Contractor dossier
24 projects on file, including joint ventures this contractor is part of.
Total projects
24
Total budget
₱2.1B
Average progress
76.9%
Completion rate
41.7%
Below 70%
Average risk score
69.7
High risk on average, out of 100
Flagged as unusual
12
50.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 24 | ₱2.1B | 69.7 | 12 | 76.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bridges | 14 | ₱909.1M | 65.6 | 6 | 79.1% |
| Flood Control and Drainage | 5 | ₱699.6M | 75.1 | 3 | 47.8% |
| Roads | 3 | ₱370.4M | 72.8 | 1 | 100.0% |
| OTHER | 2 | ₱133.6M | 80.3 | 2 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 16J00061ROAD UPGRADING (GRAVEL TO CONCRETE) OF ZAMBOANGA CITY BY-PASS ROAD (WEST COAST), CULIANAN - PATALON ROAD, ZAMBOANGA CITY, INCLUDING CONSTRUCTION OF TWO (2) BRIDGES AND APPROACHES (NET LENGTH: 1,405.20 LN.M.) | Region IX | Region IX | Completed | ₱94.1M | 100% | High risk83 | Flagged0.005 |
| 17JA0009NEW CONSTRUCTION OF PERMANENT BRIDGE, BUSUGAN BRIDGE 2 AND ROAD APPROACHES PARALLEL TO EXISTING PERMANENT BRIDGE BUSUGAN BRIDGE (B01164MN), ALONG ZC-LABUAN-LIMPAPA ROAD | Region IX | Zamboanga City 2nd DEO | Completed | ₱39.5M | 100% | High risk78 | Flagged0.000 |
| 22J00076CONSTRUCTION OF DETENTION TANK 2, WATER TREATMENT PLANT FACILITIES WITH FLOODGATE AND PUMPING STATION 2 ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 35% | High risk76 | Flagged0.017 |
| 24J00145SIPAG - FLOOD MITIGATION STRUCTURES - PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF WATER TREATMENT PLANT FACILITY WITH FLOODGATE & PUMPING STATION, CATCHMENT 1 (PHASE 3), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 44% | High risk76 | —-0.002 |
| 23J00055CONSTRUCTION OF DETENTION TANK 2, WATER TREATMENT PLANT FACILITIES WITH FLOODGATE AND PUMPING STATION 2, ZAMBOANGA CITY, CATCHMENT 1 (PHASE II) | Region IX | Region IX | On-Going | ₱115.6M | 60% | High risk75 | Flagged0.001 |
| 24J00144SIPAG - FLOOD MITIGATION STRUCTURES - PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF WATER TREATMENT PLANT FACILITY WITH FLOODGATE & PUMPING STATION, CATCHMENT 1 (PHASE 2), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱96.4M | 0% | High risk75 | Flagged0.005 |
| 22J00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 3, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱94.6M | 19% | High risk75 | Flagged0.031 |
| 18J00009CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - FLOOD CONTROL FOR URBAN CORE AND CENTRAL DISTRICT OF ZAMBOANGA CITY TO INCLUDE PUMPING STATION AND RROW, ZAMBOANGA CITY (PACKAGE II) | Region IX | Region IX | Completed | ₱198.4M | 100% | High risk74 | —-0.007 |
| 20J00159CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE), UPPER LA PAZ, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱167.4M | 100% | High risk74 | Flagged0.005 |
| 22J00073WIDENING OF PERMANENT BRIDGES - WIDENING OF SAN RAMON BRIDGE INCLUDING APPROACHES, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱96.8M | 65% | High risk74 | Flagged0.012 |
| 23J00072CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 5, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱101.1M | 83% | High risk73 | Flagged0.003 |
| 21J00046CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE), UPPER LA PAZ, ZAMBOANGA CITY, PACKAGE III | Region IX | Region IX | On-Going | ₱111.3M | 100% | High risk73 | —-0.011 |
| 17J00037WIDENING OF SAN RAMON BRIDGE 2 (B01162MN) ALONG ZAMBOANGA CITY - LABUAN - LIMPAPA ROAD, P00117212MN, ZAMBOANGA CITY, BEG. OF PROJ. 1959+840.00, ABUTMENT A 1959+852.58, ABUTMENT B 1959+944.92, END OF PROJ. 1959+960.00, APPROACHES NET LENGTH: 27.66 LN.M., | Region IX | Region IX | Completed | ₱95.5M | 100% | High risk72 | —-0.022 |
| 18J00016CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG COASTAL BYPASS ROAD (MALA - BOLONG SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱91.7M | 100% | High risk72 | —-0.067 |
| 17J00077WIDENING OF MANICAHAN BRIDGE (B00574MN) ALONG PAGADIAN - ZAMBOANGA CITY ROAD, P00117212MN, ZAMBOANGA CITY, BEG. OF PROJ.: 1915+740.00, ABUTMENT A: 1915+758.00, ABUTMENT B: 1915+848.84, END OF PROJ.: 1915+870.00, APPROACHES NET LENGTH: 39.16 LN.M., BRIDGE | Region IX | Region IX | On-Going | ₱107.6M | 96% | High risk71 | Flagged0.040 |
| 19J00012WIDENING OF PERMANENT BRIDGES - TIGBAO BRIDGE (B00556MN) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD, LICOMO, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱116.8M | 100% | High risk71 | —-0.030 |
| 24J00014CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 8, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱91.2M | 71% | High risk70 | —-0.002 |
| 25J00091CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 9, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱57.8M | 22% | High risk66 | Flagged0.014 |
| 24J00048CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD, PACKAGE 5, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱57.8M | 86% | High risk66 | —-0.013 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17J00077WIDENING OF MANICAHAN BRIDGE (B00574MN) ALONG PAGADIAN - ZAMBOANGA CITY ROAD, P00117212MN, ZAMBOANGA CITY, BEG. OF PROJ.: 1915+740.00, ABUTMENT A: 1915+758.00, ABUTMENT B: 1915+848.84, END OF PROJ.: 1915+870.00, APPROACHES NET LENGTH: 39.16 LN.M., BRIDGE | Region IX | Region IX | On-Going | ₱107.6M | 96% | High risk71 | Flagged0.040 |
| 22J00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 3, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱94.6M | 19% | High risk75 | Flagged0.031 |
| 22J00076CONSTRUCTION OF DETENTION TANK 2, WATER TREATMENT PLANT FACILITIES WITH FLOODGATE AND PUMPING STATION 2 ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 35% | High risk76 | Flagged0.017 |
| 25J00091CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 9, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱57.8M | 22% | High risk66 | Flagged0.014 |
| 22J00073WIDENING OF PERMANENT BRIDGES - WIDENING OF SAN RAMON BRIDGE INCLUDING APPROACHES, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱96.8M | 65% | High risk74 | Flagged0.012 |
| 20J00159CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE), UPPER LA PAZ, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱167.4M | 100% | High risk74 | Flagged0.005 |
| 16J00061ROAD UPGRADING (GRAVEL TO CONCRETE) OF ZAMBOANGA CITY BY-PASS ROAD (WEST COAST), CULIANAN - PATALON ROAD, ZAMBOANGA CITY, INCLUDING CONSTRUCTION OF TWO (2) BRIDGES AND APPROACHES (NET LENGTH: 1,405.20 LN.M.) | Region IX | Region IX | Completed | ₱94.1M | 100% | High risk83 | Flagged0.005 |
| 24J00144SIPAG - FLOOD MITIGATION STRUCTURES - PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF WATER TREATMENT PLANT FACILITY WITH FLOODGATE & PUMPING STATION, CATCHMENT 1 (PHASE 2), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱96.4M | 0% | High risk75 | Flagged0.005 |
| 22J00089REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MANICAHAN BRIDGE (B00574MN) ALONG PAGADIAN CITY-ZAMBOANGA CITY RD (PHASE II), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱28.9M | 66% | Medium risk57 | Flagged0.004 |
| 23J00072CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 5, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱101.1M | 83% | High risk73 | Flagged0.003 |
| 23J00055CONSTRUCTION OF DETENTION TANK 2, WATER TREATMENT PLANT FACILITIES WITH FLOODGATE AND PUMPING STATION 2, ZAMBOANGA CITY, CATCHMENT 1 (PHASE II) | Region IX | Region IX | On-Going | ₱115.6M | 60% | High risk75 | Flagged0.001 |
| 17JA0009NEW CONSTRUCTION OF PERMANENT BRIDGE, BUSUGAN BRIDGE 2 AND ROAD APPROACHES PARALLEL TO EXISTING PERMANENT BRIDGE BUSUGAN BRIDGE (B01164MN), ALONG ZC-LABUAN-LIMPAPA ROAD | Region IX | Zamboanga City 2nd DEO | Completed | ₱39.5M | 100% | High risk78 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 16J00061ROAD UPGRADING (GRAVEL TO CONCRETE) OF ZAMBOANGA CITY BY-PASS ROAD (WEST COAST), CULIANAN - PATALON ROAD, ZAMBOANGA CITY, INCLUDING CONSTRUCTION OF TWO (2) BRIDGES AND APPROACHES (NET LENGTH: 1,405.20 LN.M.) | Region IX | Region IX | Completed | ₱94.1M | 100% | High risk83 | Flagged0.005 |
| 2 | 17JA0009NEW CONSTRUCTION OF PERMANENT BRIDGE, BUSUGAN BRIDGE 2 AND ROAD APPROACHES PARALLEL TO EXISTING PERMANENT BRIDGE BUSUGAN BRIDGE (B01164MN), ALONG ZC-LABUAN-LIMPAPA ROAD | Region IX | Zamboanga City 2nd DEO | Completed | ₱39.5M | 100% | High risk78 | Flagged0.000 |
| 3 | 22J00076CONSTRUCTION OF DETENTION TANK 2, WATER TREATMENT PLANT FACILITIES WITH FLOODGATE AND PUMPING STATION 2 ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 35% | High risk76 | Flagged0.017 |
| 4 | 24J00145SIPAG - FLOOD MITIGATION STRUCTURES - PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF WATER TREATMENT PLANT FACILITY WITH FLOODGATE & PUMPING STATION, CATCHMENT 1 (PHASE 3), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 44% | High risk76 | —-0.002 |
| 5 | 23J00055CONSTRUCTION OF DETENTION TANK 2, WATER TREATMENT PLANT FACILITIES WITH FLOODGATE AND PUMPING STATION 2, ZAMBOANGA CITY, CATCHMENT 1 (PHASE II) | Region IX | Region IX | On-Going | ₱115.6M | 60% | High risk75 | Flagged0.001 |
| 6 | 24J00144SIPAG - FLOOD MITIGATION STRUCTURES - PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF WATER TREATMENT PLANT FACILITY WITH FLOODGATE & PUMPING STATION, CATCHMENT 1 (PHASE 2), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱96.4M | 0% | High risk75 | Flagged0.005 |
| 7 | 22J00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 3, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱94.6M | 19% | High risk75 | Flagged0.031 |
| 8 | 18J00009CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - FLOOD CONTROL FOR URBAN CORE AND CENTRAL DISTRICT OF ZAMBOANGA CITY TO INCLUDE PUMPING STATION AND RROW, ZAMBOANGA CITY (PACKAGE II) | Region IX | Region IX | Completed | ₱198.4M | 100% | High risk74 | —-0.007 |
| 9 | 20J00159CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE), UPPER LA PAZ, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱167.4M | 100% | High risk74 | Flagged0.005 |
| 10 | 22J00073WIDENING OF PERMANENT BRIDGES - WIDENING OF SAN RAMON BRIDGE INCLUDING APPROACHES, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱96.8M | 65% | High risk74 | Flagged0.012 |
| 11 | 23J00072CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 5, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱101.1M | 83% | High risk73 | Flagged0.003 |
| 12 | 21J00046CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE), UPPER LA PAZ, ZAMBOANGA CITY, PACKAGE III | Region IX | Region IX | On-Going | ₱111.3M | 100% | High risk73 | —-0.011 |
| 13 | 17J00037WIDENING OF SAN RAMON BRIDGE 2 (B01162MN) ALONG ZAMBOANGA CITY - LABUAN - LIMPAPA ROAD, P00117212MN, ZAMBOANGA CITY, BEG. OF PROJ. 1959+840.00, ABUTMENT A 1959+852.58, ABUTMENT B 1959+944.92, END OF PROJ. 1959+960.00, APPROACHES NET LENGTH: 27.66 LN.M., | Region IX | Region IX | Completed | ₱95.5M | 100% | High risk72 | —-0.022 |
| 14 | 18J00016CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG COASTAL BYPASS ROAD (MALA - BOLONG SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱91.7M | 100% | High risk72 | —-0.067 |
| 15 | 17J00077WIDENING OF MANICAHAN BRIDGE (B00574MN) ALONG PAGADIAN - ZAMBOANGA CITY ROAD, P00117212MN, ZAMBOANGA CITY, BEG. OF PROJ.: 1915+740.00, ABUTMENT A: 1915+758.00, ABUTMENT B: 1915+848.84, END OF PROJ.: 1915+870.00, APPROACHES NET LENGTH: 39.16 LN.M., BRIDGE | Region IX | Region IX | On-Going | ₱107.6M | 96% | High risk71 | Flagged0.040 |
| 16 | 19J00012WIDENING OF PERMANENT BRIDGES - TIGBAO BRIDGE (B00556MN) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD, LICOMO, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱116.8M | 100% | High risk71 | —-0.030 |
| 17 | 24J00014CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 8, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱91.2M | 71% | High risk70 | —-0.002 |
| 18 | 25J00091CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 9, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱57.8M | 22% | High risk66 | Flagged0.014 |
| 19 | 24J00048CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD, PACKAGE 5, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱57.8M | 86% | High risk66 | —-0.013 |
| 20 | 22J00089REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MANICAHAN BRIDGE (B00574MN) ALONG PAGADIAN CITY-ZAMBOANGA CITY RD (PHASE II), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱28.9M | 66% | Medium risk57 | Flagged0.004 |
| 21 | 20JA0006RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - SINUNUC BR. (NEW) (B01771MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA RD | Region IX | Zamboanga City 2nd DEO | Completed | ₱15.4M | 100% | Medium risk57 | —-0.055 |
| 22 | 17JA0010WIDENING OF PERMANENT BRIDGE - TARLING BRIDGE (B01165MN) ALONG ZAMBOANGA CITY - LABUAN - LIMPAPA ROAD | Region IX | Zamboanga City 2nd DEO | Completed | ₱13.8M | 100% | Medium risk56 | —-0.012 |
| 23 | 18JA0008WIDENING OF PERMANENT BRIDGE PATALON BRIDGE 1 (B01167MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD | Region IX | Zamboanga City 2nd DEO | Completed | ₱17.1M | 100% | Medium risk55 | —-0.033 |
| 24 | 18JA0007WIDENING OF PERMANENT BRIDGE MILUAO BR. (B01166MN) ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD | Region IX | Zamboanga City 2nd DEO | Completed | ₱14.6M | 100% | Medium risk55 | —-0.014 |