Opening the dossier…
Opening the dossier…
Contractor dossier
170 projects on file, including joint ventures this contractor is part of.
Total projects
170
Total budget
₱6.8B
Average progress
78.3%
Completion rate
66.5%
Below 70%
Average risk score
50.5
Medium risk on average, out of 100
Flagged as unusual
24
14.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 170 | ₱6.8B | 50.5 | 24 | 78.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 99 | ₱3.7B | 46.2 | 3 | 80.5% |
| Bridges | 25 | ₱779.4M | 46.6 | 5 | 74.3% |
| Flood Control and Drainage | 20 | ₱1.3B | 54.5 | 4 | 80.4% |
| Buildings and Facilities | 7 | ₱154M | 50.2 | 0 | 63.4% |
| OTHER | 6 | ₱243.8M | 73.8 | 5 | 81.0% |
| GAA 2025 OO-1 | 3 | ₱129.2M | 91.6 | 3 | 57.0% |
| GAA 2025 SSP | 3 | ₱56.5M | 88.4 | 2 | 63.0% |
| Water Provision and Storage | 3 | ₱53.7M | 38.0 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱188M | 92.1 | 2 | 41.5% |
| Bridges, Roads | 2 | ₱259.3M | 61.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AH0092INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES(ROADWAY LIGHTING)ALONG PANG.-ZAM.RD.-K0358+(-910) | Region I | Pangasinan 2nd DEO | On-Going | ₱48.1M | 89% | High risk95 | Flagged0.017 |
| 25AH0098CONSTRUCTION OF DRAINAGE STRUCTURE,BARANGAY BAAY, LINGAYEN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱4.8M | 0% | High risk95 | Flagged0.041 |
| 25AH0088CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG AGNO RIVER,BRGY. PANGAPISAN NORTE TO BRGY. POBL | Region I | Pangasinan 2nd DEO | On-Going | ₱93.4M | 0% | High risk93 | Flagged0.022 |
| 25AH0081WIDENING OF PERMANENT BRIDGES AT GODOY BR.(B00672LZ) ALONG PANGASINAN-TARLAC RD.(PHASE II),MANGATARE | Region I | Pangasinan 2nd DEO | On-Going | ₱48M | 63% | High risk93 | Flagged0.009 |
| 25AH0089CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG AGNO RIVER BASIN,BARANGAY BUNLALACAO,MANGATAREM | Region I | Pangasinan 2nd DEO | On-Going | ₱94.6M | 83% | High risk92 | Flagged0.000 |
| 25AH0084WIDENING OF PERMANENT BRIDGES AT CURAMBENG BR.(B02147LZ)ALONG PANGASINAN-ZAMBALES RD.(PHASE II),BINM | Region I | Pangasinan 2nd DEO | On-Going | ₱42.8M | 71% | High risk91 | Flagged0.006 |
| 25AH0082WIDENING OF PERMANENT BRIDGES AT CARPIO BR.(B00674LZ)ALONG PANGASINAN-TARLAC RD.(PHASE II),MANGATARE | Region I | Pangasinan 2nd DEO | On-Going | ₱38.4M | 37% | High risk91 | Flagged0.014 |
| 24AH0165CONST'N. OF FOUR(4) STOREY,TWENTY FOUR(24) CL, S/B. AT MANGATAREM 1 CENTRAL SCHOOL,MANGATAREM, PANGA | Region I | Pangasinan 2nd DEO | On-Going | ₱71.6M | 84% | High risk88 | Flagged0.052 |
| 23A00151CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LINGAYEN-BINMALEY BYPASS ROAD, BINMALEY SIDE, PANGASINAN | Region I | Region I | On-Going | ₱100.4M | 50% | High risk79 | Flagged0.034 |
| 25AH0093INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES(OFF-CARRIAGEWAY IMPRV'T.PAVEMENT MARKINGS,ROAD SI | Region I | Pangasinan 2nd DEO | Completed | ₱3.6M | 100% | High risk75 | —-0.021 |
| 23AH0082CONSTRUCTION (CONCRETING) OF ROAD, BRGY. CALOOCAN NORTE, BINMALEY, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱9.9M | 100% | High risk74 | Flagged0.003 |
| 24AH0131CONSTRUCTION(COMPLETION)OF MPB,MANGATAREM CENTRAL SCHOOL BLDG.MANGATAREM, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱39.6M | 100% | High risk73 | —-0.004 |
| 24AH0085CONST'N./IMPROV'T.OF ACCESS RD.LEADING TO MANIBOC-PANGAPISAN NORTH RD.CONNECTING ALVEAR ST.(PROV'L.R | Region I | Pangasinan 2nd DEO | On-Going | ₱19M | 52% | High risk72 | Flagged0.018 |
| 17A00044NETWORK DEVELOPMENT - IMPROVEMENT/ WIDENING OF NATIONAL ROADS ALONG URDANETA JCT - DAGUPAN RD, K0197+268 - K0198+960; K0199+320 - K0200+870 | Region I | Region I | Completed | ₱96.4M | 100% | High risk68 | —-0.044 |
| 17A00001NETWORK DEVELOPMENT, IMPROVEMENT/ WIDENING OF NATIONAL ROADS ALONG MANILA NORTH ROAD, K0212+(-490) - K0213+537; K0218+000 - K0218+503; K0218+559 - K0221+085 | Region I | Region I | Completed | ₱144.8M | 100% | High risk68 | —-0.028 |
| 24A00056CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LINGAYEN BYPASS ROAD | Region I | Region I | On-Going | ₱67.1M | 14% | High risk68 | Flagged0.006 |
| 17A00034REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM / HIGHWAY DEVELOPMENT ALONG PANGASINAN - ZAMBALES ROAD, K0 268+(-814) - K0 268+000; K0 271+878 - K0 272+000; K0 274+000 - K0 | Region I | Region I | Completed | ₱57.4M | 100% | High risk68 | —-0.048 |
| 25A00446ROAD WIDENING - TERTIARY ROADS, LINGAYEN-CADRE RD - CHAINAGE 0 - CHAINAGE 549 | Region I | Region I | On-Going | ₱53.3M | 0% | High risk68 | Flagged0.004 |
| 17AJ0045CONSTRUCTION OF PROTECTION WORKS ALONG AGNO RIVER, BRGY. GUELEW, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | High risk67 | —-0.046 |
| 17AJ0041CONSTRUCTION OF PROTECTION WORKS ALONG SINUCALAN RIVER, MINIEN SECTION, STA. BARBARA, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱19M | 100% | High risk65 | —-0.047 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AH0165CONST'N. OF FOUR(4) STOREY,TWENTY FOUR(24) CL, S/B. AT MANGATAREM 1 CENTRAL SCHOOL,MANGATAREM, PANGA | Region I | Pangasinan 2nd DEO | On-Going | ₱71.6M | 84% | High risk88 | Flagged0.052 |
| 25AH0098CONSTRUCTION OF DRAINAGE STRUCTURE,BARANGAY BAAY, LINGAYEN, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱4.8M | 0% | High risk95 | Flagged0.041 |
| 23A00151CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LINGAYEN-BINMALEY BYPASS ROAD, BINMALEY SIDE, PANGASINAN | Region I | Region I | On-Going | ₱100.4M | 50% | High risk79 | Flagged0.034 |
| 25AH0088CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG AGNO RIVER,BRGY. PANGAPISAN NORTE TO BRGY. POBL | Region I | Pangasinan 2nd DEO | On-Going | ₱93.4M | 0% | High risk93 | Flagged0.022 |
| 24AH0085CONST'N./IMPROV'T.OF ACCESS RD.LEADING TO MANIBOC-PANGAPISAN NORTH RD.CONNECTING ALVEAR ST.(PROV'L.R | Region I | Pangasinan 2nd DEO | On-Going | ₱19M | 52% | High risk72 | Flagged0.018 |
| 24A00363SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF BRIDGE CONNECTING BARANGAY PANGAPISAN NORTH AND BARANGAY CAPANDANAN, LINGAYEN, PANGASINAN | Region I | Region I | On-Going | ₱93.6M | 0% | High risk62 | Flagged0.017 |
| 25AH0092INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES(ROADWAY LIGHTING)ALONG PANG.-ZAM.RD.-K0358+(-910) | Region I | Pangasinan 2nd DEO | On-Going | ₱48.1M | 89% | High risk95 | Flagged0.017 |
| 23A00325CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION FACILITIES AT MANGATAREM, PANGASINAN | Region I | Region I | On-Going | ₱107.8M | 0% | High risk62 | Flagged0.014 |
| 25AH0082WIDENING OF PERMANENT BRIDGES AT CARPIO BR.(B00674LZ)ALONG PANGASINAN-TARLAC RD.(PHASE II),MANGATARE | Region I | Pangasinan 2nd DEO | On-Going | ₱38.4M | 37% | High risk91 | Flagged0.014 |
| 25AH0081WIDENING OF PERMANENT BRIDGES AT GODOY BR.(B00672LZ) ALONG PANGASINAN-TARLAC RD.(PHASE II),MANGATARE | Region I | Pangasinan 2nd DEO | On-Going | ₱48M | 63% | High risk93 | Flagged0.009 |
| 23AH0016ASSET PRESERVATION-CONST'N./UPGRADING/REHAB.OF DRAINAGE ALONG PANG.-TARLAC RD.K0178+315,MANGATAREM,P | Region I | Pangasinan 2nd DEO | On-Going | ₱3.2M | 100% | Medium risk58 | Flagged0.009 |
| 24A00168CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF FLOOD MITIGATION STRUCTURE, LIMAHONG RIVER CHANNEL, PHASE III, LINGAYEN, PANGASINAN | Region I | Region I | On-Going | ₱93.6M | 11% | High risk63 | Flagged0.008 |
| 24AH0155CONCRETING OF BRGY. POLONG FMR, BRGY. POLONG, BUGALLON, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.9M | 95% | Medium risk45 | Flagged0.007 |
| 25AH0084WIDENING OF PERMANENT BRIDGES AT CURAMBENG BR.(B02147LZ)ALONG PANGASINAN-ZAMBALES RD.(PHASE II),BINM | Region I | Pangasinan 2nd DEO | On-Going | ₱42.8M | 71% | High risk91 | Flagged0.006 |
| 23AH0023WIDENING OF PERMANENT BRIDGES AT BONGALON BR.(B02137LZ)ALONG PANG.-ZAM.RD.LABRADOR,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱33.9M | 60% | Medium risk54 | Flagged0.006 |
| 24A00056CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LINGAYEN BYPASS ROAD | Region I | Region I | On-Going | ₱67.1M | 14% | High risk68 | Flagged0.006 |
| 25AH0083WIDENING OF PERMANENT BRIDGES AT BONGALON BR.(B02137LZ)ALONG PANGASINAN-ZAMBALES RD.(PHASE III),LABR | Region I | Pangasinan 2nd DEO | On-Going | ₱27.5M | 0% | Medium risk47 | Flagged0.006 |
| 25A00446ROAD WIDENING - TERTIARY ROADS, LINGAYEN-CADRE RD - CHAINAGE 0 - CHAINAGE 549 | Region I | Region I | On-Going | ₱53.3M | 0% | High risk68 | Flagged0.004 |
| 24AH0120CONSTRUCTION OF BRIDGE, BARANGAY LAWAK LANGKA, MANGATAREM, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱19.1M | 3% | Medium risk47 | Flagged0.003 |
| 23AH0082CONSTRUCTION (CONCRETING) OF ROAD, BRGY. CALOOCAN NORTE, BINMALEY, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱9.9M | 100% | High risk74 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 19AJ0060CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS ON SECONDARY ROADS ALONG CAMILING-WAWA-BAYAMBANG-MALASIQUI-STA. BARBARA ROAD, K0 176+165-K0 177+256, K0 178+052-K0 178+300, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱39.2M | 100% | Medium risk45 | —-0.088 |
| 102 | 25AH0153IMPROVEMENT OF ROADS, BASISTA, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱46M | 15% | Medium risk45 | —-0.027 |
| 103 | 23AJ0013ROAD WIDENING-SECONDARY ROADS ALONG VILLASIS-MALASIQUI-SN CARLOS RD., K0195+484-K0195+577, K0196+405-K0196+924, K0196+960-K0197+465, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱40.9M | 100% | Medium risk45 | —-0.086 |
| 104 | 23AJ0007ROAD WIDENING-SECONDARY ROADS ALONG CAMILING-WAWA-BAYAMBANG-MALASIQUI-STA. BARBARA RD., K0190+932-K0191+130, K0191+260-K0191+804, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱37.2M | 100% | Medium risk45 | —-0.087 |
| 105 | 22AF0006FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, REHABILITATION OF DAMAGED SHORE PROTECTION WORKS (GROINS & BILKHEAD), BRGYS. BALAWARTE, SAN JULIAN WEST, & SAN JULIAN NORTE, AGOO, LU | Region I | La Union 2nd DEO | Completed | ₱44.1M | 100% | Medium risk45 | —-0.070 |
| 106 | 18AG0101CONVERGENCE AND SPECIAL SUPPORT CONST./IMPROV T OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION POBLACION ILIO ILIO ROAD LEADING TO CABONGAOAN BEACH BRGY. ILIO ILIO (ILIW ILIW), BURGOS, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱39.2M | 100% | Medium risk45 | —-0.078 |
| 107 | 24AH0155CONCRETING OF BRGY. POLONG FMR, BRGY. POLONG, BUGALLON, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱14.9M | 95% | Medium risk45 | Flagged0.007 |
| 108 | 24AH0158CONCRETING OF SITIO CALLEPAN, BRGY. BOLAOEN FMR, BRGY. BOLAOEN,BUGALLON, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱14.9M | 100% | Medium risk45 | —-0.032 |
| 109 | 21AG0016CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - ALAMINOS RIVER(POGO SECTION) STA. 011+802 - STA. 012+124, AT ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱36.8M | 100% | Medium risk45 | —-0.063 |
| 110 | 23AH0165CLUSTER NO. I - CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS WATER SUPPLY SYSTEM: 1. CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY HACIENDA, BUGALLON, PANGASINAN; 2. CONS | Region I | Pangasinan 2nd DEO | Completed | ₱39.2M | 100% | Medium risk45 | —-0.037 |
| 111 | 25A00164CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), LINGAYEN BAYWALK TO BINMALEY, PANGASINAN | Region I | Region I | On-Going | ₱28.1M | 2% | Medium risk45 | —-0.022 |
| 112 | 25AH0096INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES(ROADWAY LIGHTING)ALONG BINMALEY-LINGAYEN VIA QUIB | Region I | Pangasinan 2nd DEO | On-Going | ₱20.1M | 100% | Medium risk45 | —-0.057 |
| 113 | 24AH0159CONCRETING OF BRGY. LINOC FMR, BRGY. LINOC, BINMALEY, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱14.9M | 100% | Medium risk45 | —-0.032 |
| 114 | 22AG0022SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. HERMOSA, DASOL, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.063 |
| 115 | 23AJ0032ROAD WIDENING - SECONDARY ROADS ALONG CAMILING-WAWA-BAYAMBANG-MALASIQUI-STA. BARBARA RD., K0198+343 - K0199+277, K0201+240 - K0201+679 | Region I | Pangasinan 4th DEO | Completed | ₱27.1M | 100% | Medium risk45 | —-0.088 |
| 116 | 23AH0014ASSET PRESERVATION-REHAB/RECONSTN/UPGRADING OF DAMAGED PAVED RDS ALONG PANG-TARLAC RD, K0173+842-K01 | Region I | Pangasinan 2nd DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.089 |
| 117 | 24A00173CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), LAGUIT PADILLA ROAD LEADING TO MT. ZION PILGRIM, ECOTOURISM PARKS & BESAY FALLS, BRGY. LAGUIT PADILLA, BUGALLON, PANGASINAN | Region I | Region I | Completed | ₱4.8M | 100% | Medium risk45 | —-0.082 |
| 118 | 23A00162CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - LAGUIT PADILLA ROAD LEADING TO MT. ZION PILGRIM, ECOTOURISM PARKS AND BESAY FALLS, BRGY. LAGUIT PADILLA, BUGALLON, PANGASIN | Region I | Region I | Completed | ₱4.8M | 100% | Medium risk45 | —-0.085 |
| 119 | 21A00034CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO MINOR BASILICA OF OUR LADY OF MANAOAG SHRINE, STA. BARBARA-MAPANDAN TO MANAOAG ROAD, PANGASINAN | Region I | Region I | Completed | ₱19.3M | 100% | Medium risk44 | —-0.089 |
| 120 | 19AJ0011RECONSTRUCTION TO CONCRETE PAVEMENT- ACCESS ROAD LEADING TO MINOR BASILICA OF OUR LADY OF MANAOAG SHRINE, STA. BARBARA-MAPANDAN-MANAOAG ROAD, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱24.1M | 100% | Medium risk44 | —-0.089 |
| 121 | 21A00096CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. SAN MANUEL NORTE, AGOO, LA UNION | Region I | Region I | Completed | ₱23M | 100% | Medium risk44 | —-0.073 |
| 122 | 19AJ0054CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS ON SECONDARY ROADS ALONG VILLASIS-MALASIQUI-SAN CARLOS ROAD, K0 197+000-K0197+640, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱19.2M | 100% | Medium risk44 | —-0.088 |
| 123 | 22A00049CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), BOBONOT-TAMBOBONG ROAD LEADING TO TAMBOBONG BEACH, DASOL, PANGASINAN | Region I | Region I | Completed | ₱26.5M | 100% | Medium risk44 | —-0.080 |
| 124 | 23AG0110CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTORS - CONSTRUCTION OF SOLAR WATER SYSTEM, INFANTA, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.042 |
| 125 | 23AH0140CLUSTER NO. II: 1. CONVERGENCE AND SPECIAL SUPPORT PROGRAM - TRIP - CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO KANDING AND TIMMANGGUYOB FALLS, BRGY. CABALUYAN 2ND-BRGY. CACAOITEN, MANGATAREM, PANGASINAN; 2. BASIC INFRASTRUCTURE PROGRAM - CONSTRUCT | Region I | Pangasinan 2nd DEO | Completed | ₱14.8M | 100% | Medium risk44 | —-0.086 |