Contractor dossier
394 projects on file, including joint ventures this contractor is part of.
Total projects
394
Total budget
₱6B
Average progress
79.4%
Completion rate
31.2%
Below 70%
Average risk score
65.4
High risk on average, out of 100
Flagged as unusual
50
12.7% of their projects
Risk mix
Exhibit A
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 138 | ₱3.6B | 70.5 | 10 | 84.6% |
| Buildings and Facilities | 123 | ₱654.1M | 58.2 | 7 | 78.8% |
| Roads | 118 | ₱1.6B | 67.1 | 25 | 73.4% |
| GAA 2025 SSP | 5 | ₱62.2M | 96.1 | 5 | 68.3% |
| Water Provision and Storage | 5 | ₱26.5M | 42.9 | 2 | 93.1% |
| Bridges | 4 | ₱56.9M | 46.2 | 1 | 91.9% |
| GAA 2025 OO-2 | 1 | ₱48M | 90.7 | 0 | 84.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AA0530CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY 55-C VIRA, LAOAG CITY, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 75% | High risk97 | Flagged0.026 |
| 25AB0110BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD CONNECTING SITIO NAMURTAAN, CAPANGDANAN TO BRGY. BOMITOG, BANNA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 50% | High risk96 | Flagged0.031 |
| 25AB0091SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BUGASI, BANNA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱28.6M | 59% | High risk96 | Flagged0.031 |
| 25AA0473CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABUAYAAN CREEK, BURGOS, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱19M | 85% | High risk96 | Flagged0.024 |
| 25AB0020BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY SAN EUGENIO, SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 73% | High risk95 | Flagged0.026 |
| 25AB0035CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CURA RIVER, RIGHT BANK, BARANGAY SAN JULIAN, SOLSONA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱48M | 84% | High risk91 | —-0.000 |
| 25AA0262CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RD, BARANGAY BALAOI, PAGUDPUD, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk81 | Flagged0.009 |
| 25AA0261SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BURAYOC, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 73% | High risk81 | —-0.013 |
| 25AA0254CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RD, BARANGAY 12 SAN ISIDRO, L.C., I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 25AA0605BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (SENIOR CITIZEN BUILDING), BARANGAY 23 PANINAAN, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 69% | High risk80 | —-0.011 |
| 25AA0604BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI PURPOSE BUILDING, BARANGAY 20 PULANGI, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 70% | High risk80 | —-0.014 |
| 25AA0077FLOOD MANAGEMENT PROGRAM - CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST OF DRAINAGE CANAL STRUCTURE ALONG P. PATERNO ST., T. PASION ST. & M.H. DEL PILAR ST. AND J.P. RIZAL ST., BRGY NO. 23, SAN MATIAS, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk80 | Flagged0.019 |
| 25AA0568BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk79 | —-0.026 |
| 25AA0570BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk79 | —-0.025 |
| 25AA0402CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMP OF ROAD, BRGY NO. 17, SAN FRANCISCO, L.C., I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 11% | High risk78 | —-0.017 |
| 25AA0463CONVE AND SPEC SUP PROG - SUSTAIN INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDG/FACILITIES - CONST OF DRAINAGE STRUCTURE ALONG MAGAT SALAMAT ST., BRGY 12 SAN ISIDRO, LAOAG CITY, IN | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk78 | —-0.014 |
| 23AA0388SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. 12 SAN ISIDRO, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 89% | High risk78 | —-0.030 |
| 23AA0386BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT BRGY. 51-B, NANGALISAN WEST, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 96% | High risk78 | —-0.033 |
| 25AA0241CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BARANGAY 47 BENGCAG, LAOAG CITY, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 38% | High risk78 | —-0.029 |
| 25AA0461CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF RD, BRGY SAN RAMON, VINTAR, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 15% | High risk78 | —-0.017 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23AA0412CONCRETING OF BRGY. 54-A LAGUI-SAIL TO BRGY. CAMANGAAN FMR, BRGY. LAGUI-SAIL, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.9M | 0% | High risk76 | Flagged0.073 |
| 23AA0413CONCRETING OF BRGY. 31, TALINGAAN FMR, BRGY. TALINGAAN, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱14.3M | 0% | High risk75 | Flagged0.072 |
| 25AA0635CONCRETING OF BRGY. TANAP-BRGY. NAGSUROT FMR, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 0% | High risk72 | Flagged0.056 |
| 23AA0446CONCRETING OF SITIO CAGAT TO SITIO TUROD, BRGY. TANGAOAN FMR, BRGY. TANGAOAN, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.050 |
| 23AA0422CONCRETING OF BRGY. BALATONG FMR, BRGY. BALATONG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk75 | Flagged0.049 |
| 23AA0409CONCRETING OF BRGY. VIRA FMR, BRGY. VIRA, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱11.5M | 99% | High risk71 | Flagged0.044 |
| 24AA0554FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG BACARRA-VINTAR RIVER, BARANGAY 34, CABARUAN, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱36.9M | 86% | High risk71 | Flagged0.039 |
| 24AB0092CONCRETING OF BRGY. PAGDILAO-BADIAO FMR, BRGY. PAGDILAO, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱9.8M | 20% | Medium risk41 | Flagged0.037 |
| 25AB0110BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD CONNECTING SITIO NAMURTAAN, CAPANGDANAN TO BRGY. BOMITOG, BANNA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 50% | High risk96 | Flagged0.031 |
| 25AB0091SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BUGASI, BANNA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱28.6M | 59% | High risk96 | Flagged0.031 |
| 23AA0496CONSTRUCTION OF FLOOD MITIGATING STRUCTURES ALONG BOLO RIVER, ADAMS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱46.4M | 95% | High risk74 | Flagged0.030 |
| 24AA0412CONCRETING OF BRGY. LIBNAOAN FMR, BRGY. LIBNAOAN, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 54% | High risk76 | Flagged0.029 |
| 23AA0414CONCRETING OF BRGY. MANGATO-B FMR, BRGY. MANGATO-B, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱11.5M | 71% | High risk72 | Flagged0.029 |
| 24AA0426CONCRETING OF BRGY. CARUSIKIS FMR, BRGY. CARUSIKIS, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱38.3M | 59% | High risk76 | Flagged0.028 |
| 23AA0483CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANBAN RIVER, DOWNSTREAM OF BANBAN-DADAOR BRIDGE, BRGY UTOL, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱48.1M | 99% | High risk75 | Flagged0.028 |
| 24AA0462CONCRETING OF BRGY. 29 AND 30, SAN JOSE AND STO. TOMAS FMR, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 44% | High risk75 | Flagged0.027 |
| 25AB0020BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY SAN EUGENIO, SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 73% | High risk95 | Flagged0.026 |
| 23AB0170CONCRETING OF BRGY. MACAYEPYEP FMR, BRGY. MACAYEPYEP, BANNA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱12.3M | 76% | Medium risk49 | Flagged0.026 |
| 25AA0530CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY 55-C VIRA, LAOAG CITY, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 75% | High risk97 | Flagged0.026 |
| 23AA0479CONSTRUCTION OF FLOOD CONTROL FACILITIES AND STRUCTURES ALONG LAOAG RIVER BRGY. STO. TOMAS, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱46.4M | 100% | High risk74 | Flagged0.025 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25AA0083FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY NO. 57, PILA, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 63% | High risk78 | —-0.021 |
| 27 | 25AA0208CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BARANGAY SANGIL, BACARRA, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 92% | High risk78 | —-0.045 |
| 28 | 25AA0217CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB OF ROAD, BARANGAY TUBBURAN, BACARRA, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 34% | High risk78 | —-0.027 |
| 29 | 25AA0285CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BARANGAY DILANIS, PASUQUIN, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.051 |
| 30 | 25AA0222CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB OF ROAD, BARANGAY POBLACION, BURGOS, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 46% | High risk78 | —-0.029 |
| 31 | 25AA0210CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB OF RD, BARANGAY NAMBARAN, BACARRA, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.051 |
| 32 | 25AA0225SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY AGAGA, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk78 | —-0.050 |
| 33 | 23AA0365CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN LAGUI-SAIL ELEMENTARY SCHOOL, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 70% | High risk78 | —-0.018 |
| 34 | 24AA0340SIPAG - ACCESS ROADSAND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TOMAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OFROAD, BARANGAY P.F. ALVIAR, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 54% | High risk78 | —-0.029 |
| 35 | 25AA0430SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY DAVILA, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.050 |
| 36 | 25AA0525CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - REHABILITATION OF DRAINAGE CANAL STRUCTURE, BARANGAY 16 SAN ROQUE II, BACARRA, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 96% | High risk78 | —-0.034 |
| 37 | 24AA0332SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY #11 BULBULALA, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 41% | High risk78 | —-0.026 |
| 38 | 25AA0216CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BARANGAY MACUPIT, BACARRA, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.051 |
| 39 | 25AA0229CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB OF DUNGON-DUNGON ROAD, BRGY. NAGSUROT, BURGOS, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 43% | High risk78 | —-0.029 |
| 40 | 25AA0223CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF RD, BARANGAY NAGSUROT, BURGOS, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 86% | High risk78 | —-0.042 |
| 41 | 24AA0216SIPAG - FLOODMITIGATION STRUCTURES PROTECTING MAJOR / STRATEGICPUBLIC BUILDINGS / FACILITIES - REHABILITATION OF LINEDCANAL, BARANGAY 6, SAN AGUSTIN, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 93% | High risk78 | —-0.026 |
| 42 | 25AA0523CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - REHABILITATION OF BOX CULVERT, BARANGAY 8 SAN AGUSTIN I, BACARRA, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk78 | —-0.001 |
| 43 | 25AA0510SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG ZANJERA DINIEGA, BARANGAY 3 SAN ANDRES II, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 93% | High risk78 | —-0.032 |
| 44 | 25AA0526CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - REHABILITATION OF DRAINAGE CANAL STRUCTURE, BARANGAY 18 STO. CRISTO II, BACARRA, I.N | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 94% | High risk78 | —-0.032 |
| 45 | 25AA0501CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - REHABILITATION OF DRAINAGE CANAL STRUCTURE, BARANGAY 14 SAN GABRIEL II, BACARRA, I.N | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 94% | High risk78 | —-0.033 |
| 46 | 25AA0522SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - REHABILITATION OF DRAINAGE STRUCTURE, BARANGAY 6 SAN PEDRO I, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 98% | High risk78 | —-0.035 |
| 47 | 25AA0509SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG ZANJERA DE SALES, BARANGAY 2 SAN ANDRES I, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 98% | High risk78 | —-0.036 |
| 48 | 25AA0502CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY 17 STO. CRISTO I, BACARRA, I.N | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 99% | High risk78 | —-0.036 |
| 49 | 25AA0520CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF DRAINAGE CANAL STRUCTURE, BARANGAY 4 SAN SIMON I, BACARRA, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.039 |
| 50 | 25AA0521CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF DRAINAGE CANAL STRUCTURE, BARANGAY 5 SAN SIMON II, BACARRA, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk78 | —-0.039 |