALOGAN DIVERSION RD. - KO801+(-850) - KO801+510, SAMAR | Region VIII | Region VIII | Completed | ₱236.4M | 100% | High risk84 | Flagged0.009 |
| 24I00032CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0944+882 - K0945+219, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 0% | High risk69 | Flagged0.009 |
| 17I00046CONSTRUCTION OF WESTERN LEYTE PROVINCIAL HOSPITAL IN BAYBAY, LEYTE, WESTERN LEYTE PROVINCIAL HOSPITAL, BRGY. COGON, BAYBAY CITY, LEYTE | Region VIII | Region VIII | Completed | ₱149M | 100% | Medium risk55 | Flagged0.008 |
| 17IJ0123CONCRETING OF GANDARA-MATUGUINAO ACCESS ROAD(PHASE III) SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱90.9M | 100% | High risk62 | Flagged0.007 |
| 25I00101BRIDGE - WIDENING OF PERMANENT BRIDGES - MAWO PARALLEL BR. (B00599SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.) (PHASE II) | Region VIII | Region VIII | On-Going | ₱159.2M | 35% | High risk67 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 19IJ0063002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG GANDARA RIVER, BRGY. ADELA HEIGHTS, GANDARA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱61.1M | 100% | Medium risk53 | —-0.079 |
| 127 | 19IJ0064002: PROTECT LIVES AND PROPERTIES AGAINT MAJOR FLOODS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG GANDARA RIVER, BRGY. CASAB-AHAN, GANDARA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱61.3M | 100% | Medium risk53 | —-0.079 |
| 128 | 18GA0192CONST. OF FLOOD CONTROL STRUCTURE ALONG AKLAN RIVER BRGY. MAGUGBA, LIBACAO, AKLAN | Region VI | Aklan DEO | Completed | ₱72.2M | 100% | Medium risk53 | —-0.066 |
| 129 | 18IJ0105CONSTRUCTION OF BARANGAY STO. NIÑO - BARANGAY MACUGO ROAD, GANDARA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.4M | 100% | Medium risk52 | —-0.095 |
| 130 | 18IJ0145CONSTRUCTION OF BARANGAY TABAWAN - BARANGAY VICTORY ROAD, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.5M | 100% | Medium risk52 | —-0.090 |
| 131 | 21IE0027PREVENTIVE MAINTENANCE CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON RD., K1056+150-K1058+355, VILLABA, LEYTEVILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱48.2M | 100% | Medium risk52 | —-0.096 |
| 132 | 17FK0011CONST../MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST./REHAB. OF TULAY PROTECTION WALL, CASIGURAN, SORSOGON | Region V | Sorsogon DEO | Completed | ₱28.3M | 100% | Medium risk52 | —-0.054 |
| 133 | 19I00113CONSTRUCTION OF MACAHILA FLOOD CONTROL STRUCTURES AND DRAINAGE SYSTEM, MACAHILA RIVER BASIN, STA. 0+350 - STA. 0+680 (RIGHT SIDE RIVER BANK), BAYBAY CITY, LEYTE | Region VIII | Region VIII | Completed | ₱74.3M | 100% | Medium risk52 | —-0.077 |
| 134 | 18IJ0122CONSTRUCTION OF BARANGAY MAGUINO-O -MASIPARA, CALBAYOG CITY SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.6M | 100% | Medium risk52 | —-0.087 |
| 135 | 19IJ0113001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET. PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE PROTECTION AND LANDSLIDE-PRIMARY ROADS DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR.) - KO703+500 - KO703+612, CALB. | Region VIII | Samar 1st DEO | Completed | ₱48.6M | 100% | Medium risk52 | —-0.094 |
| 136 | 19I00126CONSTRUCTION OF EVACUATION CENTER, BRGY. 12, POBLACION, SALCEDO, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱34.5M | 100% | Medium risk52 | —-0.083 |
| 137 | 22IC0025CONST. OF LEVEL III WATER SUPPLY SYSTEM, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱47M | 100% | Medium risk52 | —-0.060 |
| 138 | 23IM0049CONSTRUCTION OF SHORE PROTECTION, OLD ROAD SAGKAHAN (ASTRODOME AREA), TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱55.5M | 1% | Medium risk52 | Flagged0.005 |
| 139 | 22IC0026CONST. OF LEVEL III WATER SUPPLY SYSTEM, TOLOSA, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.060 |
| 140 | 17FL0005CONST. OF FLOOD CONTROL STRUCTURE ALONG CADAC-AN RIVER, TABON-TABON, IROSIN, SOR. IROSIN, SORSOGON | Region V | Sorsogon 2nd DEO | Completed | ₱42.4M | 100% | Medium risk52 | —-0.054 |
| 141 | 22IG0065CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, ABUYOG, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱48.3M | 100% | Medium risk52 | —-0.060 |
| 142 | 25I00112BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - PEÑA BR. (B00333SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.), SAMAR 1ST DEO | Region VIII | Region VIII | On-Going | ₱38.6M | 0% | Medium risk51 | Flagged0.016 |
| 143 | 17FL0006CONST. OF FLOOD DRAINAGE STRUCTURE AT GUBAT POBLACION, BRGYS. PARADIJON, LUNA-CANDOL AND MANOOK, GUB | Region V | Sorsogon 2nd DEO | Completed | ₱43.1M | 100% | Medium risk51 | —-0.055 |
| 144 | 19IJ0081(RE-ADVERTISE) 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE WIDENING OF PERMANENT BRIDGES: BUGTONG BR. (B00330SM) ALONG DAANG MAHARLIKA (SM)(SN ISIDRO - SN JAUNICO BR.) SAMAR | Region VIII | Samar 1st DEO | Completed | ₱46.7M | 100% | Medium risk51 | —-0.061 |
| 145 | 18IK0099CONSTRUCTION OF MODIFIED DESIGN WITH PARAPET, 1-UNIT, 2-STOREY, TWELVE (12) CLASSROOM SCHOOL BUILDING, MOTIONG NHS, MOTIONG, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱33.7M | 100% | Medium risk51 | —-0.047 |
| 146 | 24IK0007ASSET PRESERVATION PROGRAM- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS- SECONDARY ROADS, BASEY-MARANUT-PINAMITINAN RD- K0909+(-748)-K0909+000, K0909+(-779)-K0909+(-748), K0909+(-784.2)-K0909+(-779), K0918+000-K0918+400, K0920+1195-K0920+1360 | Region VIII | Samar 2nd DEO | On-Going | ₱44.1M | 100% | Medium risk50 | —-0.050 |
| 147 | 22IK0002NETWORK DEVELOPMENT: ROAD WIDENING - TERTIARY ROADS, HINABANGAN DIVERSION ROAD K0837+284 - K0837+958, HINABANGAN CITY | Region VIII | Samar 2nd DEO | Completed | ₱29.4M | 100% | Medium risk50 | —-0.093 |
| 148 | 21IJ0067CONSTRUCTION OF LEVEL III WATER SUPPLY PROJECT, TARANGNAN, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱42.1M | 100% | Medium risk50 | —-0.061 |
| 149 | 23IM0117CONSTRUCTION OF SHORE PROTECTION, MAGSAYSAY BOULEVARD PHASE 2, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱48.9M | 100% | Medium risk50 | —-0.081 |
| 150 | 25IK0031CONSTRUCTION OF LAGUNDI BRIDGE, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱41.1M | 56% | Medium risk50 | —-0.016 |