Opening the dossier…
Opening the dossier…
Contractor dossier
3 projects on file, including joint ventures this contractor is part of.
Total projects
3
Total budget
₱34.6M
Average progress
100.0%
Completion rate
100.0%
Average risk score
24.1
Low risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 3 | ₱34.6M | 24.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 2 | ₱29.6M | 22.8 | 0 | 100.0% |
| Flood Control and Drainage | 1 | ₱4.9M | 26.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 22MF0057CONSTRUCTION OF DRAINAGE CANAL, BRGY. POBLACION, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱4.9M | 100% | Low risk27 | —-0.071 |
| 2 | 22MF0044CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱9.9M | 100% | Low risk26 | —-0.087 |
| 3 | 23MB0146CONSTRUCTION OF MULTI-PURPOSE FACILITIES (COMMUNITY PARK), PUROK DOÑA SOLEDAD, BRGY. LABANGAL, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱19.7M | 100% | Low risk20 | —-0.078 |