Opening the dossier…
Opening the dossier…
Contractor dossier
247 projects on file, including joint ventures this contractor is part of.
Total projects
247
Total budget
₱14.7B
Average progress
91.4%
Completion rate
72.5%
Average risk score
56.6
Medium risk on average, out of 100
Flagged as unusual
12
4.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 227 | ₱13.8B | 57.2 | 12 | 91.2% |
| Region IV-A | 20 | ₱910.7M | 49.5 | 0 | 92.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 114 | ₱6.4B | 56.7 | 1 | 88.9% |
| Flood Control and Drainage | 102 | ₱6.9B | 53.3 | 2 | 97.0% |
| Buildings and Facilities | 11 | ₱116.7M | 41.2 | 0 | 100.0% |
| OTHER | 6 | ₱467.5M | 82.4 | 4 | 85.0% |
| GAA 2025 SSP | 5 | ₱323.9M | 95.5 | 4 | 44.1% |
| Water Provision and Storage | 4 | ₱38.8M | 52.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱94.6M | 93.6 | 1 | 62.1% |
| GAA 2025 OO-2 | 2 | ₱176.3M | 91.4 | 0 | 50.9% |
| Bridges, Roads | 1 | ₱232.6M | 72.8 | 0 | 81.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FE0017CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, VENERACION-ODICON, BARANGAY VENERACION, PAMPLONA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱73.5M | 53% | High risk96 | Flagged0.015 |
| 25FE0018CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, VENERACION-ODICON, BARANGAY ODICON, PASACAO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱73.5M | 53% | High risk96 | Flagged0.015 |
| 25FD0007REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG ROLANDO R. ANDAYA HIGHWAY - K0285 + 002 - K0285 + 888, K0285 + 916 - K0286 + 000, DEL GALLEGO, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱49.4M | 89% | High risk96 | —-0.003 |
| 25FE0011CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CALAWAT, PAMPLONA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱63.7M | 12% | High risk95 | Flagged0.026 |
| 25FE0013BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BAGAMELON-CALAWAT ROAD, BARANGAY BAGAMELON, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱63.7M | 12% | High risk95 | Flagged0.026 |
| 25FN0024OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - ALBAY DIVERSION RD - K0449 + 360 - K0450 + 770 | Region V | Camarines Sur 5th DEO | On-Going | ₱48.1M | 98% | High risk94 | —-0.012 |
| 25F00381ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0401+970-K0402+420, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱46.4M | 26% | High risk93 | Flagged0.009 |
| 25FG0073CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (SEAWALL), NATO-SABANG COASTAL ROAD, SAGÑAY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱55.5M | 10% | High risk92 | —-0.000 |
| 25FN0004OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF RIVERBANK PROTECTION/ESPLANADE, BICOL RIVER, BRGY SAN VICENTE OGBON SECTION, NABUA, CAMSUR | Region V | Camarines Sur 5th DEO | On-Going | ₱120.7M | 92% | High risk91 | —-0.014 |
| 24FF0074CONCRETING OF BRGY. BONOT-BRGY. SANTA ROSA FMR,CALABANGA CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱44.3M | 89% | High risk88 | Flagged0.040 |
| 24FN0086CONCRETING OF LOBONG - MANGGA - PAYAK - PALO ROAD PHASE 3 - BRGY. PAYAK - PALO, BATO, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱49.8M | 100% | High risk86 | Flagged0.011 |
| 25FE0004CSSP: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - SAN ISIDRO-BAHAO ROAD LEADING TO BAHAO PORT, LIBMANAN, CAMARINES SUR, PACKAGE C | Region V | Camarines Sur 2nd DEO | On-Going | ₱143.3M | 86% | High risk82 | Flagged0.007 |
| 24F00377CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT)-CONSTRUCTION OF ROAD LEADING TO NEW CAMARIN | Region V | Region V | On-Going | ₱96.5M | 55% | High risk82 | Flagged0.012 |
| 24F00334CLUSTER I-REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: I-I-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG TERTIARY ROADS, NABUA-BALATAN ROAD, CABANBANAN, BALATAN, CAMARINES SUR, K | Region V | Region V | On-Going | ₱79.9M | 96% | High risk79 | —-0.004 |
| 24F00122CLUSTER XII-ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS-XII-I: CATANDUANES CIR RD-K0168+620-K0168+705; | Region V | Region V | On-Going | ₱53.8M | 84% | High risk77 | —-0.003 |
| 24F00134CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN)-IMELDA BOULEVARD, VIRAC, CATANDUANES, VIRAC, CATANDUANES (LONE DISTRICT) | Region V | Region V | On-Going | ₱232.6M | 82% | High risk73 | —-0.015 |
| 16F00143RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR:BARIT RIVER (SAN MIGUEL SECTION),SAN MIGUEL, NABUA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱80.9M | 94% | High risk73 | Flagged0.060 |
| 24F00485REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ALBAY WEST COAST RD-SECONDARY ROAD-K0512+172-K0512+273, LIBON, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱103.8M | 95% | High risk72 | Flagged0.023 |
| 25F00379ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR-ALBAY DIVERSION ROAD, CAMARINES SUR, NABUA AND BATO, CAMARINES SUR (5TH LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱69.8M | 20% | High risk72 | —-0.017 |
| 24F00294ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATIONSTRUCTURES, BARA | Region V | Region V | On-Going | ₱96.5M | 95% | High risk70 | —-0.043 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 16F00143RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR:BARIT RIVER (SAN MIGUEL SECTION),SAN MIGUEL, NABUA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱80.9M | 94% | High risk73 | Flagged0.060 |
| 24FF0074CONCRETING OF BRGY. BONOT-BRGY. SANTA ROSA FMR,CALABANGA CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱44.3M | 89% | High risk88 | Flagged0.040 |
| 25FE0011CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CALAWAT, PAMPLONA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱63.7M | 12% | High risk95 | Flagged0.026 |
| 25FE0013BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BAGAMELON-CALAWAT ROAD, BARANGAY BAGAMELON, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱63.7M | 12% | High risk95 | Flagged0.026 |
| 24F00485REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ALBAY WEST COAST RD-SECONDARY ROAD-K0512+172-K0512+273, LIBON, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱103.8M | 95% | High risk72 | Flagged0.023 |
| 25FE0017CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, VENERACION-ODICON, BARANGAY VENERACION, PAMPLONA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱73.5M | 53% | High risk96 | Flagged0.015 |
| 25FE0018CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, VENERACION-ODICON, BARANGAY ODICON, PASACAO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱73.5M | 53% | High risk96 | Flagged0.015 |
| 24F00377CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT)-CONSTRUCTION OF ROAD LEADING TO NEW CAMARIN | Region V | Region V | On-Going | ₱96.5M | 55% | High risk82 | Flagged0.012 |
| 24FN0086CONCRETING OF LOBONG - MANGGA - PAYAK - PALO ROAD PHASE 3 - BRGY. PAYAK - PALO, BATO, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱49.8M | 100% | High risk86 | Flagged0.011 |
| 25F00381ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0401+970-K0402+420, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱46.4M | 26% | High risk93 | Flagged0.009 |
| 25FE0004CSSP: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - SAN ISIDRO-BAHAO ROAD LEADING TO BAHAO PORT, LIBMANAN, CAMARINES SUR, PACKAGE C | Region V | Camarines Sur 2nd DEO | On-Going | ₱143.3M | 86% | High risk82 | Flagged0.007 |
| 16F00144RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR:BARIT RIVER (STA. BARBARA SECTION),STA. BARBARA, NABUA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱81.7M | 100% | High risk70 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22F00041CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)PASACAO-BALATAN TOURISM COASTAL HIGHWAY, PASACAO, CAMARINES SUR, PACKAGE 3, CAMARINES SUR(2N | Region V | Region V | Completed | ₱144.8M | 100% | High risk68 | —-0.077 |
| 27 | 25F00382REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TERTIARY ROADS, NABUA-BALATAN ROAD, K0490+000.00-K0490+070.00, CABANBANAN, BALATAN, CAMARINES SUR, BALATAN, CAMARINES SUR (5TH LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱35.5M | 53% | High risk68 | —-0.027 |
| 28 | 23F00120OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BATONG PALOWAY, SAN ANDRES, CATANDUANES, SAN ANDRES, C | Region V | Region V | On-Going | ₱111.4M | 97% | High risk67 | —-0.032 |
| 29 | 25F00009CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG MAHARLIKA HIGHWAY-K0476+656-K0476+979, BATO, CAMARINES SUR (5TH LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱14M | 27% | High risk67 | —-0.023 |
| 30 | 25F00049CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K0407+987-K0408+739, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱70.4M | 55% | High risk67 | —-0.019 |
| 31 | 24F00205ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-REHABILITATION OF BICOL RIVER FLOOD CONTROL (DUG | Region V | Region V | Completed | ₱135.1M | 100% | High risk66 | —-0.067 |
| 32 | 24FE0037OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LIBMANAN RIVER (RIGHT SIDE) WITHIN BICOL RIVER BASIN, BARANGAY MA | Region V | Camarines Sur 2nd DEO | Completed | ₱135.1M | 100% | High risk66 | —-0.067 |
| 33 | 24FE0045OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LIBMANAN RIVER (RIGHT SIDE) WITHIN BICOL RIVER BASIN, BARANGAY TA | Region V | Camarines Sur 2nd DEO | Completed | ₱135.1M | 100% | High risk66 | —-0.067 |
| 34 | 25FD0018CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BINAHAN RIVER, BINAHAN PROPER SECTION, RAGAY, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱108.6M | 94% | High risk66 | —-0.045 |
| 35 | 25FD0019CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE, PUROK 7, BARANGAY POBLACION, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱94.6M | 84% | High risk66 | —-0.046 |
| 36 | 23FE0058CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CUT-OFF CHANNEL (DOWNSTREAM) PHASE II, BRGY. IRAYANG SOLONG, MINA | Region V | Camarines Sur 2nd DEO | Completed | ₱120.6M | 100% | High risk66 | —-0.072 |
| 37 | 24FD0039CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SOOC, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱94.3M | 100% | High risk65 | —-0.073 |
| 38 | 23FD0041CONSTRUCTION OF COASTAL ROAD, BRGY. MANGGA, SIPOCOT, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱120.6M | 99% | High risk65 | —-0.049 |
| 39 | 23FD0042CONSTRUCTION OF COASTAL ROAD, BRGY. SAN VICENTE, SIPOCOT, CAMARINES SUR - BRGY. BARCELONITA, CABUSAO, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱120.6M | 99% | High risk65 | —-0.050 |
| 40 | 23F00084OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF AGOS RIVER-BATO-LAKE FLOOD CONTROL, STA. CRUZ-SAN VICENTE, BATO SECTION, BATO, CA | Region V | Region V | Completed | ₱121.1M | 100% | High risk65 | —-0.070 |
| 41 | 25FD0020CONSTRUCTION OF SHORE PROTECTION AND SEAWALL, SITIO SOUTH CENTRO, BARANGAY SAN VICENTE, SIPOCOT, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱94.7M | 89% | High risk65 | —-0.047 |
| 42 | 23FN0039CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - COASTAL ROAD/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSEVATION - CONSTRUCTION OF SHORE PROTECTION AND COASTAL ROAD DEVELOPMENT ALONG CAMANGAHAN, BALATAN, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱96.5M | 100% | High risk65 | —-0.077 |
| 43 | 24FD0038CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG COLACLING RIVER (DOWNSTREAM), BULAWAN JR., LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱94.5M | 100% | High risk65 | —-0.075 |
| 44 | 25FD0074CONSTRUCTION OF ROAD, BARANGAY PALASPAS, DEL GALLEGO, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱94.6M | 42% | High risk65 | —-0.052 |
| 45 | 25FD0066CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG COLACLING RIVER, BRGY. COLACLING, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱95.5M | 89% | High risk65 | —-0.047 |
| 46 | 23F00043OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF PAWILI RIVER FLOOD MITIGATION STRUCTURE(BARANGAY SALVA | Region V | Region V | Completed | ₱121M | 100% | High risk65 | —-0.069 |
| 47 | 24FD0086REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS, ROLANDO R. ANDAYA HIGHWAY, LZ | Region V | Camarines Sur 1st DEO | On-Going | ₱94.1M | 98% | High risk65 | —-0.061 |
| 48 | 23F00052OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-ROLANDO A. ANDAYA HIGHWAY-K0307+032-K0308+000, RAGAY, CAMARINES SUR (1ST LEGISLATIVE DISTRICT) | Region V | Region V | Completed | ₱101M | 100% | High risk65 | —-0.086 |
| 49 | 24FE0030CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CUT-OFF CHANNEL (UPSTREAM), BARANGAY IRAYANG SOLONG, MINALABAC, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱99M | 99% | High risk65 | —-0.042 |
| 50 | 23F00104OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION/IMPROVEMENT OF REVETMENT WALL DOWNSTREAM AT STA. TERESITA RIVER, IRIGA CITY, CAMARI | Region V | Region V | Completed | ₱113.3M | 100% | High risk65 | —-0.074 |