Opening the dossier…
Opening the dossier…
Contractor dossier
28 projects on file, including joint ventures this contractor is part of.
Total projects
28
Total budget
₱1.6B
Average progress
100.0%
Completion rate
96.4%
Average risk score
51.1
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 23 | ₱1.4B | 52.2 | 0 | 100.0% |
| Region X | 4 | ₱177.1M | 47.2 | 0 | 100.0% |
| Region IV-B | 1 | ₱4.9M | 40.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 17 | ₱1.3B | 55.3 | 0 | 100.0% |
| Bridges | 5 | ₱10.4M | 22.3 | 0 | 100.0% |
| OTHER | 3 | ₱317.6M | 81.4 | 0 | 100.0% |
| Flood Control and Drainage | 3 | ₱42M | 44.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17I00014IMPROVEMENT / WIDENING OF NATIONAL ROADS, DAANG MAHARLIKA (S00083LT), KO936+000 - KO941+1488, DULAG, LEYTE | Region VIII | Region VIII | Completed | ₱181.1M | 100% | High risk83 | —-0.009 |
| 17I00017IMPROVEMENT/WIDENING OF NATIONAL ROADS, PALO - CARIGARA - ORMOC ROAD, (S00074LT), KO965+1014 - KO969+298, CAPOOCAN, LEYTE | Region VIII | Region VIII | Completed | ₱93.6M | 100% | High risk82 | —-0.026 |
| 17ID0049NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS TERTIARY JARO-DAGAMI-BURAUEN-LA PAZ ROAD (S00095LT) K0963+848 - K0964+814, K0969+264 - K0969+588 | Region VIII | Leyte 2nd DEO | Completed | ₱42.8M | 100% | High risk78 | —-0.038 |
| 21I00070CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION/IMPROVEMENT OF ROAD ALONG JNR MAKINHAS - CIABU - MONTERICO ROAD SECTION, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱168.8M | 100% | High risk63 | —-0.061 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 17I00014IMPROVEMENT / WIDENING OF NATIONAL ROADS, DAANG MAHARLIKA (S00083LT), KO936+000 - KO941+1488, DULAG, LEYTE | Region VIII | Region VIII | Completed | ₱181.1M | 100% | High risk83 | —-0.009 |
| 2 | 17I00017IMPROVEMENT/WIDENING OF NATIONAL ROADS, PALO - CARIGARA - ORMOC ROAD, (S00074LT), KO965+1014 - KO969+298, CAPOOCAN, LEYTE | Region VIII | Region VIII | Completed | ₱93.6M | 100% | High risk82 | —-0.026 |
| 3 | 17ID0049NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS TERTIARY JARO-DAGAMI-BURAUEN-LA PAZ ROAD (S00095LT) K0963+848 - K0964+814, K0969+264 - K0969+588 | Region VIII | Leyte 2nd DEO | Completed | ₱42.8M | 100% | High risk78 | —-0.038 |
| 4 | 21I00070CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION/IMPROVEMENT OF ROAD ALONG JNR MAKINHAS - CIABU - MONTERICO ROAD SECTION, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱168.8M | 100% | High risk63 | —-0.061 |
| 5 | 18I00007ASSET PRESERVATION OF NAT'L. ROADS-PREVENTIVE MAINT. BASED ON PAVEMENT MGT. SYSTEM/HIGHWAY DEV'T. & MGT.-4 (HDM-4)-PRIMARY ROADS, DAANG MAHARLIKA LT, KO911+(-118)-KO914+083,KO916+130-KO916+911,KO916+911-KO918+850,KO918+850-KO919+000,KO919+...,LEYTE 1ST LD | Region VIII | Region VIII | Completed | ₱96.5M | 100% | Medium risk60 | —-0.084 |
| 6 | 19I00006ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS, BATO-BONTOC ROAD, K1111+250 - K1116+000 (S00193LT), LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱124.2M | 100% | Medium risk59 | —-0.079 |
| 7 | 17I00009ASSET PRESERVATION OF NAT'L. ROADS-PREVENTIVE MAINT. BASED ON PAVEMENT MGT. SYSTEM/HIGHWAY DEV'T. & MGT.-4(HDM-4)-PRIMARY ROADS,PALO-CARIGARA-ORMOC ROAD [KO957+014-KO957+416; KO959+427-KO960+461; KO961+(-553)-KO961+618; KO962+695-KO963+530; KO964+000-KO96 | Region VIII | Region VIII | Completed | ₱69.7M | 100% | Medium risk59 | —-0.057 |
| 8 | 17I00023ASSET PRESERVATION OF NAT'L. ROADS-PREVENTIVE MAINT. BASED ON PAVEMENT MGT. SYSTEM/HIGHWAY DEV'T. & MGT.-4(HDM-4)-PRIMARY ROADS,TACLOBAN-BAYBAY SOUTH ROAD (KO986+285-KO986+587;KO988+880-KO989+000;KO993+000-K1005+000;K1005+276-K1006+346;K1007+000-K1007+783 | Region VIII | Region VIII | Completed | ₱210.4M | 100% | Medium risk59 | —-0.025 |
| 9 | 17IC0049PREVENTIVE MAINTENACE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) ALONG TIGBAO-PULAK-STA. FE ROAD (S00039LT), K0909+(-303) - K0914+607, STA. FE, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱65.6M | 100% | Medium risk59 | —-0.057 |
| 10 | 17IA0012ASPHALT OVERLAY ALONG NAVAL-CAIBIRAN CROSS COUNTRY ROAD, K1036+000 - K1037+000; K1037+267 - K1039+500 (11.5828, 124.4767 - 11.5864, 124.5031), NAVAL, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱33.2M | 100% | Medium risk57 | —-0.060 |
| 11 | 17IC0030PREVENTIVE MAINT. BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) ALONG STA. FE - PASTRANA - DAGAMI ROAD (S00041LT) K0925+(-358) -K0929+755, STA. FE, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱46.5M | 100% | Medium risk56 | —-0.059 |
| 12 | 18I00006ASSET PRESERVATION OF NAT'L. ROADS-PREVENTIVE MAINT. BASED ON PAVEMENT MGT. SYSTEM/HIGHWAY DEV'T. & MGT.-4 (HDM-4) - TERTIARY ROADS, BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA ROAD, K0910+188-K0912+263,K0912+263-K0914+566,K0914+622-K0915...,LEYTE 1ST LD | Region VIII | Region VIII | Completed | ₱70.3M | 100% | Medium risk56 | —-0.090 |
| 13 | 17IA0014ASPHALT OVERLAY ALONG BILIRAN CIRCUMFERENTIAL ROAD, K1047+200-K1049+185; K1068+600-K1069+696 (11.6932, 124.3842 - 11.6966, 124.3987; 11.6541, 124.5413 - 11.6496, 124.5484), PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱31.4M | 100% | Medium risk56 | —-0.060 |
| 14 | 19IA0034ASPHALT OVERLAY, BILIRAN CIRCUMFERENTIAL ROAD K1008+360 - K1009+465, BILIRAN, BILIRAN | Region VIII | Biliran DEO | Completed | ₱62.2M | 100% | Medium risk56 | —-0.094 |
| 15 | 17IC0029CONST./UPGRADING/REHAB. OF DRAINAGE ALONG TACLOBAN-BAYBAY SOUTH ROAD (TANAUAN SECTION) S00057LT, K0921+(-112) - K0921+792, K0921+821 - K0921+1097, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱28.9M | 100% | Medium risk55 | —-0.060 |
| 16 | 19IA0025ASPHALT OVERLAY, NAVAL-CAIBIRAN CROSS COUNTRY ROAD K1032+620 - K1033+709, K1033+735 - K1033+988, NAVAL, BILIRAN | Region VIII | Biliran DEO | Completed | ₱70.5M | 100% | Medium risk55 | —-0.092 |
| 17 | 24KM0051CONSTRUCTION OF ROAD WITH BOX CULVERT ALONG PUROK POBLACION, BRGY. ROGONGON, ILIGAN CITY | Region X | Iligan City DEO | On-Going | ₱49.5M | 100% | Medium risk49 | —-0.055 |
| 18 | 24KM0050CONSTRUCTION OF ROAD ALONG SITIO SINICABOG, BRGY. ROGONGON, ILIGAN CITY | Region X | Iligan City DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.092 |
| 19 | 18IA0005CONST./EXTENSION OF FLOOD CONTROL STRUCTURE ALONG TUCDAO RIVER (PHASE 4) PROTECTING TUCDAO BRIDGE & BILIRAN CIRCUMFERENTIAL ROAD (11.6978, 124.4639), KAWAYAN, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.083 |
| 20 | 18IA0002CONST./EXTENSION OF FLOOD CONTROL STRUCTURE ALONG BUSALI RIVER PROTECTING BUSALI BRIDGE & BILIRAN CIRCUMFERENTIAL ROAD, PHASE 2 (11.4915, 124.4482), BILIRAN, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱18.5M | 100% | Medium risk47 | —-0.083 |
| 21 | 20KH0029ASSET PRESERVATION-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONALROADS -PRIMARY ROADS - BUTUAN CITY - CAGAYAN DE ORO CITY - ILIGAN CITY ROAD -K1439+700-K1440+207.80, K1441+500-K1441+550, K1441+562-K1442+407,CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱43.1M | 100% | Medium risk46 | —-0.088 |
| 22 | 21KF0097ROAD WIDENING ALONG OVERTON BURU-UN BOUNDARY ROAD, K1534+480-K1534+840, ILIGAN CITY | Region X | Lanao del Norte 1st DEO | Completed | ₱35M | 100% | Medium risk45 | —-0.094 |
| 23 | 21EB0085CONSTRUCTION OF DRAINAGE AND SCHOOL GROUND IMPROVEMENT IN PILOT ELEMENTARY SCHOOL, BARANGAY 3, SAN JOSE, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱4.9M | 100% | Medium risk40 | —-0.070 |
| 24 | 19IA0045REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, MAINIT BRIDGE (B00063BR) ALONG BILIRAN CIRCUMFERENTIAL ROAD | Region VIII | Biliran DEO | Completed | ₱2.8M | 100% | Low risk25 | —-0.059 |
| 25 | 17IA0021REPAIR OF BALAQUID BRIDGE (B00051BR) ALONG BILIRAN CIRCUMFERENTIAL ROAD, CABUCGAYAN, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.034 |