Opening the dossier…
Opening the dossier…
Contractor dossier
133 projects on file, including joint ventures this contractor is part of.
Total projects
133
Total budget
₱7.6B
Average progress
91.0%
Completion rate
78.9%
Average risk score
47.6
Medium risk on average, out of 100
Flagged as unusual
11
8.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 97 | ₱5.6B | 43.9 | 5 | 93.0% |
| Cordillera Administrative Region | 24 | ₱1.1B | 54.8 | 3 | 93.9% |
| Region VII | 7 | ₱541.7M | 68.9 | 3 | 46.6% |
| Region I | 3 | ₱206.5M | 58.4 | 0 | 100.0% |
| Region IV-A | 1 | ₱35.3M | 66.5 | 0 | 100.0% |
| Region IV-B | 1 | ₱46.2M | 37.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 72 | ₱4.7B | 46.0 | 0 | 95.1% |
| Flood Control and Drainage | 21 | ₱1.1B | 38.4 | 1 | 96.1% |
| Buildings and Facilities | 16 | ₱673.7M | 41.6 | 0 | 93.6% |
| Bridges | 11 | ₱272M | 35.0 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱294M | 94.9 | 4 | 24.2% |
| GAA 2025 OO-2 | 4 | ₱294M | 91.2 | 2 | 54.4% |
| OTHER | 3 | ₱148.1M | 79.1 | 2 | 77.2% |
| GAA 2025 OO-1 | 2 | ₱151.2M | 94.2 | 2 | 43.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0246CONSTRUCTION OF CRUZ - CALIBUNGAN DIVERSION ROAD (SEGMENT 5), VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.4M | 39% | High risk95 | Flagged0.023 |
| 25CJ0242CONSTRUCTION OF SAN MANUEL - BALETE DIVERSION ROAD (SEGMENT 2), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.5M | 4% | High risk95 | Flagged0.034 |
| 25CJ0307CONSTRUCTION (COMPLETION) OF TARLAC CITY GENERAL HOSPITAL, TARLAC | Region III | Tarlac DEO | On-Going | ₱78.5M | 26% | High risk95 | Flagged0.029 |
| 25HB0003ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS LOAY INTERIOR RD - K0172 + 022 - K0173 + 133, K0174 + 240 - K0175 + 164 | Region VII | Bohol 3rd DEO | On-Going | ₱54.7M | 58% | High risk94 | Flagged0.012 |
| 25CJ0154CONSTRUCTION OF ROAD AT BACULONG ECOZONE AREA (PHASE 2), VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱24.5M | 28% | High risk94 | Flagged0.019 |
| 25CJ0051CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MANILA NORTH ROAD TO TARLAC SN MIGUEL VIA MACABULOS ROAD, TARLAC PHASE 1, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 29% | High risk94 | Flagged0.016 |
| 25H00108OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE, WAHIG RIVER, STA. 0 + 470.00 - STA. 0 + 944.60, PAMACSALAN AREA, | Region VII | Region VII | On-Going | ₱85.1M | 13% | High risk92 | Flagged0.011 |
| 25H00107OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE, CASBU RIVER, STA. 0 + 385.00 - STA. 0 + 784.30, CANDIJAY, BOHOL | Region VII | Region VII | On-Going | ₱85.1M | 20% | High risk92 | Flagged0.007 |
| 25CJ0098CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SAN ISIDRO CREEK (PHASE 5), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱74.3M | 84% | High risk91 | —-0.018 |
| 25CJ0092CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG TARLAC RIVER CONTROL RIGHT DIKE, SAN NICOLAS - SAN. CRUZ SECTION (SEGMENT 11), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱49.5M | 100% | High risk90 | —-0.022 |
| 18PK0081CONCRETING AND IMPROVEMENT OF BALINCIAGAO-AMDALAO ROAD WITH BRIDGE | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱48.5M | 100% | High risk88 | Flagged0.038 |
| 25CK0103REHABILITATION OF EARTH SLOPE DIKE, UPSTREAM OF BANGOT BRIDGE - BANGUT RIVER LEFT SIDE (SEGMENT E), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 97% | High risk80 | —-0.023 |
| 24PK0082LOCAL PROGRAM (LP) BUILDINGS AND OTHER INFRASTRUCTURES - MULTIPURPOSE / FACILITIES NATIONAL BUILDING PROGRAM CONSTRUCTION (COMPLETION) OF DPWH UPPER KALINGA DISTRICT ENGINEERING OFFICE BUILDING, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱34.3M | 32% | High risk79 | Flagged0.018 |
| 21CA0060CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) - CONSTRUCTION OF ABUCAY MUNICIPAL POLICE STATION BUILDI | Region III | Bataan 1st DEO | Completed | ₱56.2M | 100% | High risk77 | —-0.063 |
| 20CJ0070NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS STA. IGNACIA - GUIMBA ROAD VIA GERONA PURA, (STA. IGNACIA SECTION), PACKAGE 2, TARLAC | Region III | Tarlac DEO | Completed | ₱65.3M | 100% | High risk70 | —-0.035 |
| 17DO0020MFO1-NATIONAL ROADS-NETWORK SERVICES-NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY ROADS-RODRIGUEZ SAN JOSE ROAD (SO4225LZ)-K0031+-251 - K0032+345 RODRIGUEZ RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱35.3M | 100% | High risk67 | —-0.072 |
| 17A00019CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-WIDENING (1-LANE) OF AMBAYAOAN BRIDGE, ALONG SAN NICOLAS-SAN MANUEL ROAD, PANGASINAN | Region I | Region I | Completed | ₱83M | 100% | High risk64 | —-0.017 |
| 17CE0047CONSTRUCTION OF BY-PASSES/DIVERSION ROADS INCLUDING ROW, GUIMBA-TALUGTUG-UMINGAN ROAD, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱46.5M | 100% | High risk64 | —-0.063 |
| 17A00028CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - WIDENING OF PERMANENT BRIDGE TO MORE THAN TWO (2) LANES, TAGAMUSING BRIDGE (B00728LZ) ALONG MANILA NORTH ROAD (PHASE II) | Region I | Region I | Completed | ₱77M | 100% | High risk64 | —-0.022 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18PK0081CONCRETING AND IMPROVEMENT OF BALINCIAGAO-AMDALAO ROAD WITH BRIDGE | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱48.5M | 100% | High risk88 | Flagged0.038 |
| 25CJ0242CONSTRUCTION OF SAN MANUEL - BALETE DIVERSION ROAD (SEGMENT 2), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.5M | 4% | High risk95 | Flagged0.034 |
| 25CJ0307CONSTRUCTION (COMPLETION) OF TARLAC CITY GENERAL HOSPITAL, TARLAC | Region III | Tarlac DEO | On-Going | ₱78.5M | 26% | High risk95 | Flagged0.029 |
| 25CJ0246CONSTRUCTION OF CRUZ - CALIBUNGAN DIVERSION ROAD (SEGMENT 5), VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.4M | 39% | High risk95 | Flagged0.023 |
| 25CJ0154CONSTRUCTION OF ROAD AT BACULONG ECOZONE AREA (PHASE 2), VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱24.5M | 28% | High risk94 | Flagged0.019 |
| 24PK0082LOCAL PROGRAM (LP) BUILDINGS AND OTHER INFRASTRUCTURES - MULTIPURPOSE / FACILITIES NATIONAL BUILDING PROGRAM CONSTRUCTION (COMPLETION) OF DPWH UPPER KALINGA DISTRICT ENGINEERING OFFICE BUILDING, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱34.3M | 32% | High risk79 | Flagged0.018 |
| 25CJ0051CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MANILA NORTH ROAD TO TARLAC SN MIGUEL VIA MACABULOS ROAD, TARLAC PHASE 1, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 29% | High risk94 | Flagged0.016 |
| 17PL0236PACKAGE 10: A) TALOCTOC FLOOD CONTROL ALONG TANUDAN RIVER, TANUDAN, B) ALINANAG FLOOD CONTROL ALONG MANGLIG RIVER, TABUK CITY, C) CUDAL FLOOD CONTROL ALONG MANGLIG RIVER, TABUK CITY, D) LAY-ASAN FLOOD CONTROL, TANUDAN | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱58M | 100% | Medium risk58 | Flagged0.012 |
| 25HB0003ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS LOAY INTERIOR RD - K0172 + 022 - K0173 + 133, K0174 + 240 - K0175 + 164 | Region VII | Bohol 3rd DEO | On-Going | ₱54.7M | 58% | High risk94 | Flagged0.012 |
| 25H00108OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE, WAHIG RIVER, STA. 0 + 470.00 - STA. 0 + 944.60, PAMACSALAN AREA, | Region VII | Region VII | On-Going | ₱85.1M | 13% | High risk92 | Flagged0.011 |
| 25H00107OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE, CASBU RIVER, STA. 0 + 385.00 - STA. 0 + 784.30, CANDIJAY, BOHOL | Region VII | Region VII | On-Going | ₱85.1M | 20% | High risk92 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 20PK0032ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS: SECONDARY ROADS KALINGA-ABRA ROAD - K0466+308-K0466+350, K0467+1142-K0467+165, K0467+1504-K0467+1674, K0467+1694-K0467+1764, K0 | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱59.3M | 100% | Medium risk54 | —-0.076 |
| 27 | 25CJ0272CONSTRUCTION OF ACCESS ROAD LEADING TO TPLEX (PHASE 5), ANAO, TARLAC | Region III | Tarlac DEO | On-Going | ₱139.8M | 24% | Medium risk54 | —-0.026 |
| 28 | 19PL0064ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-KALINGA CAGAYAN ROAD (CALANAN-ENRILE SECTION), TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱52.1M | 100% | Medium risk53 | —-0.078 |
| 29 | 21PL0024NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS ALONG MT. PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CALANAN-PINUKPUK SECTION), K0497+313-K0498+060, K0498+084-K0499+000, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱47.2M | 100% | Medium risk53 | —-0.079 |
| 30 | 22CJ0122NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MONCADA-SAN MANUEL BYPASS ROAD, TARLAC | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | Medium risk53 | —-0.083 |
| 31 | 25CJ0134CONSTRUCTION OF CAMILING MULTI-PURPOSE BUILDING (PHASE 2), CAMILING, TARLAC | Region III | Tarlac DEO | On-Going | ₱98M | 84% | Medium risk53 | —-0.044 |
| 32 | 25CJ0285CONSTRUCTION OF MULTI-PURPOSE BUILDING (CAMILING PUBLIC MARKET), CAMILING, TARLAC (PACKAGE C) | Region III | Tarlac DEO | On-Going | ₱97.8M | 15% | Medium risk52 | —-0.020 |
| 33 | 25H00109OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE, STA. 1 + 190.41 - STA. 1 + 507.10 (UPSTREAM), BRGY.MANABA,GARCIA | Region VII | Region VII | On-Going | ₱85.1M | 52% | Medium risk52 | —-0.021 |
| 34 | 22CL0078CONCRETING OF BRGY. MANGLICMOT TO BRGY. BALINCAGUING, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | Medium risk52 | —-0.082 |
| 35 | 25CJ0247CONSTRUCTION OF CRUZ - CALIBUNGAN DIVERSION ROAD (SEGMENT 6), VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.3M | 24% | Medium risk52 | —-0.040 |
| 36 | 20CA0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS -STA. ISABEL-SAN RAMON DIVERSION ROAD, DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱96.5M | 100% | Medium risk52 | —-0.082 |
| 37 | 24CJ0349REPAIR/REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG CADAANAN CREEK, SAN JOSE SOUTH SECTION, ANAO, TARLAC | Region III | Tarlac DEO | On-Going | ₱116.4M | 98% | Medium risk52 | —-0.056 |
| 38 | 22CK0012NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING ALONG MANILA NORTH ROAD, BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱96.2M | 100% | Medium risk52 | —-0.087 |
| 39 | 20PK0017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS: TERTIARY ROADS - LUBUAGAN - BATONG BUHAY - ABRA BDRY. ROAD, K0460+900 - K0462+032, PASIL/LUBUAGAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.078 |
| 40 | 24CJ0089NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MONCADA - SAN MANUEL BYPASS ROAD (PHASE 4), TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | Medium risk51 | —-0.089 |
| 41 | 23PL0086ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CAGALUAN-CALANAN SECT) - K0493 + 000 - K0494 + 149 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱38.5M | 87% | Medium risk51 | —-0.035 |
| 42 | 21PL0023NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS MT. PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CAGALUAN-CALANAN SECTION), K0485+000-K0486+815, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱38.8M | 100% | Medium risk51 | —-0.081 |
| 43 | 19CK0092CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CLARK-BAMBAN-CAPAS ACCESS ROAD LEADING TO CLARK CITY (PACKAGE 1), TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱96.5M | 100% | Medium risk51 | —-0.079 |
| 44 | 22PL0042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS-MT. PROVINCE BDRY.-CALANAN-PINUKPUK-ABBUT RD (CAGALUAN | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱43.6M | 100% | Medium risk51 | —-0.075 |
| 45 | 19PK0001ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS ALONG KALINGA-ABRA ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱31.3M | 100% | Medium risk51 | —-0.081 |
| 46 | 19PK0025NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS - SECONDARY ROADS ALONG BALBALAN-PINUKPUK ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱37.7M | 100% | Medium risk51 | —-0.075 |
| 47 | 19PK0005ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG KALINGA-ABRA ROAD, PASIL, KALINGA /K0479+475-K0482+370 | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱40.1M | 100% | Medium risk51 | —-0.082 |
| 48 | 23PL0013ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS - MT. PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD (CAGALUAN-CALANAN SECT) - K0470+671-K04 | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱31.8M | 85% | Medium risk51 | —-0.036 |
| 49 | 19CK0071CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - NEW CLARK CITY TO TARLAC - ZAMBALES ROAD VIA KALANGITAN ROAD, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱96.5M | 100% | Medium risk51 | —-0.087 |
| 50 | 25CJ0206REHABILITATION OF SAN CLEMENTE ROAD NETWORK (ANNEX 2), SAN CLEMENTE, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | Medium risk50 | —-0.084 |