Contractor dossier
133 projects on file, including joint ventures this contractor is part of.
Total projects
133
Total budget
₱7.6B
Average progress
91.0%
Completion rate
78.9%
Average risk score
47.6
Medium risk on average, out of 100
Flagged as unusual
11
8.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 97 | ₱5.6B | 43.9 | 5 | 93.0% |
| Cordillera Administrative Region | 24 | ₱1.1B | 54.8 | 3 | 93.9% |
| Region VII | 7 | ₱541.7M | 68.9 | 3 | 46.6% |
| Region I | 3 | ₱206.5M | 58.4 | 0 | 100.0% |
| Region IV-A | 1 | ₱35.3M | 66.5 | 0 | 100.0% |
| Region IV-B | 1 | ₱46.2M | 37.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 72 | ₱4.7B | 46.0 | 0 | 95.1% |
| Flood Control and Drainage | 21 | ₱1.1B | 38.4 | 1 | 96.1% |
| Buildings and Facilities | 16 | ₱673.7M | 41.6 | 0 | 93.6% |
| Bridges | 11 | ₱272M | 35.0 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱294M | 94.9 | 4 | 24.2% |
| GAA 2025 OO-2 | 4 | ₱294M | 91.2 | 2 | 54.4% |
| OTHER | 3 | ₱148.1M | 79.1 | 2 | 77.2% |
| GAA 2025 OO-1 | 2 | ₱151.2M | 94.2 | 2 | 43.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0246CONSTRUCTION OF CRUZ - CALIBUNGAN DIVERSION ROAD (SEGMENT 5), VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.4M | 39% | High risk95 | Flagged0.023 |
| 25CJ0242CONSTRUCTION OF SAN MANUEL - BALETE DIVERSION ROAD (SEGMENT 2), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.5M | 4% | High risk95 | Flagged0.034 |
| 25CJ0307CONSTRUCTION (COMPLETION) OF TARLAC CITY GENERAL HOSPITAL, TARLAC | Region III | Tarlac DEO | On-Going | ₱78.5M | 26% | High risk95 | Flagged0.029 |
| 25HB0003ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS LOAY INTERIOR RD - K0172 + 022 - K0173 + 133, K0174 + 240 - K0175 + 164 | Region VII | Bohol 3rd DEO | On-Going | ₱54.7M | 58% | High risk94 | Flagged0.012 |
| 25CJ0154CONSTRUCTION OF ROAD AT BACULONG ECOZONE AREA (PHASE 2), VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱24.5M | 28% | High risk94 | Flagged0.019 |
| 25CJ0051CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MANILA NORTH ROAD TO TARLAC SN MIGUEL VIA MACABULOS ROAD, TARLAC PHASE 1, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 29% | High risk94 | Flagged0.016 |
| 25H00108OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE, WAHIG RIVER, STA. 0 + 470.00 - STA. 0 + 944.60, PAMACSALAN AREA, | Region VII | Region VII | On-Going | ₱85.1M | 13% | High risk92 | Flagged0.011 |
| 25H00107OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE, CASBU RIVER, STA. 0 + 385.00 - STA. 0 + 784.30, CANDIJAY, BOHOL | Region VII | Region VII | On-Going | ₱85.1M | 20% | High risk92 | Flagged0.007 |
| 25CJ0098CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SAN ISIDRO CREEK (PHASE 5), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱74.3M | 84% | High risk91 | —-0.018 |
| 25CJ0092CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG TARLAC RIVER CONTROL RIGHT DIKE, SAN NICOLAS - SAN. CRUZ SECTION (SEGMENT 11), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱49.5M | 100% | High risk90 | —-0.022 |
| 18PK0081CONCRETING AND IMPROVEMENT OF BALINCIAGAO-AMDALAO ROAD WITH BRIDGE | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱48.5M | 100% | High risk88 | Flagged0.038 |
| 25CK0103REHABILITATION OF EARTH SLOPE DIKE, UPSTREAM OF BANGOT BRIDGE - BANGUT RIVER LEFT SIDE (SEGMENT E), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 97% | High risk80 | —-0.023 |
| 24PK0082LOCAL PROGRAM (LP) BUILDINGS AND OTHER INFRASTRUCTURES - MULTIPURPOSE / FACILITIES NATIONAL BUILDING PROGRAM CONSTRUCTION (COMPLETION) OF DPWH UPPER KALINGA DISTRICT ENGINEERING OFFICE BUILDING, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱34.3M | 32% | High risk79 | Flagged0.018 |
| 21CA0060CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) - CONSTRUCTION OF ABUCAY MUNICIPAL POLICE STATION BUILDI | Region III | Bataan 1st DEO | Completed | ₱56.2M | 100% | High risk77 | —-0.063 |
| 20CJ0070NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS STA. IGNACIA - GUIMBA ROAD VIA GERONA PURA, (STA. IGNACIA SECTION), PACKAGE 2, TARLAC | Region III | Tarlac DEO | Completed | ₱65.3M | 100% | High risk70 | —-0.035 |
| 17DO0020MFO1-NATIONAL ROADS-NETWORK SERVICES-NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY ROADS-RODRIGUEZ SAN JOSE ROAD (SO4225LZ)-K0031+-251 - K0032+345 RODRIGUEZ RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱35.3M | 100% | High risk67 | —-0.072 |
| 17A00019CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-WIDENING (1-LANE) OF AMBAYAOAN BRIDGE, ALONG SAN NICOLAS-SAN MANUEL ROAD, PANGASINAN | Region I | Region I | Completed | ₱83M | 100% | High risk64 | —-0.017 |
| 17CE0047CONSTRUCTION OF BY-PASSES/DIVERSION ROADS INCLUDING ROW, GUIMBA-TALUGTUG-UMINGAN ROAD, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱46.5M | 100% | High risk64 | —-0.063 |
| 17A00028CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - WIDENING OF PERMANENT BRIDGE TO MORE THAN TWO (2) LANES, TAGAMUSING BRIDGE (B00728LZ) ALONG MANILA NORTH ROAD (PHASE II) | Region I | Region I | Completed | ₱77M | 100% | High risk64 | —-0.022 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18PK0081CONCRETING AND IMPROVEMENT OF BALINCIAGAO-AMDALAO ROAD WITH BRIDGE | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱48.5M | 100% | High risk88 | Flagged0.038 |
| 25CJ0242CONSTRUCTION OF SAN MANUEL - BALETE DIVERSION ROAD (SEGMENT 2), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.5M | 4% | High risk95 | Flagged0.034 |
| 25CJ0307CONSTRUCTION (COMPLETION) OF TARLAC CITY GENERAL HOSPITAL, TARLAC | Region III | Tarlac DEO | On-Going | ₱78.5M | 26% | High risk95 | Flagged0.029 |
| 25CJ0246CONSTRUCTION OF CRUZ - CALIBUNGAN DIVERSION ROAD (SEGMENT 5), VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.4M | 39% | High risk95 | Flagged0.023 |
| 25CJ0154CONSTRUCTION OF ROAD AT BACULONG ECOZONE AREA (PHASE 2), VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱24.5M | 28% | High risk94 | Flagged0.019 |
| 24PK0082LOCAL PROGRAM (LP) BUILDINGS AND OTHER INFRASTRUCTURES - MULTIPURPOSE / FACILITIES NATIONAL BUILDING PROGRAM CONSTRUCTION (COMPLETION) OF DPWH UPPER KALINGA DISTRICT ENGINEERING OFFICE BUILDING, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱34.3M | 32% | High risk79 | Flagged0.018 |
| 25CJ0051CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MANILA NORTH ROAD TO TARLAC SN MIGUEL VIA MACABULOS ROAD, TARLAC PHASE 1, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 29% | High risk94 | Flagged0.016 |
| 17PL0236PACKAGE 10: A) TALOCTOC FLOOD CONTROL ALONG TANUDAN RIVER, TANUDAN, B) ALINANAG FLOOD CONTROL ALONG MANGLIG RIVER, TABUK CITY, C) CUDAL FLOOD CONTROL ALONG MANGLIG RIVER, TABUK CITY, D) LAY-ASAN FLOOD CONTROL, TANUDAN | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱58M | 100% | Medium risk58 | Flagged0.012 |
| 25HB0003ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS LOAY INTERIOR RD - K0172 + 022 - K0173 + 133, K0174 + 240 - K0175 + 164 | Region VII | Bohol 3rd DEO | On-Going | ₱54.7M | 58% | High risk94 | Flagged0.012 |
| 25H00108OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE, WAHIG RIVER, STA. 0 + 470.00 - STA. 0 + 944.60, PAMACSALAN AREA, | Region VII | Region VII | On-Going | ₱85.1M | 13% | High risk92 | Flagged0.011 |
| 25H00107OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE, CASBU RIVER, STA. 0 + 385.00 - STA. 0 + 784.30, CANDIJAY, BOHOL | Region VII | Region VII | On-Going | ₱85.1M | 20% | High risk92 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23CJ0204BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD SLOPE PROTECTION INCLUDING ROAD SLIPS ALONG SAN JOSE, TARLAC PALAUIG, ZAMBALES ROAD (PACK | Region III | Tarlac DEO | Completed | ₱99M | 100% | Medium risk50 | —-0.084 |
| 52 | 18PK0047CONSTRUCTION OF NEW PERMANENT BRIDGES /AG-AGAMA BRIDGE ALONG LUBUAGAN - BATONG BUHAY - ABRA BOUNDARY ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱28.5M | 100% | Medium risk50 | —-0.026 |
| 53 | 23CJ0213SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF SLOPE PROTECTION ALONG SAN JOSE - PALAUIG ROAD PACKAGE 1, SAN JOSE, | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | Medium risk50 | —-0.088 |
| 54 | 23CJ0215SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF SLOPE PROTECTION ALONG SAN JOSE - PALAUIG ROAD PACKAGE 2, SAN JOSE, | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | Medium risk50 | —-0.088 |
| 55 | 25H00111OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE, GABAYAN RIVER, STA. 0 + 672.40 - STA. 1 + 071.40, CANDIJAY, BOHOL | Region VII | Region VII | On-Going | ₱85.1M | 71% | Medium risk50 | —-0.024 |
| 56 | 25CJ0199REHABILITATION OF STA. IGNACIA ROAD NETWORK (ANNEX 2), STA. IGNACIA, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | Medium risk50 | —-0.085 |
| 57 | 18PK0075RESTORATION OF VARIOUS ROADS IN PASIL, KALINGA: LUBUAGAN-BATONG BUHAY ROAD (JUNCTION TO PUAPO PROVINCIAL ROAD), DANGTALAN | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱38.1M | 100% | Medium risk50 | —-0.027 |
| 58 | 20PK0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PREVERVATION PROGRAM - PREVENTIVE MAINTENANCE: SECONDARY ROADS - MT PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT RD - K0444+017 TO K0460+1018, TINGLAYAN/LUBUAGAN, KALINGA | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱41.7M | 100% | Medium risk49 | —-0.082 |
| 59 | 25CJ0196REHABILITATION OF RAMOS ROAD NETWORK (ANNEX 2), RAMOS, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | Medium risk49 | —-0.086 |
| 60 | 18PL0050CONSTRUCTION OF FLOOD CONTROL ALONG CHICO RIVER, SITIO, ASIN, LUCOG, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱23.6M | 100% | Medium risk49 | —-0.068 |
| 61 | 19CL0050CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS OF SAN MIGUEL PORT BOULEVARD, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱92.6M | 100% | Medium risk49 | —-0.084 |
| 62 | 21PL0062NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - TABUK-BANAWE VIA TANUDAN-BARLIG ROAD | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.079 |
| 63 | 19CL0053CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO PRAWN FRY HATCHERIES AND RESORTS AND SURFING AREA, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱92.6M | 100% | Medium risk49 | —-0.085 |
| 64 | 18CK0117CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - CLARK GREEN CITY TO MAC ARTHUR ACCESS ROAD LEADING TO CLARK GREEN CITY, STA. 0+300 TO STA. 1+468, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱93.1M | 100% | Medium risk49 | —-0.090 |
| 65 | 20CL0019CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PRAWN FRY HATCHERIES AND RESORTS AND SURFING AREA, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱91.7M | 100% | Medium risk47 | —-0.027 |
| 66 | 20AI0027CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGAMUSING RIVER, BINALONAN, PANGASINAN (PACKAGE 3) | Region I | Pangasinan 3rd DEO | Completed | ₱46.5M | 100% | Medium risk47 | —-0.072 |
| 67 | 18CK0156CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - CLARK - BAMBAN - CAPAS ROAD LEADING TO CLARK CITY (SECTION II), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱92.9M | 100% | Medium risk47 | —-0.090 |
| 68 | 20CK0038CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - MAC ARTHUR HIGHWAY TO NEW CLARK CITY VIA KALANGITAN ROAD, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱92.7M | 100% | Medium risk46 | —-0.089 |
| 69 | 20PK0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: BUGNAY (MANGAPE) - BUSCALAN - LOCCONG - BUTBUT PROPER ROAD LEADING TO BUSCALAN TATTOO VILAGE, KALINGA. | Cordillera Administrative Region | Upper Kalinga DEO | On-Going | ₱35.6M | 52% | Medium risk46 | —-0.007 |
| 70 | 21CA0082LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD - TERTIARY ROADS BATAAN TECHNOLOGICAL PARK, | Region III | Bataan 1st DEO | Completed | ₱48.2M | 100% | Medium risk45 | —-0.096 |
| 71 | 19CJ0158LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF SAN JOSE, TARLAC-PALAUIG, ZAMBALES ROAD (TARLAC SECTION PHASE 4), SAN JOSE, TARLAC STA. 11+120 TO STA. 13+120, SAN JOSE, TARLAC | Region III | Tarlac DEO | Completed | ₱91.7M | 100% | Medium risk45 | —-0.087 |
| 72 | 25HB0040ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM ROAD WIDENING - SECONDARY ROADS - JCT (TER)- JAGNA-SIERRA BULLONES RD - K0067 + 527 - K0068 + | Region VII | Bohol 3rd DEO | On-Going | ₱34.2M | 70% | Medium risk44 | —-0.049 |
| 73 | 18CJ0135CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS REHABILITATION/IMPROVEMENT OF SAN JOSE, TARLAC -IBA, ZAMBALES ROAD, SAN JOSE SECTION, SAN JOSE, TARLAC (PHASE 3) | Region III | Tarlac DEO | Completed | ₱91.7M | 100% | Medium risk43 | —-0.086 |
| 74 | 18CL0061CONSTRUCTION / IMPROVEMENT OF ACCESS ROAD LEADING TO SEAPORTS, SAN MIGUEL PORT BOULEVARD, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱65.9M | 100% | Medium risk41 | —-0.092 |
| 75 | 24CJ0165CONSTRUCTION OF MULTI-PURPOSE BUILDING AT POBLACION AREA, CAMILING, TARLAC | Region III | Tarlac DEO | Completed | ₱57.9M | 100% | Medium risk41 | —-0.087 |