Opening the dossier…
Opening the dossier…
Contractor dossier
247 projects on file, including joint ventures this contractor is part of.
Total projects
247
Total budget
₱14.7B
Average progress
91.4%
Completion rate
72.5%
Average risk score
56.6
Medium risk on average, out of 100
Flagged as unusual
12
4.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 227 | ₱13.8B | 57.2 | 12 | 91.2% |
| Region IV-A | 20 | ₱910.7M | 49.5 | 0 | 92.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 114 | ₱6.4B | 56.7 | 1 | 88.9% |
| Flood Control and Drainage | 102 | ₱6.9B | 53.3 | 2 | 97.0% |
| Buildings and Facilities | 11 | ₱116.7M | 41.2 | 0 | 100.0% |
| OTHER | 6 | ₱467.5M | 82.4 | 4 | 85.0% |
| GAA 2025 SSP | 5 | ₱323.9M | 95.5 | 4 | 44.1% |
| Water Provision and Storage | 4 | ₱38.8M | 52.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱94.6M | 93.6 | 1 | 62.1% |
| GAA 2025 OO-2 | 2 | ₱176.3M | 91.4 | 0 | 50.9% |
| Bridges, Roads | 1 | ₱232.6M | 72.8 | 0 | 81.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FE0017CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, VENERACION-ODICON, BARANGAY VENERACION, PAMPLONA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱73.5M | 53% | High risk96 | Flagged0.015 |
| 25FE0018CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, VENERACION-ODICON, BARANGAY ODICON, PASACAO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱73.5M | 53% | High risk96 | Flagged0.015 |
| 25FD0007REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG ROLANDO R. ANDAYA HIGHWAY - K0285 + 002 - K0285 + 888, K0285 + 916 - K0286 + 000, DEL GALLEGO, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱49.4M | 89% | High risk96 | —-0.003 |
| 25FE0011CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CALAWAT, PAMPLONA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱63.7M | 12% | High risk95 | Flagged0.026 |
| 25FE0013BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BAGAMELON-CALAWAT ROAD, BARANGAY BAGAMELON, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱63.7M | 12% | High risk95 | Flagged0.026 |
| 25FN0024OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - ALBAY DIVERSION RD - K0449 + 360 - K0450 + 770 | Region V | Camarines Sur 5th DEO | On-Going | ₱48.1M | 98% | High risk94 | —-0.012 |
| 25F00381ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0401+970-K0402+420, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱46.4M | 26% | High risk93 | Flagged0.009 |
| 25FG0073CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (SEAWALL), NATO-SABANG COASTAL ROAD, SAGÑAY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱55.5M | 10% | High risk92 | —-0.000 |
| 25FN0004OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF RIVERBANK PROTECTION/ESPLANADE, BICOL RIVER, BRGY SAN VICENTE OGBON SECTION, NABUA, CAMSUR | Region V | Camarines Sur 5th DEO | On-Going | ₱120.7M | 92% | High risk91 | —-0.014 |
| 24FF0074CONCRETING OF BRGY. BONOT-BRGY. SANTA ROSA FMR,CALABANGA CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱44.3M | 89% | High risk88 | Flagged0.040 |
| 24FN0086CONCRETING OF LOBONG - MANGGA - PAYAK - PALO ROAD PHASE 3 - BRGY. PAYAK - PALO, BATO, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱49.8M | 100% | High risk86 | Flagged0.011 |
| 25FE0004CSSP: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - SAN ISIDRO-BAHAO ROAD LEADING TO BAHAO PORT, LIBMANAN, CAMARINES SUR, PACKAGE C | Region V | Camarines Sur 2nd DEO | On-Going | ₱143.3M | 86% | High risk82 | Flagged0.007 |
| 24F00377CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT)-CONSTRUCTION OF ROAD LEADING TO NEW CAMARIN | Region V | Region V | On-Going | ₱96.5M | 55% | High risk82 | Flagged0.012 |
| 24F00334CLUSTER I-REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: I-I-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG TERTIARY ROADS, NABUA-BALATAN ROAD, CABANBANAN, BALATAN, CAMARINES SUR, K | Region V | Region V | On-Going | ₱79.9M | 96% | High risk79 | —-0.004 |
| 24F00122CLUSTER XII-ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS-XII-I: CATANDUANES CIR RD-K0168+620-K0168+705; | Region V | Region V | On-Going | ₱53.8M | 84% | High risk77 | —-0.003 |
| 24F00134CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN)-IMELDA BOULEVARD, VIRAC, CATANDUANES, VIRAC, CATANDUANES (LONE DISTRICT) | Region V | Region V | On-Going | ₱232.6M | 82% | High risk73 | —-0.015 |
| 16F00143RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR:BARIT RIVER (SAN MIGUEL SECTION),SAN MIGUEL, NABUA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱80.9M | 94% | High risk73 | Flagged0.060 |
| 24F00485REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ALBAY WEST COAST RD-SECONDARY ROAD-K0512+172-K0512+273, LIBON, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱103.8M | 95% | High risk72 | Flagged0.023 |
| 25F00379ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR-ALBAY DIVERSION ROAD, CAMARINES SUR, NABUA AND BATO, CAMARINES SUR (5TH LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱69.8M | 20% | High risk72 | —-0.017 |
| 24F00294ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATIONSTRUCTURES, BARA | Region V | Region V | On-Going | ₱96.5M | 95% | High risk70 | —-0.043 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 16F00143RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR:BARIT RIVER (SAN MIGUEL SECTION),SAN MIGUEL, NABUA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱80.9M | 94% | High risk73 | Flagged0.060 |
| 24FF0074CONCRETING OF BRGY. BONOT-BRGY. SANTA ROSA FMR,CALABANGA CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱44.3M | 89% | High risk88 | Flagged0.040 |
| 25FE0011CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CALAWAT, PAMPLONA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱63.7M | 12% | High risk95 | Flagged0.026 |
| 25FE0013BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BAGAMELON-CALAWAT ROAD, BARANGAY BAGAMELON, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱63.7M | 12% | High risk95 | Flagged0.026 |
| 24F00485REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ALBAY WEST COAST RD-SECONDARY ROAD-K0512+172-K0512+273, LIBON, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱103.8M | 95% | High risk72 | Flagged0.023 |
| 25FE0017CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, VENERACION-ODICON, BARANGAY VENERACION, PAMPLONA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱73.5M | 53% | High risk96 | Flagged0.015 |
| 25FE0018CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, VENERACION-ODICON, BARANGAY ODICON, PASACAO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱73.5M | 53% | High risk96 | Flagged0.015 |
| 24F00377CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT)-CONSTRUCTION OF ROAD LEADING TO NEW CAMARIN | Region V | Region V | On-Going | ₱96.5M | 55% | High risk82 | Flagged0.012 |
| 24FN0086CONCRETING OF LOBONG - MANGGA - PAYAK - PALO ROAD PHASE 3 - BRGY. PAYAK - PALO, BATO, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱49.8M | 100% | High risk86 | Flagged0.011 |
| 25F00381ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0401+970-K0402+420, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱46.4M | 26% | High risk93 | Flagged0.009 |
| 25FE0004CSSP: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - SAN ISIDRO-BAHAO ROAD LEADING TO BAHAO PORT, LIBMANAN, CAMARINES SUR, PACKAGE C | Region V | Camarines Sur 2nd DEO | On-Going | ₱143.3M | 86% | High risk82 | Flagged0.007 |
| 16F00144RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR:BARIT RIVER (STA. BARBARA SECTION),STA. BARBARA, NABUA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱81.7M | 100% | High risk70 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 22FE0004002: FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF REVETMENT (ALONG LIBMANAN RIVER) WITHIN BICOL RIVER BASIN, BRGY. PALANGON, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱48M | 100% | Medium risk47 | —-0.087 |
| 202 | 22FE0023OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT (ALONG LIBMANAN RIVER) WITHIN BICOL RIVER BASIN, BRGY. INALAHAN, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱48M | 100% | Medium risk47 | —-0.087 |
| 203 | 22FE0001002: FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF REVETMENT (ALONG LIBMANAN RIVER) WITHIN BICOL RIVER BASIN, BRGY. USON, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱48M | 100% | Medium risk47 | —-0.087 |
| 204 | 21FH0061LOCAL PROGRAM-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF RIVER CONTROL, BARANGAY MABINI (BARRIO PROPER), CARAMORAN, CATANDUANES | Region V | Catanduanes DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.085 |
| 205 | 21FH0056LOCAL PROGRAM-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF RIVER FLOOD CONTROL STRUCTURE, BARANGAY MABINI PROPER, CARAMORAN, CATANDUANES | Region V | Catanduanes DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.082 |
| 206 | 18DB0092NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS ALONG TAGATAY NASUGBU RD K0079+000 - K0079+100, K0081+732 - K0082+000, K0082+500 - K0083+040, K0083+730 - K0083+806 | Region IV-A | Batangas 1st DEO | Completed | ₱42.1M | 100% | Medium risk47 | —-0.105 |
| 207 | 25DB0003ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS - TERNATE-NASUGBU RD - K0094 + 000 - K0095 + 000 | Region IV-A | Batangas 1st DEO | Completed | ₱38.5M | 100% | Medium risk47 | —-0.099 |
| 208 | 24FD0004CONSTRUCTION OF LIBMANAN CABUSAO PIS INTAKE SLOPE PROTECTION,SIPOCOT, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱9.7M | 100% | Medium risk47 | —-0.084 |
| 209 | 18DB0008ASSET PRESERVATION PROGRAM-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS ALONG NASUGBU-LIAN-CALATAGAN RD-K0117+000-K0118+000 | Region IV-A | Batangas 1st DEO | Completed | ₱41M | 100% | Medium risk47 | —-0.102 |
| 210 | 22FE0058CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SAN FERNANDO SPORTS COMPLEX) IN SAN FERNANDO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.099 |
| 211 | 21FH0071LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION OF SEAWALL, BRGY. PANIQUE, CARAMORAN, CATANDUANES | Region V | Catanduanes DEO | Completed | ₱14.8M | 100% | Medium risk47 | —-0.084 |
| 212 | 20FN0059OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/RECONSTRUCTION OF NABUA FLOOD CONTROL DIKE 1ST APPROACH LEFT SIDE UPSTREAM, SAN MIGUEL BRIDGE, NABUA, CS | Region V | Camarines Sur 5th DEO | Completed | ₱46.6M | 100% | Medium risk47 | —-0.088 |
| 213 | 22FG0037CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (SEAWALL) ALONG LAMIT BAY SECTION 1: STA. 0+000 - STA. 0+540.00 OLAS, LAGONOY, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.079 |
| 214 | 20FN0018CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG WARAS RIVER, DIVERSION ROAD-SAN ANTONIO-STA. LUCIA, NABUA, CAMARINES SURRIGHT SIDE: STA. 1+282.00 -STA. 1+454.00LEFT SIDE: STA. 1+282.00 - STA. 1+454.00 | Region V | Camarines Sur 5th DEO | Completed | ₱37.2M | 100% | Medium risk47 | —-0.088 |
| 215 | 23DN0031BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PULONG BANAL (PHASE 2), BARANGAY SAN JOSE, ANTIPOLO CITY, RIZAL (SECOND DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱5.6M | 0% | Medium risk46 | —-0.007 |
| 216 | 19FD0065LIP: FLOOD CONTROL AND DRAINAGE-DRAINAGE/PROTECTION WORKS-CONSTRUCTION OF DRAINAGE STRUCTURES, BRGY. STATION CHURCH SITE, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱12.9M | 100% | Medium risk46 | —-0.087 |
| 217 | 24DB0010ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS- TAGAYTAY-NASUGBU RD - K0073 + 400 - K0073 + 958 | Region IV-A | Batangas 1st DEO | On-Going | ₱17.6M | 55% | Medium risk46 | —-0.054 |
| 218 | 20FE0017OO2: FLOOD MANAGEMENT - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT (ALONG BICOL RIVER) WITHIN BICOL RIVER BASIN, BRGY. ALIMBUYOG, MILAOR, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱45.4M | 100% | Medium risk46 | —-0.087 |
| 219 | 20FE0029OO2:FLOOD MANAGEMENT -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DIKE (ALONG BICOL RIVER) WITHIN BICOL RIVER BASIN, BRGY. SAN JOSE, MINALABAC, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱42.6M | 100% | Medium risk46 | —-0.087 |
| 220 | 21FE0009OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF RIVERWALL ALONG BICOL RIVER WITHIN BICOL RIVER BASIN, BARANGAY ALIMBUYOG, MILAOR, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱33.3M | 100% | Medium risk46 | —-0.088 |
| 221 | 21F00026OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF DIKE (ALONG CUT-OFF CHANNEL) WITHIN BICOL RIVER BASIN | Region V | Region V | Completed | ₱39.8M | 100% | Medium risk46 | —-0.088 |
| 222 | 20FE0022OO2: FLOOD MANAGEMENT - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT (ALONG BICOL RIVER) WITHIN BICOL RIVER BASIN, BRGY. SAN VICENTE, MILAOR, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱42.6M | 100% | Medium risk46 | —-0.088 |
| 223 | 18FD0037CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES/RIVER WALL ALONG BICOL RIVER, BRGY. MALBONG, GAINZA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱38M | 100% | Medium risk46 | —-0.088 |
| 224 | 22DB0002ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- PALICO-BALAYAN-BATANGAS RD - K0099 + 092 - K0100 + 000 | Region IV-A | Batangas 1st DEO | Completed | ₱28M | 100% | Medium risk46 | —-0.101 |
| 225 | 24DB0011ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING - SECONDARY ROADS-NASUGBU-LIAN-CALATAGAN RD - K0108 + 500 - K0109 + 000 | Region IV-A | Batangas 1st DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.103 |