Contractor dossier
180 projects on file, including joint ventures this contractor is part of.
Total projects
180
Total budget
₱6.3B
Average progress
94.7%
Completion rate
78.3%
Average risk score
52.8
Medium risk on average, out of 100
Flagged as unusual
22
12.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 176 | ₱6.2B | 53.0 | 22 | 94.6% |
| Region II | 3 | ₱55.1M | 42.0 | 0 | 100.0% |
| Region I | 1 | ₱34.2M | 45.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 97 | ₱4B | 50.9 | 1 | 96.3% |
| Flood Control and Drainage | 35 | ₱1.1B | 50.0 | 5 | 97.5% |
| Buildings and Facilities | 15 | ₱85.7M | 34.0 | 0 | 94.7% |
| OTHER | 11 | ₱621M | 80.4 | 8 | 90.0% |
| Bridges | 11 | ₱58.8M | 42.7 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱42.9M | 94.5 | 4 | 67.6% |
| GAA 2025 OO-1 | 4 | ₱418.9M | 94.1 | 4 | 59.1% |
| GAA 2025 OO-2 | 2 | ₱33.3M | 87.8 | 0 | 87.5% |
| Water Provision and Storage | 1 | ₱994.6K | 18.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PK0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC BUILDINGS/FACILITIES - CONSTRUCTION OF BALBALAN-PINUKPUK ROAD JCT.-BALANT | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱19.5M | 72% | High risk96 | Flagged0.018 |
| 25PK0060BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF (COMPLETION) OF BALBALASANG MULTI-PURPOSE BUILDING, BRGY. BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱14.7M | 27% | High risk96 | Flagged0.026 |
| 25PK0032BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF SALTAN INALANGAN ROAD, BRGY. BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱4.8M | 83% | High risk96 | Flagged0.014 |
| 25PK0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS - TERTIARY ROADS - LUBUAGAN-BATONG BUHAY-ABRA BDRY RD - K0461+854 - K0462+0032, K0464+023 - K0464+123, K0464+211 - K0464+284, K0465+157 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱139.9M | 65% | High risk95 | Flagged0.021 |
| 25PK0016ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONTRUCTION OF MISSING LINKS / NEW ROADS - ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION, KALINGA) GAWAAN BRIDGE | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱120M | 56% | High risk95 | Flagged0.016 |
| 25PK0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS / NEW ROADS: ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION, KALINGA) KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱120.5M | 64% | High risk95 | Flagged0.016 |
| 25PK0021ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS: SECONDARY ROADS - KALINGA-ABRA RD (K0496+850 - K0499+015) | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱38.4M | 52% | High risk93 | Flagged0.007 |
| 25PK0034BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE GYM, BARANGAY BALANTOY (BULO AND BULO-NAWOY), BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱3.8M | 89% | High risk90 | Flagged0.013 |
| 25PK0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAWANG, BALBALAN, KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱23.8M | 83% | High risk88 | —-0.002 |
| 25PL0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE A | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱9.5M | 92% | High risk88 | —-0.004 |
| 24PK0020ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS / NEW ROADS: ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION), KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱97.2M | 96% | High risk83 | Flagged0.017 |
| 23PK0026CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES: CONSTRUCTION OF ABLEG-MOLAYONG-AMDALAO RD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱96M | 100% | High risk82 | —-0.002 |
| 24PL0111ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CUDAL RIVER FLOOD CONTROL MITIGATION STRUCTURE ALONG MAGABANGON BRIDGE, STA. 1+86 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱95.1M | 70% | High risk82 | Flagged0.019 |
| 23PK0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES : CONSTRUCTION OF DAOANGAN-POSWOY-ABABAAN | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱76M | 57% | High risk81 | Flagged0.026 |
| 23PK0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE DEVELOPMENT INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANAT FLOOD CONTROL STRUCTURE, BALBALASANG, BALBAL | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 95% | High risk80 | Flagged0.024 |
| 25PK0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT): BALANTOY-DAO-ANGAN-POSWOY-ABABA-AN ROA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱20.2M | 86% | High risk80 | Flagged0.005 |
| 22PK0030ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE: TERTIARY ROADS - BALBALAN-PINUKPUK RD - K0491+478 - K0491+504, K0492+251 | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱9.9M | 100% | High risk80 | —-0.025 |
| 24PK0008ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF LAPOC RIVER FLOOD CONTROL ST | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱29.4M | 99% | High risk80 | Flagged0.009 |
| 21PK0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, NATIONAL ROAD SYSTEM ALONG KALINGA-ABRA ROAD (BALBALAN SECTION), KO487+ | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱56.6M | 100% | High risk79 | —-0.023 |
| 24PK0056ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS: KALINGA-ABRA ROAD - K0510+877-K0511+477, BALBALAN, KAL | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱19.6M | 100% | High risk79 | Flagged0.003 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PK0060BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF (COMPLETION) OF BALBALASANG MULTI-PURPOSE BUILDING, BRGY. BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱14.7M | 27% | High risk96 | Flagged0.026 |
| 23PK0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES : CONSTRUCTION OF DAOANGAN-POSWOY-ABABAAN | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱76M | 57% | High risk81 | Flagged0.026 |
| 23PK0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE DEVELOPMENT INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANAT FLOOD CONTROL STRUCTURE, BALBALASANG, BALBAL | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱96.5M | 95% | High risk80 | Flagged0.024 |
| 25PK0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS - TERTIARY ROADS - LUBUAGAN-BATONG BUHAY-ABRA BDRY RD - K0461+854 - K0462+0032, K0464+023 - K0464+123, K0464+211 - K0464+284, K0465+157 | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱139.9M | 65% | High risk95 | Flagged0.021 |
| 24PL0111ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CUDAL RIVER FLOOD CONTROL MITIGATION STRUCTURE ALONG MAGABANGON BRIDGE, STA. 1+86 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱95.1M | 70% | High risk82 | Flagged0.019 |
| 25PK0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC BUILDINGS/FACILITIES - CONSTRUCTION OF BALBALAN-PINUKPUK ROAD JCT.-BALANT | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱19.5M | 72% | High risk96 | Flagged0.018 |
| 17PL0183AMMACIAN FLOOD CONTROL ALONG CAL-OWAN RIVER, AMMACIAN, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱52M | 100% | Medium risk55 | Flagged0.018 |
| 17PL0184AMMACIAN FLOOD CONTROL ALONG CAL-OWAN RIVER, AMMACIAN, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱57.1M | 100% | Medium risk57 | Flagged0.018 |
| 17PL0181WAGUD FLOOD CONTROL ALONG CAL-OWAN RIVER, BRGY. WAGUD, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱49.7M | 100% | Medium risk55 | Flagged0.018 |
| 17PL0182WAGUD FLOOD CONTROL ALONG CAL-OWAN RIVER | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱48.9M | 100% | Medium risk54 | Flagged0.018 |
| 24PK0020ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS / NEW ROADS: ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION), KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱97.2M | 96% | High risk83 | Flagged0.017 |
| 25PK0016ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONTRUCTION OF MISSING LINKS / NEW ROADS - ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION, KALINGA) GAWAAN BRIDGE | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱120M | 56% | High risk95 | Flagged0.016 |
| 25PK0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS / NEW ROADS: ABRA-KALINGA-APAYAO ROAD ALONG ACIGA (PINUKPUK)-TAWANG-BUAYA-MABACA (BALBALAN SECTION, KALINGA) KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱120.5M | 64% | High risk95 | Flagged0.016 |
| 25PK0032BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF SALTAN INALANGAN ROAD, BRGY. BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱4.8M | 83% | High risk96 | Flagged0.014 |
| 25PK0045CONCRETING OF BRGY. MABACA FMR, BRGY. MABACA, BALBALAN, KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱14.5M | 46% | Medium risk51 | Flagged0.013 |
| 25PK0034BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE GYM, BARANGAY BALANTOY (BULO AND BULO-NAWOY), BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱3.8M | 89% | High risk90 | Flagged0.013 |
| 17PL0211TAGA FLOOD CONTROL ALONG BALBALAN-PINUKPUK ROAD | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱79.3M | 100% | Medium risk58 | Flagged0.012 |
| 24PK0008ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF LAPOC RIVER FLOOD CONTROL ST | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱29.4M | 99% | High risk80 | Flagged0.009 |
| 24PK0071BASIC INFRASTRUCTURE PROGRAM MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱24.5M | 87% | High risk78 | Flagged0.007 |
| 25PK0021ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS: SECONDARY ROADS - KALINGA-ABRA RD (K0496+850 - K0499+015) | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱38.4M | 52% | High risk93 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 19PK0067CONCRETING OF SITIO DUCLIGAN, BRGY. BALBALASANG FMR, BRGY. BALBALASANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱4.8M | 100% | Medium risk45 | —-0.031 |
| 152 | 19PC0093CONCRETING OF BRGY. TANGLAGAN-BRGY. BUCAROT FMR, BRGY. TANGLAGAN-BRGY. BUCAROT, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱5.7M | 100% | Medium risk45 | —-0.032 |
| 153 | 22BA0027CONSTRUCTION OF FLOOD CONTROL (SHORE PROTECTION) AT SITIO DIPTAN, BRGY. SINAKAN, SABTANG, BATANES | Region II | Batanes DEO | Completed | ₱5M | 100% | Medium risk44 | —-0.059 |
| 154 | 20BA0011REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS; SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD, K0001+586.00-K0002+162.00, SABTANG, BATANES | Region II | Batanes DEO | Completed | ₱33M | 100% | Medium risk41 | —-0.071 |
| 155 | 21BA0054REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS; SAN VICENTE- SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD K0023+003.00-K0023+190.25, SABTANG, BATANES | Region II | Batanes DEO | Completed | ₱17.1M | 100% | Medium risk41 | —-0.066 |
| 156 | 25PL0064ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BACLAS BROOK AND SALTA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱4.7M | 100% | Medium risk39 | —-0.036 |
| 157 | 17PK0017REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH ROAD SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG KALINGA-ABRA ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱3.2M | 100% | Medium risk36 | —-0.048 |
| 158 | 20PL0069REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - CAWCAWAYAN BRIDGE (B04392LZ) ALONG BALBALAN-PINUKPUK ROAD, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱4.3M | 100% | Medium risk34 | —-0.039 |
| 159 | 20PK0007ORGANIZATIONAL OUTCOME: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING /STRENGTHENING /SALENG BR. (BO4382LZ) ALONG KALINGA - ABRA ROAD, BALBALAN, KALINGA /K0485+181 | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱3.8M | 100% | Medium risk31 | —-0.046 |
| 160 | 20PK0013ORGANIZATIONAL OUTCOME: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING /STRENGTHENING /MATACOB BR. (BO4383LZ) ALONG KALINGA-ABRA ROAD, BALBALAN, KALINGA /K0489+1765 | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱3.8M | 100% | Medium risk31 | —-0.046 |
| 161 | 18PK0003ASSET PRESERVATION - PREVENTIVE MAINTENANCE ALONG KALINGA-ABRA ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱4.6M | 100% | Medium risk31 | —-0.069 |
| 162 | 24PK0034BASIC INFRASTRUCTURE PROGRAM MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF PANTIKIAN MULTI-PURPOSE BUILDING, BARANGAY PANTIKIAN, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱3M | 100% | Low risk29 | —-0.043 |
| 163 | 23PK0072BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF BOLO MULTI-PURPOSE BUILDING, BARANGAY BALANTOY, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱2M | 100% | Low risk29 | —-0.077 |
| 164 | 20PL0053REHABILITATION OF NATIONAL ROAD - BULANAO MINI HYDRO - HOSTEL, BULANAO, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱2.9M | 100% | Low risk28 | —-0.080 |
| 165 | 23PK0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGE PAVED ROADS - TERTIARY ROADS BALBALAN-PINUKPUK RD - K0482+000-K0482+087, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱2.8M | 100% | Low risk27 | —-0.080 |
| 166 | 18PK0004ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGE PAVED ROADS ALONG KALINGA-ABRA ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱2.3M | 100% | Low risk27 | —-0.079 |
| 167 | 20PK0042LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE- DRAINAGE/ PROTECTION WORKS: CONSTRUCTION OF BALBALAN CENTRAL SCHOOL DRAINAGE CANAL SYSTEM, SALEGSEG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱2M | 100% | Low risk26 | —-0.065 |
| 168 | 21PK0069LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS IMPROVEMENT OF DAO LOCAL ROAD, BALBALAN PROPER, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱1.9M | 100% | Low risk25 | —-0.078 |
| 169 | 21PK0062LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM IMPROVEMENT OF POBLACION/PANTIKIAN ELEMENTARY SCHOOL LOCAL ROAD, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱1.9M | 100% | Low risk24 | —-0.078 |
| 170 | 18PK0043CONSTRUCTION OF GAANG FOOTBRIDGE | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱951.6K | 100% | Low risk22 | —-0.042 |
| 171 | 20PK0039LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS; REHABILITATION OF TALALANG-TALTAGAN LOCAL ROAD, TALALANG, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱970.7K | 100% | Low risk21 | —-0.080 |
| 172 | 21PK0060ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: COMPLETION OF BALBALAN CENTRAL SCHOOL DRAINAGE SYSTEMS STA.147+900 - STA. | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱1.9M | 100% | Low risk21 | —-0.060 |
| 173 | 18PK0066CONSTRUCTION OF DPWH STANDARD ONE-STOREY TWO CLASSROOM SCHOOL BUILDING WITH ATTACHED C.R., SESEC-AN PRIMARY SCHOOL, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱3.4M | 100% | Low risk20 | —-0.041 |
| 174 | 18PK0065CONSTRUCTION OF DPWH STANDARD ONE-STOREY TWO CLASSROOM SCHOOL BUILDING WITH ATTACHED C.R., PANTIKIAN ELEMENTARY SCHOOL, PANTIKIAN, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱3.4M | 100% | Low risk19 | —-0.040 |
| 175 | 18PK0071CONSTRUCTION OF DPWH STANDARD ONE-STOREY ONE REGULAR WORKSHOP BUILDING, BALBALAN AGRICULTURAL AND INDUSTRIAL SCHOOL, BALBALAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱3.3M | 100% | Low risk19 | —-0.042 |