90 projects on file, including joint ventures this contractor is part of.
Total projects
90
Total budget
₱2.3B
Average progress
98.9%
Completion rate
93.3%
Average risk score
28.7
Low risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 88 | ₱2.2B | 28.2 | 0 | 98.9% |
| Region XI | 2 | ₱99M | 52.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 38 | ₱921.2M | 28.6 | 0 | 99.6% |
| Flood Control and Drainage | 26 | ₱992.9M | 27.1 | 0 | 99.8% |
| Buildings and Facilities | 19 | ₱146.3M | 17.3 | 0 | 100.0% |
| GAA 2025 OO-2 | 3 | ₱132.2M | 81.8 | 0 | 83.9% |
| GAA 2025 SSP | 1 | ₱4.9M | 82.8 | 0 | 100.0% |
| OTHER | 1 | ₱58.8M | 76.2 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱52.7M | 39.9 | 0 | 71.5% |
| Bridges | 1 | ₱29.4M | 23.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25ME0048CONSTRUCTION OF KALAONG RIVER CONTROL, MAITUM, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱79.5M | 81% | High risk90 | —-0.000 |
| 25MG0097CONSTRUCTION OF MULTI PURPOSE BUILDING (GYMNASIUM) BARANGAY SAN ROQUE SPORTS HUB, KORONADAL CITY | Region XII | South Cotabato 2nd DEO | Completed | ₱4.9M | 100% | High risk83 | —-0.019 |
| 25ME0080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, NEW LA UNION, MAITUM, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱38M | 70% | High risk81 | —-0.002 |
| 22MG0021CLUSTER VII-A.CONSTRUCTION OF DIVERSION CHANNEL PROJECT (CHANNEL 3), KORONADAL CITY, SOUTH COTABATO B.CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOLOK CREEK, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱58.8M | 100% | High risk76 | —-0.031 |
| 25MB0054CONSTRUCTION OF SILUAY RIS PROTECTION WORKS AT DOWNSTREAM AND UPSTREAM OF NIA DIVERSION WORKS, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱14.7M | 100% | High risk73 | —-0.043 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25ME0048CONSTRUCTION OF KALAONG RIVER CONTROL, MAITUM, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱79.5M | 81% | High risk90 | —-0.000 |
| 2 | 25MG0097CONSTRUCTION OF MULTI PURPOSE BUILDING (GYMNASIUM) BARANGAY SAN ROQUE SPORTS HUB, KORONADAL CITY | Region XII | South Cotabato 2nd DEO | Completed | ₱4.9M | 100% | High risk83 | —-0.019 |
| 3 | 25ME0080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, NEW LA UNION, MAITUM, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱38M | 70% | High risk81 | —-0.002 |
| 4 | 22MG0021CLUSTER VII-A.CONSTRUCTION OF DIVERSION CHANNEL PROJECT (CHANNEL 3), KORONADAL CITY, SOUTH COTABATO B.CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOLOK CREEK, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱58.8M | 100% | High risk76 | —-0.031 |
| 5 | 25MB0054CONSTRUCTION OF SILUAY RIS PROTECTION WORKS AT DOWNSTREAM AND UPSTREAM OF NIA DIVERSION WORKS, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱14.7M | 100% | High risk73 | —-0.043 |
| 6 | 24M00223CONSTRUCTIONS OF RIVER BANK PROTECTION WITH ESPLANADE ALONG ALTAYAN RIVER, STA 0+000 - STA 0+200; STA 0+000 - STA 0+160.473, BRGY. PULABATO, PULABATO, TAMPAKAN, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱48.3M | 94% | Medium risk56 | —-0.013 |
| 7 | 24LD0096CONSTRUCTION OF ROAD, PADADA, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱49.5M | 100% | Medium risk52 | —-0.088 |
| 8 | 24LD0098CONSTRUCTION OF ROAD, SULOP, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱49.5M | 100% | Medium risk52 | —-0.088 |
| 9 | 16MG0237CONSTRUCTION OF LINED CANAL ALONG MARBEL-MAKAR CARPENTER HILL SECTION, KORONADAL CITY, SOUTH COTABATO, STA. 1701+000-STA. 1702+000 | Region XII | South Cotabato 2nd DEO | Completed | ₱8M | 100% | Medium risk44 | —-0.054 |
| 10 | 24M00133CONSTRUCTION OF ROAD, STA. 0+000 - STA. 0+209.50, BARANGAY DANLAG, TAMPAKAN, SOUTH COTABATO | Region XII | Region XII | Completed | ₱4.9M | 100% | Medium risk44 | —-0.051 |
| 11 | 23M00153CONSTRUCTION OF MALITUBOG RIVER BANK PROTECTION (UPSTREAM OF MALITUBOG BRIDGE, LEFT BANK) STA. 0+000 - STA. 0+504.663, BARANGAY POBLACION, BANISILAN, COTABATO | Region XII | Region XII | On-Going | ₱66.6M | 100% | Medium risk43 | —-0.027 |
| 12 | 24M00092CONSTRUCTION OF ROAD, STA. 0+000 - STA. 0+333.5, BARANGAY KIARING, BANISILAN, COTABATO | Region XII | Region XII | Completed | ₱9.9M | 100% | Medium risk41 | —-0.057 |
| 13 | 23MB0013CONST/IMP. OF ACCESS RDS LEADING TO TRADES, IND. AND ECON. ZONES (RDS LINKAGES FOR IND. AND TRADE INFRA PROGRAM-ROLL-IT)-POBLACION-SAN-ISIDRO-LIBERTY-PULABATO-PALO RD CONNECT TO HVCC PLANTATION AREAS AND TAMPAKAN PUB MARKET IN SUPPORT OF AGRIBUSINESS IND | Region XII | South Cotabato 1st DEO | On-Going | ₱52.7M | 72% | Medium risk40 | —-0.018 |
| 14 | 21MG0099CLUSTER VII-A.CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, BRGY. PUTI, NORALA, SOUTH COTABATO B.CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, BRGY. PUNONG GRANDE, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱59.7M | 100% | Medium risk35 | —-0.074 |
| 15 | 24MG0098CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-SURALLAH-LAKE SEBU-MAITUM RD-K1762+460-K1762+848,K1762+860-K1762+980,K1763+060-K1763+600,K1764+375-K1764+454,K1764+582-K1764+689,K1764+945-K1765+018,K1766+140-K1766+211,K1766+255-K1766+295,K1766+360-K1766+67 | Region XII | South Cotabato 2nd DEO | Completed | ₱57.9M | 100% | Medium risk33 | —-0.085 |
| 16 | 23MB0059CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - JCT DIGOS - BUAYAN AIRPORT RD - K1652 + 220 - K1653 + 229 | Region XII | South Cotabato 1st DEO | Completed | ₱55.7M | 100% | Medium risk32 | —-0.079 |
| 17 | 23MG0050CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-SURALLAH-LAKE SEBU-MAITUM RD-K1773+338-K1773+498,K1773+877-K1773+986,K1774+200-K1774+372,K1774+442-K1774+708,K1776+000-K1776+148,SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱49M | 100% | Low risk29 | —-0.087 |
| 18 | 23MG0051CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-SURALLAH-LAKE SEBU-MAITUM RD-K1798+125-K1798+235,K1798+438-K1799+060, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱48.9M | 100% | Low risk28 | —-0.087 |
| 19 | 23ME0047REHAB./RECONST. OF ROADS W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG MAITUM-LAKE SEBU ROAD K1778+705-K1778+870, MAITUM, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱49M | 100% | Low risk28 | —-0.083 |
| 20 | 22MG0023CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE AT SPECIFIC LOCATIONS ALONG SURALLAH-LAKE SEBU-MAITUM RD (S00838MN) (KIANTAY SECTION)-CHAINAGE 58460-CHAINAGE 59093 | Region XII | South Cotabato 2nd DEO | Completed | ₱49M | 100% | Low risk28 | —-0.086 |
| 21 | 22MG0033CONSTRUCTION OF RIVERBANK PROTECTION ALONG SAFALL RIVER, BRGY. POBLACION, T'BOLI, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱49.4M | 100% | Low risk27 | —-0.073 |
| 22 | 23MG0048CLUSTER XI-A.CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-SURALLAH-LAKE SEBU-MAITUM RD-K1765+200-K1765+260, SOUTH COTABATO B.CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-SURALLAH-LAKE SEBU-MAITUM RD-K1808+963-K1809+140, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱38.4M | 100% | Low risk27 | —-0.087 |
| 23 | 23MG0052CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-SURALLAH-LAKE SEBU-MAITUM RD-K1799+882-K1800+100,K1801+325-K1801+720, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱37.8M | 100% | Low risk27 | —-0.087 |
| 24 | 23ME0048CONST. OF FLOOD CONTROL STRUCTURE, BRGY. MARIBULAN, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱49.5M | 100% | Low risk27 | —-0.064 |
| 25 | 20MG0152CONSTRUCTION OF CONCRETE ROAD-JCT. (BEN SIDON)-BACDULONG ROAD LEADING TO LAKE SEBU (LAKE SEBU CIRCUMFERENTIAL ROAD), BRGY. BACDULONG, LAKE SEBU, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱35.9M | 100% | Low risk27 | —-0.088 |