Contractor dossier
253 projects on file, including joint ventures this contractor is part of.
Total projects
253
Total budget
₱16.3B
Average progress
92.4%
Completion rate
78.7%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
28
11.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 218 | ₱15B | 56.0 | 27 | 91.6% |
| Region V | 15 | ₱521.7M | 54.0 | 1 | 100.0% |
| Region VII | 9 | ₱313.8M | 46.9 | 0 | 100.0% |
| Region IV-B | 5 | ₱186.2M | 39.5 | 0 | 100.0% |
| Region VI | 3 | ₱196.4M | 60.8 | 0 | 100.0% |
| National Capital Region | 2 | ₱67.3M | 48.6 | 0 | 58.3% |
| Region XIII | 1 | ₱926K | 18.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 98 | ₱5.9B | 53.1 | 2 | 98.5% |
| Flood Control and Drainage | 59 | ₱4B | 54.2 | 2 | 93.1% |
| Bridges | 39 | ₱2.4B | 52.5 | 7 | 83.9% |
| Water Provision and Storage | 20 | ₱727M | 47.4 | 0 | 100.0% |
| OTHER | 19 | ₱2.4B | 82.9 | 14 | 79.5% |
| Buildings and Facilities | 17 | ₱761.8M | 50.2 | 2 | 84.5% |
| GAA 2025 SSP | 1 | ₱98.9M | 96.4 | 1 | 11.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IJ0053CSSP: CONSTRUCTION OF BUAO BRIDGE, BARANGAY BUAO, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98.9M | 11% | High risk96 | Flagged0.039 |
| 24IC0174CONCRETING OF BRGY. HUPIT FMR, BRGY. HUPIT, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱11.9M | 0% | High risk89 | Flagged0.068 |
| 22I00090SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITES - CONSTRUCTION OF JUNCTION NATIONAL ROAD BRGY. CAROLINA, CAN-AVID - DOLORES - MASLOG ROAD, (BRGY. MAGSAYSAY - BRGY. MAGONGBONG - BRGY. GAP-A | Region VIII | Region VIII | On-Going | ₱238.6M | 91% | High risk85 | Flagged0.043 |
| 24I00035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+219 - K0945+549, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 40% | High risk85 | Flagged0.039 |
| 24I00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+549 - K0945+879, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 50% | High risk85 | Flagged0.036 |
| 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 24I00140CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 45% | High risk84 | Flagged0.038 |
| 24I00204SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIVERSION COASTAL ROAD AND BRIDGE FROM SABANG SOUTH TO SABANG NORT | Region VIII | Region VIII | On-Going | ₱163.4M | 65% | High risk84 | Flagged0.028 |
| 19I00120ASSET PRESERVATION / REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CATBALOGAN DIVERSION RD. - KO801+(-850) - KO801+510, SAMAR | Region VIII | Region VIII | Completed | ₱236.4M | 100% | High risk84 | Flagged0.009 |
| 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 24IJ0050(RE-ADVERTISED) OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE 5A, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱144.2M | 81% | High risk83 | Flagged0.022 |
| 23I00109ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA - K1206+604 - K1209+000, K1212+046 - K1213+199, SOUTHERN LEYTE DISTRICT-SUB | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk82 | —-0.020 |
| 20GI0017ACCESS ROAD INCLUDING ALTERNATE ROUTE LEADING TO SEVEN CITIES AGRI TOURISM SITE, ALIMODIAN, ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱75.3M | 100% | High risk81 | —-0.019 |
| 23IJ0061(RE-ADVERTISED) CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE B, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.5M | 100% | High risk80 | —-0.029 |
| 18II0063CONSTRUCTION OF MISSING LINKS/NEW ROADS, ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD (NORTHERN SAMAR SIDE), INCL. ROW, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Terminated | ₱14.5M | 100% | High risk79 | Flagged0.011 |
| 18IM0015ROAD WIDENING - RIZAL AVENIDA EXT. ROAD K0905+(-909)-K0905+(-733), K0905+(-733)-K0905+(-705), K0905+(-480)-K0905+(-471),K0905+(-471)-K0905+(-440), TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱8.1M | 100% | High risk77 | —-0.037 |
| 17FK0009CLUSTER II-CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NAT'L. ROADS REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES IN FIRST DISTRICT OF SORSOGON | Region V | Sorsogon DEO | Completed | ₱41.9M | 100% | High risk75 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IC0174CONCRETING OF BRGY. HUPIT FMR, BRGY. HUPIT, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱11.9M | 0% | High risk89 | Flagged0.068 |
| 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 22I00090SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITES - CONSTRUCTION OF JUNCTION NATIONAL ROAD BRGY. CAROLINA, CAN-AVID - DOLORES - MASLOG ROAD, (BRGY. MAGSAYSAY - BRGY. MAGONGBONG - BRGY. GAP-A | Region VIII | Region VIII | On-Going | ₱238.6M | 91% | High risk85 | Flagged0.043 |
| 24I00035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+219 - K0945+549, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 40% | High risk85 | Flagged0.039 |
| 25IJ0053CSSP: CONSTRUCTION OF BUAO BRIDGE, BARANGAY BUAO, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98.9M | 11% | High risk96 | Flagged0.039 |
| 24I00140CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 45% | High risk84 | Flagged0.038 |
| 24I00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+549 - K0945+879, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 50% | High risk85 | Flagged0.036 |
| 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 24I00204SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIVERSION COASTAL ROAD AND BRIDGE FROM SABANG SOUTH TO SABANG NORT | Region VIII | Region VIII | On-Going | ₱163.4M | 65% | High risk84 | Flagged0.028 |
| 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 24IJ0050(RE-ADVERTISED) OO1: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE 5A, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱144.2M | 81% | High risk83 | Flagged0.022 |
| 25I00112BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - PEÑA BR. (B00333SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.), SAMAR 1ST DEO | Region VIII | Region VIII | On-Going | ₱38.6M | 0% | Medium risk51 | Flagged0.016 |
| 18II0063CONSTRUCTION OF MISSING LINKS/NEW ROADS, ARTECHE - BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG - RAWIS ROAD (NORTHERN SAMAR SIDE), INCL. ROW, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Terminated | ₱14.5M | 100% | High risk79 | Flagged0.011 |
| 19I00120ASSET PRESERVATION / REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CATBALOGAN DIVERSION RD. - KO801+(-850) - KO801+510, SAMAR | Region VIII | Region VIII | Completed | ₱236.4M | 100% | High risk84 | Flagged0.009 |
| 24I00032CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0944+882 - K0945+219, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 0% | High risk69 | Flagged0.009 |
| 17I00046CONSTRUCTION OF WESTERN LEYTE PROVINCIAL HOSPITAL IN BAYBAY, LEYTE, WESTERN LEYTE PROVINCIAL HOSPITAL, BRGY. COGON, BAYBAY CITY, LEYTE | Region VIII | Region VIII | Completed | ₱149M | 100% | Medium risk55 | Flagged0.008 |
| 17IJ0123CONCRETING OF GANDARA-MATUGUINAO ACCESS ROAD(PHASE III) SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱90.9M | 100% | High risk62 | Flagged0.007 |
| 25I00101BRIDGE - WIDENING OF PERMANENT BRIDGES - MAWO PARALLEL BR. (B00599SM) ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR.) (PHASE II) | Region VIII | Region VIII | On-Going | ₱159.2M | 35% | High risk67 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 18IJ0113REHABILITATION OF BARANGAY LAMBAO - BARANGAY MABUHAY ROAD STA. MARGARITA, SAMAR, SAMAR. | Region VIII | Samar 1st DEO | Completed | ₱19.4M | 100% | Medium risk48 | —-0.094 |
| 202 | 20IH0014PREVENTIVE MAINTENANCE: ASPHALT OVERLAY CATARMAN - CALBAYOG RD. K0743+126 - K0743+860, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱16.9M | 100% | Medium risk48 | —-0.094 |
| 203 | 23OF0193CONSTRUCTION OF ROAD AT SAPPHIRE ST., BRGY. PAYATAS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱19.3M | 100% | Medium risk48 | —-0.041 |
| 204 | 19IC0004NETWORK DEVELOPMENT-ROAD WIDENING-TERTIARY ROADS, STA. FE-PASTRANA-DAGAMI ROAD (S00041LT) K0928+780 - K0929+383, STA. FE, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱18.3M | 100% | Medium risk48 | —-0.096 |
| 205 | 19II0005REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS, RAWIS-CATUBIG RD, K0787+248 - K0788+141, K0799+234.50 - K0799+298 - K0799+322 - K0799+686 - K0801+190, K0801+472, K0801 784 - K0801 858, K0801+872 - K0802+000, 2ND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱35.9M | 100% | Medium risk48 | —-0.093 |
| 206 | 18IJ0057PREVENTIVE MAINTENANCE ALONG DAANG MAHARLIKA (SM)(SN. ISIDRO - SN. JUANICO BR.) K0719+219 - K0720+964; K0720+990 - K0721+000 , CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱26.4M | 100% | Medium risk48 | —-0.095 |
| 207 | 22IG0064CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, HILONGOS, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱40.5M | 100% | Medium risk48 | —-0.060 |
| 208 | 24IG0042CONSTRUCTION AND ROAD, ODIONG TO HIMAT-E WATER SYSTEM SOURCE, JAVIER, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱14.8M | 100% | Medium risk48 | —-0.093 |
| 209 | 23IJ0027OO1: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) K0713+915 - K0714+000 | Region VIII | Samar 1st DEO | Completed | ₱10.7M | 100% | Medium risk48 | —-0.093 |
| 210 | 19IM0010CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF SHORE PROTECTION ALONG MAGALLANES, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱31M | 100% | Medium risk47 | —-0.080 |
| 211 | 19IM0014CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF REVETMENT ALONG MANGONBANGON RIVER, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.080 |
| 212 | 21IM0067CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND RIVERBANK PROTECTION, KNIGHTSRIDGE BRIDGE RESIDENCE, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | Completed | ₱43.2M | 100% | Medium risk47 | —-0.081 |
| 213 | 22IK0018CONSTRUCTION OF FLOOD CONTROL PROTECTION WORKS STRUCTURE, IBA BRIDGE, BRGY. IBA, BASEY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱38M | 100% | Medium risk47 | —-0.078 |
| 214 | 19IM0041CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. 96, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱9.6M | 100% | Medium risk47 | —-0.079 |
| 215 | 22HC0052SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. POBLACION TO BRGY SAN RAMON, SAGBAYAN, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱47.5M | 100% | Medium risk47 | —-0.068 |
| 216 | 19IJ0105PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS. CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG GANDARA RIVER - BRGY. VILLAHERMOSA ORIENTAL, PAGSANGHAN, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.083 |
| 217 | 18IJ0103CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, BARANGAY HIMAY, SAN JORGE, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱23.2M | 100% | Medium risk47 | —-0.080 |
| 218 | 18IJ0104CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, BARANGAY MANCOL, SAN JORGE, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱23.2M | 100% | Medium risk47 | —-0.081 |
| 219 | 22HC0048SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BAOGO, INABANGA, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱47.3M | 100% | Medium risk46 | —-0.062 |
| 220 | 19IJ0002CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TAGNAO RIVER (UPSTREAM), PHASE II, BRGY. TAGNAO, GANDARA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱36.5M | 100% | Medium risk46 | —-0.082 |
| 221 | 18IJ0128TIDE EMBANKMENT ALONG BURABUD SHORELINE, BARANGAY BURABUD, STA. MARGARITA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱44.8M | 100% | Medium risk46 | —-0.075 |
| 222 | 19IJ0121002:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS,FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CALBAYOG RIVER(UPSTREAM),FROM JASMINEZ BR TO PAYAHAN | Region VIII | Samar 1st DEO | Completed | ₱40.7M | 100% | Medium risk46 | —-0.083 |
| 223 | 19IJ0013(RE-ADVERTISE) 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATIONSTRUCTURES AND DRAINAGE SYSTEM.CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG JIBATANG RIVER (DOWNSTREAM), BRGY.NABANG, CALB. CITY | Region VIII | Samar 1st DEO | Completed | ₱43M | 100% | Medium risk46 | —-0.081 |
| 224 | 19IJ0012CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG JIBATANG RIVER (DOWNSTREAM), BRGY. CAPACUHAN (PHASE II), CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱34.3M | 100% | Medium risk46 | —-0.081 |
| 225 | 19IJ0018CONSTRUCTION OF FLOOD CONTROL ALONG SINIDMAN RIVER,BRGY. SINIDMAN, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱34.1M | 100% | Medium risk46 | —-0.082 |