Contractor dossier
241 projects on file, including joint ventures this contractor is part of.
Total projects
241
Total budget
₱11.7B
Average progress
92.2%
Completion rate
71.8%
Average risk score
58.1
Medium risk on average, out of 100
Flagged as unusual
22
9.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 241 | ₱11.7B | 58.1 | 22 | 92.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 131 | ₱6.6B | 57.8 | 2 | 94.2% |
| Flood Control and Drainage | 38 | ₱1.6B | 57.1 | 0 | 96.8% |
| Buildings and Facilities | 32 | ₱585.4M | 40.0 | 2 | 92.7% |
| OTHER | 19 | ₱1.7B | 77.8 | 8 | 95.1% |
| Bridges | 8 | ₱183.1M | 49.3 | 0 | 92.5% |
| GAA 2025 OO-1 | 6 | ₱450.8M | 93.8 | 6 | 31.6% |
| GAA 2025 OO-2 | 3 | ₱452.2M | 93.3 | 2 | 77.7% |
| GAA 2025 SSP | 2 | ₱148.9M | 94.4 | 2 | 32.2% |
| Water Provision and Storage | 2 | ₱9.9M | 46.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25J00037PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO - PAGADIAN - ZAMBOANGA CITY RD), K1773+361.00 - K1775+181.00 | Region IX | Region IX | On-Going | ₱107.2M | 31% | High risk96 | Flagged0.040 |
| 25J00057ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱90.9M | 8% | High risk94 | Flagged0.026 |
| 25J00239CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SINDANGAN - BAYOG - LAKEWOOD ROAD, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱72M | 24% | High risk94 | Flagged0.017 |
| 25JC0055ROAD WIDENING - DIPOLOG-SINDANGAN-LILOY RD -K1861+760 - K1863+660 | Region IX | Zamboanga del Norte 2nd DEO | On-Going | ₱103.9M | 84% | High risk94 | Flagged0.003 |
| 25J00076ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱52.8M | 33% | High risk94 | Flagged0.013 |
| 25J00069PREVENTIVE MAINTENANCE - PRIMARY ROADS - MAHARLIKA HIGH-WAY (LANAO - PAGADIAN - ZAMBOANGA CITY RD) K1813+842.00-K1814+000.00, K1829+364.00-K1830+300.00, K1830+375.00-K1832+010.00 | Region IX | Region IX | On-Going | ₱88.2M | 26% | High risk94 | Flagged0.020 |
| 25J00027CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, PACKAGE 2, BARANGAY STA. BARBARA SECTION, IMELDA, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱153.6M | 71% | High risk93 | Flagged0.009 |
| 25JC0033CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DAPATAN RIVER (UPSTREAM), DON JOSE AGUIRRE, MANUKAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 2nd DEO | On-Going | ₱125.2M | 79% | High risk93 | —-0.001 |
| 25J00228CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIPOLOG RIVER, BARANGAY DICAYAS, DIPOLOG CITY, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱173.3M | 84% | High risk93 | Flagged0.006 |
| 25J00030PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO - PAGADIAN - ZAMBOANGA CITY RD), K1726+098.00 - K1726+253, K1726+253.00 - K1726+298.00, K1749+000.00 - K1749.635.00 | Region IX | Region IX | On-Going | ₱41.7M | 34% | High risk93 | Flagged0.029 |
| 25J00058ROAD WIDENING - PRIMARY ROADS MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱43.2M | 15% | High risk93 | Flagged0.016 |
| 23J00040CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BACALAN BR. SECTION (B00497MN), LANAO-PAGADIAN-ZAMBOANGA CITY RD (S01113MN), IPIL, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱100.2M | 97% | High risk83 | Flagged0.021 |
| 24J00023CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SINDANGAN-BAYOG-LAKEWOOD ROAD, PACKAGE 1, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱208.2M | 79% | High risk83 | Flagged0.030 |
| 24J00108REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- PRIMARY ROADS, DIPOLOG- SINDANGAN- LILOY ROAD | Region IX | Region IX | On-Going | ₱145.3M | 91% | High risk83 | Flagged0.025 |
| 23J00106CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL PROJECT, BARANGAY KAHAYAGAN, BAYOG, ZAMBOANGA DEL SUR, PHASE III | Region IX | Region IX | On-Going | ₱114.5M | 92% | High risk82 | Flagged0.024 |
| 18JI0064PREVENTIVE MAINTENANCE OF PRIMARY ROAD ALONG LANAO-PAGADIAN- ZAMBOANGA CITY RD - K1729 + 541 - K1731 + 325, K1731 + 350 - K1733 + 345, K1743 + 906 - K1746 + 000 | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱96.5M | 100% | High risk82 | —-0.020 |
| 22J00050CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO - PAGADIAN - ZAMBOANGA CITY ROAD (S01112MN) | Region IX | Region IX | On-Going | ₱114.5M | 95% | High risk82 | Flagged0.033 |
| 22J00052CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO - PAGADIAN - ZAMBOANGA CITY ROAD (S01112MN) | Region IX | Region IX | On-Going | ₱99.8M | 90% | High risk82 | Flagged0.034 |
| 20J00168REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS DAMAGE PAVED ROADS - PRIMARY ROADS | Region IX | Region IX | Completed | ₱96.2M | 100% | High risk82 | —-0.019 |
| 24J00027CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF DIPOLOG RIVER FLOOD CONTROL DEVELOPMENT PROJECT, BARANGAY TURNO AND BARRA, DIPOLOG CITY | Region IX | Region IX | On-Going | ₱131.2M | 100% | High risk81 | Flagged0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25J00037PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO - PAGADIAN - ZAMBOANGA CITY RD), K1773+361.00 - K1775+181.00 | Region IX | Region IX | On-Going | ₱107.2M | 31% | High risk96 | Flagged0.040 |
| 22J00052CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO - PAGADIAN - ZAMBOANGA CITY ROAD (S01112MN) | Region IX | Region IX | On-Going | ₱99.8M | 90% | High risk82 | Flagged0.034 |
| 22J00050CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO - PAGADIAN - ZAMBOANGA CITY ROAD (S01112MN) | Region IX | Region IX | On-Going | ₱114.5M | 95% | High risk82 | Flagged0.033 |
| 24J00023CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SINDANGAN-BAYOG-LAKEWOOD ROAD, PACKAGE 1, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱208.2M | 79% | High risk83 | Flagged0.030 |
| 25J00030PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO - PAGADIAN - ZAMBOANGA CITY RD), K1726+098.00 - K1726+253, K1726+253.00 - K1726+298.00, K1749+000.00 - K1749.635.00 | Region IX | Region IX | On-Going | ₱41.7M | 34% | High risk93 | Flagged0.029 |
| 25J00057ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱90.9M | 8% | High risk94 | Flagged0.026 |
| 24J00108REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- PRIMARY ROADS, DIPOLOG- SINDANGAN- LILOY ROAD | Region IX | Region IX | On-Going | ₱145.3M | 91% | High risk83 | Flagged0.025 |
| 23J00106CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL PROJECT, BARANGAY KAHAYAGAN, BAYOG, ZAMBOANGA DEL SUR, PHASE III | Region IX | Region IX | On-Going | ₱114.5M | 92% | High risk82 | Flagged0.024 |
| 24J00126REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - PAGADIAN CITY-ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱79.8M | 63% | High risk80 | Flagged0.022 |
| 23J00040CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BACALAN BR. SECTION (B00497MN), LANAO-PAGADIAN-ZAMBOANGA CITY RD (S01113MN), IPIL, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱100.2M | 97% | High risk83 | Flagged0.021 |
| 25J00069PREVENTIVE MAINTENANCE - PRIMARY ROADS - MAHARLIKA HIGH-WAY (LANAO - PAGADIAN - ZAMBOANGA CITY RD) K1813+842.00-K1814+000.00, K1829+364.00-K1830+300.00, K1830+375.00-K1832+010.00 | Region IX | Region IX | On-Going | ₱88.2M | 26% | High risk94 | Flagged0.020 |
| 25J00239CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SINDANGAN - BAYOG - LAKEWOOD ROAD, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱72M | 24% | High risk94 | Flagged0.017 |
| 25J00058ROAD WIDENING - PRIMARY ROADS MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱43.2M | 15% | High risk93 | Flagged0.016 |
| 24J00027CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF DIPOLOG RIVER FLOOD CONTROL DEVELOPMENT PROJECT, BARANGAY TURNO AND BARRA, DIPOLOG CITY | Region IX | Region IX | On-Going | ₱131.2M | 100% | High risk81 | Flagged0.014 |
| 25J00076ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱52.8M | 33% | High risk94 | Flagged0.013 |
| 21J00070CONSTRUCTION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY - CONSTRUCTION OF COAST GUARD REGIONAL TRAINING CENTER ZAMBOANGA (PHASE 1) | Region IX | Region IX | On-Going | ₱45.8M | 24% | Medium risk58 | Flagged0.011 |
| 17JI0066ASPHALT OVERLAY ALONG JUNCTION IMELDA-ALICIA ROAD, K1751+000-K1751+958.00, K1753+123.00-K1753+323.50, K1754+000.00- K1754+932.00, K1755+940.00-K1756+100.00, K1756+850.00- K1757+000.00, K1757+000.00-K1757+515.00 | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱95.4M | 100% | High risk66 | Flagged0.009 |
| 25J00027CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, PACKAGE 2, BARANGAY STA. BARBARA SECTION, IMELDA, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱153.6M | 71% | High risk93 | Flagged0.009 |
| 25J00228CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIPOLOG RIVER, BARANGAY DICAYAS, DIPOLOG CITY, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱173.3M | 84% | High risk93 | Flagged0.006 |
| 25JC0055ROAD WIDENING - DIPOLOG-SINDANGAN-LILOY RD -K1861+760 - K1863+660 | Region IX | Zamboanga del Norte 2nd DEO | On-Going | ₱103.9M | 84% | High risk94 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 18JI0045CONSTRUCTION OF FLOOD CONTROL STRUCTURE (BOULEVAARD) ALONG SIBUGUEY RIVER, IMELDA, ZAMBOANGA SIBUGAY (SECTION 1: STA. 00+000 - STA. 00+360 AND SECTION 2: STA. 00+000 - STA. 00+064) | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱26.4M | 100% | Medium risk52 | —-0.075 |
| 177 | 23JG0006CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BUUG - BAYOG DIVERSION ROAD, BAYOG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱9.8M | 100% | Medium risk52 | —-0.085 |
| 178 | 21JI0082CONCRETING OF LOCAL ROAD FROM BRGY. LABRADOR-POBLACION PHASE 2, BUUG, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱9.7M | 100% | Medium risk52 | —-0.086 |
| 179 | 21JI0083CONCRETING OF LOCAL ROAD FROM BRGY. LABRADOR-TALAMIMI PHASE 2, BUUG, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱9.8M | 100% | Medium risk52 | —-0.086 |
| 180 | 21JI0031CONSTRUCTION/IMPROVEMENT OF MULTI-PURPOSE BUILDING (INTEGRATED BUS TERMINAL), IMELDA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱22.4M | 100% | Medium risk52 | —-0.072 |
| 181 | 18JI0046CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) ALONG SIBUGUEY RIVER, BALUGO, ZAMBOANGA SIBUGAY (STA. 00+920 - STA. 01+150) | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱25.3M | 100% | Medium risk52 | —-0.074 |
| 182 | 20JI0045CONSTRUCTION OF FLOOD CONTROL STRUCTURES (REVETMENT WALL) ALONG LANAO-PAGADIAN- ZAMBOANGA CITY ROAD, PART OF SIBUGUEY RIVER (DOWNSTREAM), 0000+0000-0000+156, BRGY BALUGO, IMELDA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱19.6M | 100% | Medium risk52 | —-0.074 |
| 183 | 20JI0049REHABILITATION OF FLOOD CONTROL ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD, PART OF SIBUGUEY RIVER (UPSTREAM), STA. 0+191.80 - STA. 0+402.30, BRGY. STA. BARBARA, IMELDA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱24.5M | 100% | Medium risk52 | —-0.074 |
| 184 | 20JI0046REHABILITATION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) ALONG SIBUGUEY RIVER, STA. 0+156 - STA. 0+349 (DOWNSTREAM), BRGY. BALUGO, IMELDA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱24.5M | 100% | Medium risk52 | —-0.074 |
| 185 | 20JI0048CONSTRUCTION OF FLOOD CONTROL STRUCTURES (REVETMENT WALL) ALONG SIBUGUEY RIVER (UPSTREAM), STA. 0+000 - STA. 0+191.80, BRGY. STA. BARBARA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱21.4M | 100% | Medium risk52 | —-0.074 |
| 186 | 20JI0047REHABILITATION OF FLOOD CONTROL FOR PREVENTION AND MITIGATION ALONG BARANGAY SAN JOSE POBLACION, IMELDA, PART OF SIBUGUEY RIVER, IMELDA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱19.2M | 100% | Medium risk52 | —-0.074 |
| 187 | 23JG0018ASSET PRESERVATION/PREVENTIVE MAINTENANCE/TERTIARY ROADS ALONG IMELDA-BAYOG-KUMALARANG-LAPUYAN-MARGOSATUBIG RD. - K1717+369 - K1718+109, K1718+279 - K1718+340, BRGY. MAHAYAHAY, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱11M | 100% | Medium risk52 | —-0.086 |
| 188 | 18JF0009CONSTRUCTION OF FLOOD CONTROL PROJECT FROM VETERANS VILLAGE TO DON ANDRES, IPIL, Z.S | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱22.4M | 100% | Medium risk52 | —-0.073 |
| 189 | 21JI0005CONSTRUCTION OF BY-PASS ROADS-NRJ LA DICHA-DANLUGAN DIVERSION ROAD, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱10.7M | 100% | Medium risk51 | —-0.086 |
| 190 | 25J00079PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO-PAGADIAN - ZAMBOANGA CITY RD) K1805+392.00 - K1805+747.00, K1817+101.00 - K1817+264.5 | Region IX | Region IX | On-Going | ₱16.1M | 49% | Medium risk51 | —-0.041 |
| 191 | 19JI0039CONSTRUCTION OF FLOOD CONTROL ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD, PART OF SIBUGUEY RIVER, (STA. 00+412 - STA. 00+450 AND STA. 00+000 - STA. 00+082) (UPSTREAM), BRGY. BALUGO, IMELDA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱9.8M | 100% | Medium risk51 | —-0.068 |
| 192 | 22JI0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) ALONG SIBUGUEY RIVER, BARANGAY SAN JOSE, IMELDA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱9.7M | 100% | Medium risk51 | —-0.073 |
| 193 | 22JI0041REHABILITATION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) ALONG SIBUGUEY RIVER, BARANGAY BALUGO, IMELDA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱9.7M | 100% | Medium risk51 | —-0.074 |
| 194 | 20JG0044PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG PAGADIAN CITY-ZAMBOANGA CITY ROAD, DIPLO, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱9.5M | 100% | Medium risk51 | —-0.083 |
| 195 | 20JF0001PREVENTIVE MAINTENANCE - PRIMARY ROADS - IPIL - LILOY - SINDANGAN ROAD - K1996+000 - K1996+287.00, K1998+000 - K1998+216, K1998+614 - 1999+000 | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱20.2M | 100% | Medium risk51 | —-0.083 |
| 196 | 21JI0019CONST/IMPVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-NATIONAL RD JCT. LEADING TO TALAIRAN FALLS, BUUG, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱7.3M | 100% | Medium risk51 | —-0.085 |
| 197 | 21JB0005REHABILITAION/RECONSTRUCTION OF ROADS WITH SLIPS SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - SINDANGAN-SIAYAN-DUMINGAG-MAHAYAG ROAD (SINDANGAN-SIAYAN SECT) - K1941+098.00 - K1941+177.15 | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱4.8M | 100% | Medium risk51 | —-0.085 |
| 198 | 23JD0036WIDENING OF PERMANENT BRIDGES, PATAWAG BR. (B00534MN) ALONG LILOY-IPIL RD, TAMPILISAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱25.5M | 100% | Medium risk51 | —-0.056 |
| 199 | 22JG0064REPAIR OF BAYOG BRIDGE ABUTMENT ALONG SINDANGAN-BAYOG-LAKEWOOD ROAD, POBLACION, BAYOG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱5.6M | 100% | Medium risk51 | —-0.057 |
| 200 | 22JI0030CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ROAD AT BRGY. FATIMA IN SUPPORT TO COAL INDUSTRY, SEAWEEDS AND COCONUT, LEADING TO PROVINCIAL ROAD AND NATIONAL HIGHWAY IN PAYAO, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱9.7M | 100% | Medium risk51 | —-0.084 |