Contractor dossier
127 projects on file, including joint ventures this contractor is part of.
Total projects
127
Total budget
₱3.5B
Average progress
94.0%
Completion rate
86.6%
Average risk score
46.7
Medium risk on average, out of 100
Flagged as unusual
6
4.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 127 | ₱3.5B | 46.7 | 6 | 94.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 58 | ₱1.5B | 47.6 | 3 | 93.6% |
| Buildings and Facilities | 35 | ₱246.3M | 39.7 | 1 | 93.2% |
| Flood Control and Drainage | 28 | ₱1.2B | 51.7 | 1 | 97.7% |
| Bridges, Roads | 3 | ₱348.2M | 59.7 | 1 | 71.3% |
| OTHER | 2 | ₱178.8M | 71.2 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱1.9M | 22.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00478REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS- PRIMARY ROADS, MANILA NORTH ROAD - K0491 + 700 - K0492 + 000 | Region I | Region I | On-Going | ₱5.8M | 100% | High risk78 | —-0.001 |
| 24AA0402CONCRETING OF BRGY. NALBO FMR, BRGY. NALBO, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 72% | High risk76 | Flagged0.023 |
| 23A00095CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES, SAMAC SWIP, BUGNAY SWIP, BINGAO SWIP SMALL WATER IMPOUNDING PROJECTS BRGYS. STA ASUNCION, SAN AGUSTIN AND SAN PEDRO, SAN NICOLAS, ILO | Region I | Region I | Completed | ₱193M | 100% | High risk74 | —-0.033 |
| 24A00485CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BY-PASS ROAD, SAN NICOLAS ROAD SECTION, SAN NICOLAS, ILOCOS NORTE | Region I | Region I | On-Going | ₱123M | 93% | High risk71 | —-0.027 |
| 22A00066CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTE | Region I | Region I | Completed | ₱43.2M | 100% | High risk70 | —-0.080 |
| 25A00168CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BY-PASS ROAD, (SAN NICOLAS SECTION), PACKAGE B, ILOCOS NORTE | Region I | Region I | On-Going | ₱46.8M | 20% | High risk70 | —-0.020 |
| 23AA0026CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUAGAO RIVER (LEFT AND RIGHT BANK) BARANGAY SAN LORENZO AND ABACA, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱29.4M | 100% | High risk70 | —-0.064 |
| 25AA0038FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANBAN RIVER, BARANGAY TAGUIPORO, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱37.6M | 92% | High risk70 | —-0.029 |
| 25AA0122FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANBAN RIVER, BARANGAY BARUYEN, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱37.6M | 100% | High risk70 | —-0.064 |
| 23AB0089CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS, MANILA NORTH RD K0483+440 - K0484+000 | Region I | Ilocos Norte 2nd DEO | Completed | ₱5.8M | 100% | High risk70 | —-0.084 |
| 23AB0072CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY ROOT, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱39.2M | 100% | High risk70 | —-0.074 |
| 25AB0162BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MAGLAOI NORTE, CURRIMAO ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 0% | High risk69 | Flagged0.011 |
| 23AA0057FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANBAN RIVER, SITIO TALNA, BARANGAY TAGUIPORO, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk69 | —-0.064 |
| 18AA0376CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION, VIRBIRA-BARBAQUEZO ROAD NETWORK LEADING TO SABO DAM, BRGY. BARBAQUEZO, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱29.3M | 100% | High risk69 | —-0.080 |
| 21AB0137LOCAL INFRASTRUCTURE PROGRAM, REHABILITATION/IMPROVEMENT OF BADOC-APATOT ROAD (KM 449.501 - 453.080) BADOC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱15.4M | 100% | High risk68 | —-0.083 |
| 19A00089CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCL. LOCAL PROJECTS (VIILP), IMPROVEMENT/ CONCRETING OF PAOAY LAKE CIRCUMFERENTIAL ROAD AND MALACAÑANG TO AMIANAN, PAOAY, ILOCOS NORTE | Region I | Region I | Completed | ₱115.8M | 100% | High risk68 | —-0.066 |
| 18AA0417REHAB. OF MUNICIPAL AUDITORIUM, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱15M | 100% | High risk67 | —-0.081 |
| 25A00223CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), ILOCOS FLY-IN CRUISE ROAD, CURRIMAO AND PAOAY, ILOCOS NORTE | Region I | Region I | On-Going | ₱181.8M | 14% | High risk65 | Flagged0.017 |
| 23A00279CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTE | Region I | Region I | Completed | ₱173M | 100% | High risk65 | —-0.019 |
| 17AB0031ROAD IMPROVEMENT/CONCRETING OF CIRCUMFERENTIAL ROAD LEADING TO JUAN LUNA SHRINE, LA VIRGEN MILAGROSA SHRINE AND OTHER ACCESS ROADS, BADOC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱44.7M | 100% | High risk64 | —-0.048 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AA0402CONCRETING OF BRGY. NALBO FMR, BRGY. NALBO, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 72% | High risk76 | Flagged0.023 |
| 25A00223CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), ILOCOS FLY-IN CRUISE ROAD, CURRIMAO AND PAOAY, ILOCOS NORTE | Region I | Region I | On-Going | ₱181.8M | 14% | High risk65 | Flagged0.017 |
| 25AB0162BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MAGLAOI NORTE, CURRIMAO ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 0% | High risk69 | Flagged0.011 |
| 17AB0054CONCRETING OF BRGY. STA. CRUZ FMR, BRGY. STA. CRUZ, BADOC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱1.9M | 100% | Low risk17 | Flagged0.004 |
| 17AB0249REPAIR AND MAINTENANCE OF EXISTING DIKE ALONG SOLSONA RIVER, LEFT SIDE,SOLSONA,ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱4.5M | 100% | Low risk23 | Flagged0.004 |
| 17AB0053CONCRETING OF BRGY. MADUPAYAS-CAMANGA FMR, BRGY. MADUPAYAS, BADOC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱1.9M | 100% | Low risk17 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24A00446BASIC INFRASTRUCTURE PROGRAM (BIP), REHABILITATION OF FLOOD CONTROL ALONG GALPAC CREEK, PAOAY, ILOCOS NORTE | Region I | Region I | Completed | ₱99M | 100% | Medium risk59 | —-0.051 |
| 27 | 22AB0128CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (PINILI INABEL CENTER), PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱9.8M | 100% | Medium risk58 | —-0.081 |
| 28 | 23AB0068CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY LACUBEN, BADOC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱39.2M | 100% | Medium risk57 | —-0.075 |
| 29 | 23AB0070CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY PARATONG, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱39.2M | 100% | Medium risk57 | —-0.074 |
| 30 | 25AB0131BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAGLAOI NORTE, CURRIMAO, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 0% | Medium risk57 | —-0.009 |
| 31 | 18AB0076CONCRETING OF NAGBACALAN FMR, BRGY. NAGBACALAN, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱4.7M | 100% | Medium risk57 | —-0.028 |
| 32 | 24AB0074CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BALBALDEZ, BADOC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱5.9M | 100% | Medium risk57 | —-0.083 |
| 33 | 21AB0166LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. GABUT NORTE, BADOC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk56 | —-0.083 |
| 34 | 24A00325CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF MARCOS SWIP DAM, MARCOS, ILOCOS NORTE | Region I | Region I | On-Going | ₱49.8M | 85% | Medium risk53 | —-0.025 |
| 35 | 23AB0060CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PAGSANAHAN NORTE, BADOC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk53 | —-0.082 |
| 36 | 19AB0114CONSTRUCTION OF ONE (1) STOREY- THREE (3) CLASSROOM SCHOOL BUILDING, NAGBACALAN ELEMENTARY SCHOOL, PAOAY, ILOCOS NORTE (100185) | Region I | Ilocos Norte 2nd DEO | Completed | ₱5.8M | 100% | Medium risk53 | —-0.042 |
| 37 | 23A00092CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), ILOCOS FLY-IN CRUISE ROAD, CURRIMAO AND PAOAY, ILOCOS NORTE | Region I | Region I | Completed | ₱57.9M | 100% | Medium risk53 | —-0.062 |
| 38 | 24A00448BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER (UPSTREAM OF NALASIN BRIDGE), PAOAY, ILOCOS NORTE (PHASE 2) | Region I | Region I | On-Going | ₱69.3M | 81% | Medium risk52 | —-0.018 |
| 39 | 20A00041CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS- PAOAY-LAOAG INTERNATIONAL AIRPORT ACCESS ROAD, PAOAY, ILOCOS NORTE | Region I | Region I | Completed | ₱89.4M | 100% | Medium risk52 | —-0.069 |
| 40 | 23A00337SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONCRETING OF ROAD, SITIO LASIEN, BRGY. NAGREBCAN, BADOC, ILOCOS NORTE | Region I | Region I | Completed | ₱73.7M | 100% | Medium risk52 | —-0.073 |
| 41 | 22A00180CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BONGO RIVER, BRGY. MACAYEPYEP, BANNA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱48.2M | 100% | Medium risk51 | —-0.066 |
| 42 | 23AB0019REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS, ILOCOS NORTE-APAYAO RD - K0518+549 - K0518+637, K0518+805 - K0518+836 | Region I | Ilocos Norte 2nd DEO | On-Going | ₱23M | 89% | Medium risk51 | —-0.030 |
| 43 | 22AB0018REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, TERTIARY ROADS, ILOCOS NORTE-APAYAO RD - K0516 + 513 - K0516 + 531, K0516 + 591 - K0516 + 611 | Region I | Ilocos Norte 2nd DEO | Completed | ₱13.8M | 100% | Medium risk51 | —-0.083 |
| 44 | 22AB0002REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, DINGRAS-MARCOS OLD RD - K0504 + 000 - K0504 + 391 | Region I | Ilocos Norte 2nd DEO | Completed | ₱13.4M | 100% | Medium risk51 | —-0.082 |
| 45 | 23AB0182CONCRETING/IMPROVEMENT OF BRGY. BUANGA FMR, BRGY. BUANGA, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱19.9M | 100% | Medium risk51 | —-0.025 |
| 46 | 19AB0075CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BONGO RIVER (LEFT BANK), MARCOS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱39.1M | 100% | Medium risk51 | —-0.066 |
| 47 | 25AB0003CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF GROUNDSILL AND ITS APPURTENANT STRUCTURES AT MADONGAN RIS, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱14.4M | 78% | Medium risk51 | —-0.031 |
| 48 | 20AB0091CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BONGO RIVER (LEFT BANK), MARCOS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱25M | 100% | Medium risk51 | —-0.068 |
| 49 | 21A00105CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - ILOCOS FLY-IN CRUISE ROAD, CURRIMAO AND PAOAY, ILOCOS NORTE | Region I | Region I | Completed | ₱58.6M | 100% | Medium risk50 | —-0.078 |
| 50 | 19AB0017CONSTRUCTION/IMPROVEMENT OF CIRCUMFERENTIAL ROAD LEADING TO JUAN LUNA SHRINE, LA VIRGEN MILAGROSA SHRINE AND OTHER ACCESS ROADS, BADOC, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱86.9M | 100% | Medium risk50 | —-0.067 |