Contractor dossier
180 projects on file, including joint ventures this contractor is part of.
Total projects
180
Total budget
₱6.3B
Average progress
94.7%
Completion rate
78.3%
Average risk score
52.8
Medium risk on average, out of 100
Flagged as unusual
22
12.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 176 | ₱6.2B | 53.0 | 22 | 94.6% |
| Region II | 3 | ₱55.1M | 42.0 | 0 | 100.0% |
| Region I | 1 | ₱34.2M | 45.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 97 | ₱4B | 50.9 | 1 | 96.3% |
| Flood Control and Drainage | 35 | ₱1.1B | 50.0 | 5 | 97.5% |
| Buildings and Facilities | 15 | ₱85.7M | 34.0 | 0 | 94.7% |
| OTHER | 11 | ₱621M | 80.4 | 8 | 90.0% |
| Bridges | 11 | ₱58.8M | 42.7 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱42.9M | 94.5 | 4 | 67.6% |
| GAA 2025 OO-1 | 4 | ₱418.9M | 94.1 | 4 | 59.1% |
| GAA 2025 OO-2 | 2 | ₱33.3M | 87.8 | 0 | 87.5% |
| Water Provision and Storage | 1 | ₱994.6K | 18.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PK0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC BUILDINGS/FACILITIES - CONSTRUCTION OF BALBALAN-PINUKPUK ROAD JCT.-BALANT | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱19.5M | 72% | High risk96 | Flagged0.018 |
| 25PK0060BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF (COMPLETION) OF BALBALASANG MULTI-PURPOSE BUILDING, BRGY. BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱14.7M | 27% | High risk96 | Flagged0.026 |
| 25PK0032BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF SALTAN INALANGAN ROAD, BRGY. BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱4.8M | 83% | High risk96 | Flagged0.014 |
| 25PK0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS - TERTIARY ROADS - LUBUAGAN-BATONG BUHAY-ABRA BDRY RD - K0461+854 - K0462+0032, K0464+023 - K0464+123, K0464+211 - K0464+284, K0465+157 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱139.9M | 65% | High risk95 | Flagged0.021 |
| 25PK0016ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONTRUCTION OF MISSING LINKS / NEW ROADS - ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION, KALINGA) GAWAAN BRIDGE | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱120M | 56% | High risk95 | Flagged0.016 |
| 25PK0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS / NEW ROADS: ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION, KALINGA) KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱120.5M | 64% | High risk95 | Flagged0.016 |
| 25PK0021ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS: SECONDARY ROADS - KALINGA-ABRA RD (K0496+850 - K0499+015) | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱38.4M | 52% | High risk93 | Flagged0.007 |
| 25PK0034BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE GYM, BARANGAY BALANTOY (BULO AND BULO-NAWOY), BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱3.8M | 89% | High risk90 | Flagged0.013 |
| 25PK0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAWANG, BALBALAN, KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱23.8M | 83% | High risk88 | —-0.002 |
| 25PL0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE A | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱9.5M | 92% | High risk88 | —-0.004 |
| 24PK0020ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS / NEW ROADS: ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION), KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱97.2M | 96% | High risk83 | Flagged0.017 |
| 23PK0026CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES: CONSTRUCTION OF ABLEG-MOLAYONG-AMDALAO RD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱96M | 100% | High risk82 | —-0.002 |
| 24PL0111ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CUDAL RIVER FLOOD CONTROL MITIGATION STRUCTURE ALONG MAGABANGON BRIDGE, STA. 1+86 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱95.1M | 70% | High risk82 | Flagged0.019 |
| 23PK0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES : CONSTRUCTION OF DAOANGAN-POSWOY-ABABAAN | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱76M | 57% | High risk81 | Flagged0.026 |
| 23PK0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE DEVELOPMENT INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANAT FLOOD CONTROL STRUCTURE, BALBALASANG, BALBAL | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 95% | High risk80 | Flagged0.024 |
| 25PK0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT): BALANTOY-DAO-ANGAN-POSWOY-ABABA-AN ROA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱20.2M | 86% | High risk80 | Flagged0.005 |
| 22PK0030ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE: TERTIARY ROADS - BALBALAN-PINUKPUK RD - K0491+478 - K0491+504, K0492+251 | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱9.9M | 100% | High risk80 | —-0.025 |
| 24PK0008ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF LAPOC RIVER FLOOD CONTROL ST | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱29.4M | 99% | High risk80 | Flagged0.009 |
| 21PK0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, NATIONAL ROAD SYSTEM ALONG KALINGA-ABRA ROAD (BALBALAN SECTION), KO487+ | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱56.6M | 100% | High risk79 | —-0.023 |
| 24PK0056ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS: KALINGA-ABRA ROAD - K0510+877-K0511+477, BALBALAN, KAL | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱19.6M | 100% | High risk79 | Flagged0.003 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PK0060BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF (COMPLETION) OF BALBALASANG MULTI-PURPOSE BUILDING, BRGY. BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱14.7M | 27% | High risk96 | Flagged0.026 |
| 23PK0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES : CONSTRUCTION OF DAOANGAN-POSWOY-ABABAAN | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱76M | 57% | High risk81 | Flagged0.026 |
| 23PK0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE DEVELOPMENT INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANAT FLOOD CONTROL STRUCTURE, BALBALASANG, BALBAL | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 95% | High risk80 | Flagged0.024 |
| 25PK0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS - TERTIARY ROADS - LUBUAGAN-BATONG BUHAY-ABRA BDRY RD - K0461+854 - K0462+0032, K0464+023 - K0464+123, K0464+211 - K0464+284, K0465+157 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱139.9M | 65% | High risk95 | Flagged0.021 |
| 24PL0111ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CUDAL RIVER FLOOD CONTROL MITIGATION STRUCTURE ALONG MAGABANGON BRIDGE, STA. 1+86 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱95.1M | 70% | High risk82 | Flagged0.019 |
| 25PK0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC BUILDINGS/FACILITIES - CONSTRUCTION OF BALBALAN-PINUKPUK ROAD JCT.-BALANT | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱19.5M | 72% | High risk96 | Flagged0.018 |
| 17PL0183AMMACIAN FLOOD CONTROL ALONG CAL-OWAN RIVER, AMMACIAN, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱52M | 100% | Medium risk55 | Flagged0.018 |
| 17PL0184AMMACIAN FLOOD CONTROL ALONG CAL-OWAN RIVER, AMMACIAN, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱57.1M | 100% | Medium risk57 | Flagged0.018 |
| 17PL0181WAGUD FLOOD CONTROL ALONG CAL-OWAN RIVER, BRGY. WAGUD, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱49.7M | 100% | Medium risk55 | Flagged0.018 |
| 17PL0182WAGUD FLOOD CONTROL ALONG CAL-OWAN RIVER | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱48.9M | 100% | Medium risk54 | Flagged0.018 |
| 24PK0020ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS / NEW ROADS: ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION), KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱97.2M | 96% | High risk83 | Flagged0.017 |
| 25PK0016ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONTRUCTION OF MISSING LINKS / NEW ROADS - ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION, KALINGA) GAWAAN BRIDGE | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱120M | 56% | High risk95 | Flagged0.016 |
| 25PK0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS / NEW ROADS: ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION, KALINGA) KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱120.5M | 64% | High risk95 | Flagged0.016 |
| 25PK0032BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF SALTAN INALANGAN ROAD, BRGY. BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱4.8M | 83% | High risk96 | Flagged0.014 |
| 25PK0045CONCRETING OF BRGY. MABACA FMR, BRGY. MABACA, BALBALAN, KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱14.5M | 46% | Medium risk51 | Flagged0.013 |
| 25PK0034BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE GYM, BARANGAY BALANTOY (BULO AND BULO-NAWOY), BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱3.8M | 89% | High risk90 | Flagged0.013 |
| 17PL0211TAGA FLOOD CONTROL ALONG BALBALAN-PINUKPUK ROAD | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱79.3M | 100% | Medium risk58 | Flagged0.012 |
| 24PK0008ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF LAPOC RIVER FLOOD CONTROL ST | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱29.4M | 99% | High risk80 | Flagged0.009 |
| 24PK0071BASIC INFRASTRUCTURE PROGRAM MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱24.5M | 87% | High risk78 | Flagged0.007 |
| 25PK0021ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS: SECONDARY ROADS - KALINGA-ABRA RD (K0496+850 - K0499+015) | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱38.4M | 52% | High risk93 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25PK0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC BUILDINGS/FACILITIES - CONSTRUCTION OF BALBALAN-PINUKPUK ROAD JCT.-BALANT | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱19.5M | 72% | High risk96 | Flagged0.018 |
| 2 | 25PK0060BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF (COMPLETION) OF BALBALASANG MULTI-PURPOSE BUILDING, BRGY. BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱14.7M | 27% | High risk96 | Flagged0.026 |
| 3 | 25PK0032BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF SALTAN INALANGAN ROAD, BRGY. BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱4.8M | 83% | High risk96 | Flagged0.014 |
| 4 | 25PK0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS - TERTIARY ROADS - LUBUAGAN-BATONG BUHAY-ABRA BDRY RD - K0461+854 - K0462+0032, K0464+023 - K0464+123, K0464+211 - K0464+284, K0465+157 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱139.9M | 65% | High risk95 | Flagged0.021 |
| 5 | 25PK0016ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONTRUCTION OF MISSING LINKS / NEW ROADS - ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION, KALINGA) GAWAAN BRIDGE | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱120M | 56% | High risk95 | Flagged0.016 |
| 6 | 25PK0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS / NEW ROADS: ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION, KALINGA) KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱120.5M | 64% | High risk95 | Flagged0.016 |
| 7 | 25PK0021ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS: SECONDARY ROADS - KALINGA-ABRA RD (K0496+850 - K0499+015) | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱38.4M | 52% | High risk93 | Flagged0.007 |
| 8 | 25PK0034BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE GYM, BARANGAY BALANTOY (BULO AND BULO-NAWOY), BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱3.8M | 89% | High risk90 | Flagged0.013 |
| 9 | 25PK0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAWANG, BALBALAN, KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱23.8M | 83% | High risk88 | —-0.002 |
| 10 | 25PL0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE A | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱9.5M | 92% | High risk88 | —-0.004 |
| 11 | 24PK0020ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS / NEW ROADS: ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION), KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱97.2M | 96% | High risk83 | Flagged0.017 |
| 12 | 23PK0026CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES: CONSTRUCTION OF ABLEG-MOLAYONG-AMDALAO RD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱96M | 100% | High risk82 | —-0.002 |
| 13 | 24PL0111ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CUDAL RIVER FLOOD CONTROL MITIGATION STRUCTURE ALONG MAGABANGON BRIDGE, STA. 1+86 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱95.1M | 70% | High risk82 | Flagged0.019 |
| 14 | 23PK0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES : CONSTRUCTION OF DAOANGAN-POSWOY-ABABAAN | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱76M | 57% | High risk81 | Flagged0.026 |
| 15 | 23PK0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE DEVELOPMENT INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANAT FLOOD CONTROL STRUCTURE, BALBALASANG, BALBAL | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 95% | High risk80 | Flagged0.024 |
| 16 | 25PK0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT): BALANTOY-DAO-ANGAN-POSWOY-ABABA-AN ROA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱20.2M | 86% | High risk80 | Flagged0.005 |
| 17 | 22PK0030ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE: TERTIARY ROADS - BALBALAN-PINUKPUK RD - K0491+478 - K0491+504, K0492+251 | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱9.9M | 100% | High risk80 | —-0.025 |
| 18 | 24PK0008ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF LAPOC RIVER FLOOD CONTROL ST | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱29.4M | 99% | High risk80 | Flagged0.009 |
| 19 | 21PK0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, NATIONAL ROAD SYSTEM ALONG KALINGA-ABRA ROAD (BALBALAN SECTION), KO487+ | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱56.6M | 100% | High risk79 | —-0.023 |
| 20 | 24PK0056ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS: KALINGA-ABRA ROAD - K0510+877-K0511+477, BALBALAN, KAL | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱19.6M | 100% | High risk79 | Flagged0.003 |
| 21 | 24PK0071BASIC INFRASTRUCTURE PROGRAM MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱24.5M | 87% | High risk78 | Flagged0.007 |
| 22 | 17PK0016CONSTRUCTION OF BALBALASANG 1 & 2 ALONG SALTAN RIVER | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱9.3M | 100% | High risk65 | —-0.041 |
| 23 | 24P00041CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION (COMPLETION) OF TAPAO FLOOD CONTROL (CALLANGAN -DUCLIGAN), STA.166+200 - STA. 166+641 (R/S), STA. 166+694 - STA. 166+878 (R/S), STA. 166+374 - STA. 166+926(L/S) | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱96.5M | 39% | High risk63 | —-0.006 |
| 24 | 17PK0001ROAD UPGRADING (UNPAVED TO PAVED)BASED ON GRAVEL ROAD STRATEGIES ,TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM4 PROJECT ANALISIS ) (IS) | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱90.6M | 100% | High risk62 | —-0.035 |
| 25 | 24PL0033ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL MITIGATION STRUCTURE ALONG | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱96.5M | 79% | High risk62 | —-0.013 |