Contractor dossier
253 projects on file, including joint ventures this contractor is part of.
Total projects
253
Total budget
₱16.3B
Average progress
92.4%
Completion rate
78.7%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
28
11.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 218 | ₱15B | 56.0 | 27 | 91.6% |
| Region V | 15 | ₱521.7M | 54.0 | 1 | 100.0% |
| Region VII | 9 | ₱313.8M | 46.9 | 0 | 100.0% |
| Region IV-B | 5 | ₱186.2M | 39.5 | 0 | 100.0% |
| Region VI | 3 | ₱196.4M | 60.8 | 0 | 100.0% |
| National Capital Region | 2 | ₱67.3M | 48.6 | 0 | 58.3% |
| Region XIII | 1 | ₱926K | 18.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 98 | ₱5.9B | 53.1 | 2 | 98.5% |
| Flood Control and Drainage | 59 | ₱4B | 54.2 | 2 | 93.1% |
| Bridges | 39 | ₱2.4B | 52.5 | 7 | 83.9% |
| Water Provision and Storage | 20 | ₱727M | 47.4 | 0 | 100.0% |
| OTHER | 19 | ₱2.4B | 82.9 | 14 | 79.5% |
| Buildings and Facilities | 17 | ₱761.8M | 50.2 | 2 | 84.5% |
| GAA 2025 SSP | 1 | ₱98.9M | 96.4 | 1 | 11.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IJ0053CSSP: CONSTRUCTION OF BUAO BRIDGE, BARANGAY BUAO, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98.9M | 11% | High risk96 | Flagged0.039 |
| 24IC0174CONCRETING OF BRGY. HUPIT FMR, BRGY. HUPIT, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱11.9M | 0% | High risk89 | Flagged0.068 |
| 22I00090SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITES - CONSTRUCTION OF JUNCTION NATIONAL ROAD BRGY. CAROLINA, CAN-AVID - DOLORES - MASLOG ROAD, (BRGY. MAGSAYSAY - BRGY. MAGONGBONG - BRGY. GAP-A | Region VIII | Region VIII | On-Going | ₱238.6M | 91% | High risk85 | Flagged0.043 |
| 24I00035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+219 - K0945+549, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 40% | High risk85 | Flagged0.039 |
| 24I00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+549 - K0945+879, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 50% | High risk85 | Flagged0.036 |
| 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 24I00140CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 45% | High risk84 | Flagged0.038 |
| 24I00204SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIVERSION COASTAL ROAD AND BRIDGE FROM SABANG SOUTH TO SABANG NORT | Region VIII | Region VIII | On-Going | ₱163.4M | 65% | High risk84 | Flagged0.028 |
| 19I00120ASSET PRESERVATION / REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CATBALOGAN DIVERSION RD. - KO801+(-850) - KO801+510, SAMAR | Region VIII | Region VIII | Completed | ₱236.4M | 100% | High risk84 | Flagged0.009 |
| 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 24IJ0050(RE-ADVERTISED) OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE 5A, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱144.2M | 81% | High risk83 | Flagged0.022 |
| 23I00109ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA - K1206+604 - K1209+000, K1212+046 - K1213+199, SOUTHERN LEYTE DISTRICT-SUB | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk82 | —-0.020 |
| 20GI0017ACCESS ROAD INCLUDING ALTERNATE ROUTE LEADING TO SEVEN CITIES AGRI TOURISM SITE, ALIMODIAN, ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱75.3M | 100% | High risk81 | —-0.019 |
| 23IJ0061(RE-ADVERTISED) CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE B, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.5M | 100% | High risk80 | —-0.029 |
| 18II0063CONSTRUCTION OF MISSING LINKS/NEW ROADS, ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD (NORTHERN SAMAR SIDE), INCL. ROW, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Terminated | ₱14.5M | 100% | High risk79 | Flagged0.011 |
| 18IM0015ROAD WIDENING - RIZAL AVENIDA EXT. ROAD K0905+(-909)-K0905+(-733), K0905+(-733)-K0905+(-705), K0905+(-480)-K0905+(-471),K0905+(-471)-K0905+(-440), TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱8.1M | 100% | High risk77 | —-0.037 |
| 17FK0009CLUSTER II-CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NAT'L. ROADS REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES IN FIRST DISTRICT OF SORSOGON | Region V | Sorsogon DEO | Completed | ₱41.9M | 100% | High risk75 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IC0174CONCRETING OF BRGY. HUPIT FMR, BRGY. HUPIT, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱11.9M | 0% | High risk89 | Flagged0.068 |
| 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 22I00090SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITES - CONSTRUCTION OF JUNCTION NATIONAL ROAD BRGY. CAROLINA, CAN-AVID - DOLORES - MASLOG ROAD, (BRGY. MAGSAYSAY - BRGY. MAGONGBONG - BRGY. GAP-A | Region VIII | Region VIII | On-Going | ₱238.6M | 91% | High risk85 | Flagged0.043 |
| 24I00035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+219 - K0945+549, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 40% | High risk85 | Flagged0.039 |
| 25IJ0053CSSP: CONSTRUCTION OF BUAO BRIDGE, BARANGAY BUAO, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98.9M | 11% | High risk96 | Flagged0.039 |
| 24I00140CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 45% | High risk84 | Flagged0.038 |
| 24I00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+549 - K0945+879, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 50% | High risk85 | Flagged0.036 |
| 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 24I00204SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIVERSION COASTAL ROAD AND BRIDGE FROM SABANG SOUTH TO SABANG NORT | Region VIII | Region VIII | On-Going | ₱163.4M | 65% | High risk84 | Flagged0.028 |
| 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 24IJ0050(RE-ADVERTISED) OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE 5A, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱144.2M | 81% | High risk83 | Flagged0.022 |
| 25I00112BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - PEÑA BR. (B00333SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.), SAMAR 1ST DEO | Region VIII | Region VIII | On-Going | ₱38.6M | 0% | Medium risk51 | Flagged0.016 |
| 18II0063CONSTRUCTION OF MISSING LINKS/NEW ROADS, ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD (NORTHERN SAMAR SIDE), INCL. ROW, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Terminated | ₱14.5M | 100% | High risk79 | Flagged0.011 |
| 19I00120ASSET PRESERVATION / REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CATBALOGAN DIVERSION RD. - KO801+(-850) - KO801+510, SAMAR | Region VIII | Region VIII | Completed | ₱236.4M | 100% | High risk84 | Flagged0.009 |
| 24I00032CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0944+882 - K0945+219, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 0% | High risk69 | Flagged0.009 |
| 17I00046CONSTRUCTION OF WESTERN LEYTE PROVINCIAL HOSPITAL IN BAYBAY, LEYTE, WESTERN LEYTE PROVINCIAL HOSPITAL, BRGY. COGON, BAYBAY CITY, LEYTE | Region VIII | Region VIII | Completed | ₱149M | 100% | Medium risk55 | Flagged0.008 |
| 17IJ0123CONCRETING OF GANDARA-MATUGUINAO ACCESS ROAD(PHASE III) SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱90.9M | 100% | High risk62 | Flagged0.007 |
| 25I00101BRIDGE - WIDENING OF PERMANENT BRIDGES - MAWO PARALLEL BR. (B00599SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.) (PHASE II) | Region VIII | Region VIII | On-Going | ₱159.2M | 35% | High risk67 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 19IK0040WIDENING OF PERMANENT BRIDGES, HINABANGAN BRIDGE (B00416SM) ALONG HINABANGAN DIVERSION ROAD, HINABANGAN, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱37.2M | 100% | Medium risk50 | —-0.059 |
| 152 | 25IK0028CONSTRUCTION OF PANGDAN BRIDGE, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱34.3M | 30% | Medium risk50 | —-0.010 |
| 153 | 23IM0040CONSTRUCTION OF SHORE PROTECTION, OLD ROAD SAGKAHAN (ASTRODOME AREA), PHASE 2, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱48.6M | 100% | Medium risk50 | —-0.079 |
| 154 | 18IJ0080WIDENING OF PERMANENT BRIDGES: CAGMANIPIS BR. (B00332SM) ALONG DAANG MAHARLIKA (SM)(SN ISIDRO - SN JUANICO BR.) INCL. ROW | Region VIII | Samar 1st DEO | Completed | ₱29.7M | 100% | Medium risk50 | —-0.060 |
| 155 | 24IC0189CONSTRUCTION OF 1 UNIT 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN JUAN S. TISMO NATIONAL HIGH SCHOOL, BABATNGON, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱15.4M | 100% | Medium risk50 | —-0.017 |
| 156 | 23IC0036CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION, BRGY. MALPAG, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱48.9M | 100% | Medium risk50 | —-0.082 |
| 157 | 19IJ0087001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, CALBAYOG CITY, COASTAL ROAD, PACKAGE 2A SAMAR | Region VIII | Samar 1st DEO | Completed | ₱44.6M | 100% | Medium risk49 | —-0.034 |
| 158 | 21IJ0048CONSTRUCTION OF LEVEL III WATER SUPPLY PROJECT,SAN JORGE, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱27.6M | 100% | Medium risk49 | —-0.060 |
| 159 | 20IJ0060LOCAL PROGRAM: CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, ALMAGRO,SAMAR | Region VIII | Samar 1st DEO | Completed | ₱23.5M | 100% | Medium risk49 | —-0.063 |
| 160 | 20IJ0061LOCAL PROGRAM: CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, STO. NIÑO, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱21.6M | 100% | Medium risk49 | —-0.064 |
| 161 | 20IA0038ASSET PRESERVATION - PREVENTION MAINTENANCE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL ROAD, K1082+000 - K1083+170 | Region VIII | Biliran DEO | Completed | ₱31.4M | 100% | Medium risk49 | —-0.095 |
| 162 | 18IA0044CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG NAVAL-CAIBIRAN CROSS COUNTRY ROAD K1039+590 - K1040+540, CABIBIHAN, CAIBIRAN FROM 11.58646, 124.50395 TO 11.58529, 124.51176, CABIBIHAN, CAIBIRAN, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱38.1M | 100% | Medium risk49 | —-0.096 |
| 163 | 21IJ0127REPLACEMENT OF PERMANENT WEAK BRIDGES-GANDARA BR. ALONG DAANG MAHARLIKA (SM)(SN ISIDRO-SN JUANICO BR.) | Region VIII | Samar 1st DEO | Completed | ₱36.6M | 100% | Medium risk49 | —-0.048 |
| 164 | 18IJ0077WIDENING OF PERMANENT BRIDGES, ARAPISON BR. (B00351SM) ALONG DAANG MAHARLIKA (SM)(SN ISIDRO - SN JUANICO BR.) | Region VIII | Samar 1st DEO | Completed | ₱30M | 100% | Medium risk49 | —-0.055 |
| 165 | 18IJ0055WIDENING OF PERMANENT BRIDGES: MALAJOG BR.(B00339SM)ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) SAMAR | Region VIII | Samar 1st DEO | Completed | ₱31.2M | 100% | Medium risk49 | —-0.060 |
| 166 | 18IJ0068WIDENING OF PERMANENT BRIDGES: BULONGTO BR. (B00340SM) ALONG DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR.) | Region VIII | Samar 1st DEO | Completed | ₱39.9M | 100% | Medium risk49 | —-0.060 |
| 167 | 24IK0096REHAB./RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS- SECONDARY ROADS, BASEY-MARABUT-PINAMITINAN RD.- K0932+028-K0932+180, K0932+185-K0932+286, K0932+317-K0932+612, K0936+000-K0936+803, MARABUT, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱37.1M | 100% | Medium risk49 | —-0.059 |
| 168 | 19IH0040CONSTRUCTION/REHABILITATION/IMPROVEMENT OF LEVEL III WATER SUPPLY SYSTEM, BOBON, N. SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱40.5M | 100% | Medium risk49 | —-0.052 |
| 169 | 18IM0025CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-TIGBAO STA FE-SN MIGUEL RD K0912+(-180)-K0912+(-080), K0914+(-300)-K0914+(-080), K0914+023-K0914+080, K0914+056-K0914+071, K0914+118-K0914+163, K0914+153-K0914+431, K0914+247-K0914+431, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱46.5M | 100% | Medium risk49 | —-0.095 |
| 170 | 18IA0045CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG BILIRAN CIRCUMFERENTIAL ROAD K1046+050, K1060+008 TO 1060+508, MASAGAOSAO & INASUYAN, KAWAYAN (FROM 11.69213 TO 11.69095, 124.37538 AND FROM 11.69237, 124.48771 TO 11.6898, 124.49134), BRGY. MASAGAOSAO | Region VIII | Biliran DEO | Completed | ₱45.9M | 100% | Medium risk49 | —-0.094 |
| 171 | 18IA0043CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG BILIRAN CIRCUMFERENTIAL ROAD K1105+913-K1106+540, LOOC, CABUCGAYAN (FROM 11.47964, 124.5457 TO 11.47852, 124.54041), CABUCGAYAN, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱45.6M | 100% | Medium risk49 | —-0.095 |
| 172 | 20IH0018WIDENING OF PERMANENT BRIDGES, CAAGUIT-ITAN BR. 2 (B00241SM) ALONG DAANG MAHARLIKA (SM) (SAN ISIDRO - SAN JUANICO BR.), SAN ISIDRO, N. SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱20.4M | 100% | Medium risk49 | —-0.054 |
| 173 | 20IJ0041001: DAANG MAHARLIKA (SM) ( SN ISIDRO - SN JUANICO BR.) KO778+800 - KO780+000, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱36.8M | 100% | Medium risk49 | —-0.096 |
| 174 | 18IC0028WIDENING OF PERMANENT BRIDGES, CAMBATISTA BRIDGE (B00037LT), DAANG MAHARLIKA (LT) ROAD, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱36M | 100% | Medium risk49 | —-0.061 |
| 175 | 25OF0132CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY BAGONG SILANGAN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱48M | 17% | Medium risk49 | —-0.030 |