Contractor dossier
394 projects on file, including joint ventures this contractor is part of.
Total projects
394
Total budget
₱6B
Average progress
79.4%
Completion rate
31.2%
Below 70%
Average risk score
65.4
High risk on average, out of 100
Flagged as unusual
50
12.7% of their projects
Risk mix
Exhibit A
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 138 | ₱3.6B | 70.5 | 10 | 84.6% |
| Buildings and Facilities | 123 | ₱654.1M | 58.2 | 7 | 78.8% |
| Roads | 118 | ₱1.6B | 67.1 | 25 | 73.4% |
| GAA 2025 SSP | 5 | ₱62.2M | 96.1 | 5 | 68.3% |
| Water Provision and Storage | 5 | ₱26.5M | 42.9 | 2 | 93.1% |
| Bridges | 4 | ₱56.9M | 46.2 | 1 | 91.9% |
| GAA 2025 OO-2 | 1 | ₱48M | 90.7 | 0 | 84.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AA0530CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY 55-C VIRA, LAOAG CITY, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 75% | High risk97 | Flagged0.026 |
| 25AB0110BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD CONNECTING SITIO NAMURTAAN, CAPANGDANAN TO BRGY. BOMITOG, BANNA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 50% | High risk96 | Flagged0.031 |
| 25AB0091SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BUGASI, BANNA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱28.6M | 59% | High risk96 | Flagged0.031 |
| 25AA0473CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KABUAYAAN CREEK, BURGOS, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱19M | 85% | High risk96 | Flagged0.024 |
| 25AB0020BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY SAN EUGENIO, SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 73% | High risk95 | Flagged0.026 |
| 25AB0035CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CURA RIVER, RIGHT BANK, BARANGAY SAN JULIAN, SOLSONA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱48M | 84% | High risk91 | —-0.000 |
| 25AA0262CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RD, BARANGAY BALAOI, PAGUDPUD, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk81 | Flagged0.009 |
| 25AA0261SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BURAYOC, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 73% | High risk81 | —-0.013 |
| 25AA0254CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RD, BARANGAY 12 SAN ISIDRO, L.C., I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 25AA0605BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (SENIOR CITIZEN BUILDING), BARANGAY 23 PANINAAN, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 69% | High risk80 | —-0.011 |
| 25AA0604BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI PURPOSE BUILDING, BARANGAY 20 PULANGI, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 70% | High risk80 | —-0.014 |
| 25AA0077FLOOD MANAGEMENT PROGRAM - CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST OF DRAINAGE CANAL STRUCTURE ALONG P. PATERNO ST., T. PASION ST. & M.H. DEL PILAR ST. AND J.P. RIZAL ST., BRGY NO. 23, SAN MATIAS, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk80 | Flagged0.019 |
| 25AA0568BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk79 | —-0.026 |
| 25AA0570BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk79 | —-0.025 |
| 25AA0402CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMP OF ROAD, BRGY NO. 17, SAN FRANCISCO, L.C., I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 11% | High risk78 | —-0.017 |
| 25AA0463CONVE AND SPEC SUP PROG - SUSTAIN INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDG/FACILITIES - CONST OF DRAINAGE STRUCTURE ALONG MAGAT SALAMAT ST., BRGY 12 SAN ISIDRO, LAOAG CITY, IN | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk78 | —-0.014 |
| 23AA0388SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. 12 SAN ISIDRO, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 89% | High risk78 | —-0.030 |
| 23AA0386BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT BRGY. 51-B, NANGALISAN WEST, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 96% | High risk78 | —-0.033 |
| 25AA0241CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BARANGAY 47 BENGCAG, LAOAG CITY, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 38% | High risk78 | —-0.029 |
| 25AA0461CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF RD, BRGY SAN RAMON, VINTAR, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 15% | High risk78 | —-0.017 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23AA0412CONCRETING OF BRGY. 54-A LAGUI-SAIL TO BRGY. CAMANGAAN FMR, BRGY. LAGUI-SAIL, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.9M | 0% | High risk76 | Flagged0.073 |
| 23AA0413CONCRETING OF BRGY. 31, TALINGAAN FMR, BRGY. TALINGAAN, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱14.3M | 0% | High risk75 | Flagged0.072 |
| 25AA0635CONCRETING OF BRGY. TANAP-BRGY. NAGSUROT FMR, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 0% | High risk72 | Flagged0.056 |
| 23AA0446CONCRETING OF SITIO CAGAT TO SITIO TUROD, BRGY. TANGAOAN FMR, BRGY. TANGAOAN, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱12M | 0% | High risk74 | Flagged0.050 |
| 23AA0422CONCRETING OF BRGY. BALATONG FMR, BRGY. BALATONG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk75 | Flagged0.049 |
| 23AA0409CONCRETING OF BRGY. VIRA FMR, BRGY. VIRA, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱11.5M | 99% | High risk71 | Flagged0.044 |
| 24AA0554FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG BACARRA-VINTAR RIVER, BARANGAY 34, CABARUAN, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱36.9M | 86% | High risk71 | Flagged0.039 |
| 24AB0092CONCRETING OF BRGY. PAGDILAO-BADIAO FMR, BRGY. PAGDILAO, PINILI, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱9.8M | 20% | Medium risk41 | Flagged0.037 |
| 25AB0110BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD CONNECTING SITIO NAMURTAAN, CAPANGDANAN TO BRGY. BOMITOG, BANNA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 50% | High risk96 | Flagged0.031 |
| 25AB0091SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BUGASI, BANNA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱28.6M | 59% | High risk96 | Flagged0.031 |
| 23AA0496CONSTRUCTION OF FLOOD MITIGATING STRUCTURES ALONG BOLO RIVER, ADAMS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱46.4M | 95% | High risk74 | Flagged0.030 |
| 24AA0412CONCRETING OF BRGY. LIBNAOAN FMR, BRGY. LIBNAOAN, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 54% | High risk76 | Flagged0.029 |
| 23AA0414CONCRETING OF BRGY. MANGATO-B FMR, BRGY. MANGATO-B, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱11.5M | 71% | High risk72 | Flagged0.029 |
| 24AA0426CONCRETING OF BRGY. CARUSIKIS FMR, BRGY. CARUSIKIS, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱38.3M | 59% | High risk76 | Flagged0.028 |
| 23AA0483CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANBAN RIVER, DOWNSTREAM OF BANBAN-DADAOR BRIDGE, BRGY UTOL, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱48.1M | 99% | High risk75 | Flagged0.028 |
| 24AA0462CONCRETING OF BRGY. 29 AND 30, SAN JOSE AND STO. TOMAS FMR, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 44% | High risk75 | Flagged0.027 |
| 25AB0020BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY SAN EUGENIO, SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 73% | High risk95 | Flagged0.026 |
| 23AB0170CONCRETING OF BRGY. MACAYEPYEP FMR, BRGY. MACAYEPYEP, BANNA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱12.3M | 76% | Medium risk49 | Flagged0.026 |
| 25AA0530CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY 55-C VIRA, LAOAG CITY, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 75% | High risk97 | Flagged0.026 |
| 23AA0479CONSTRUCTION OF FLOOD CONTROL FACILITIES AND STRUCTURES ALONG LAOAG RIVER BRGY. STO. TOMAS, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱46.4M | 100% | High risk74 | Flagged0.025 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 25AA0072FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY AGAGA, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk77 | —-0.038 |
| 77 | 25AA0625CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING, BARANGAY POBLACION, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk77 | —-0.005 |
| 78 | 25AA0603BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING, BARANGAY 19-A TAMBIDAO, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 55% | High risk77 | —-0.026 |
| 79 | 25AA0221SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY PAGALI, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 97% | High risk77 | —-0.047 |
| 80 | 23AA0406CONSTRUCTION OF MULTI PURPOSE BUILDING ( SCHOOL BUILDING ) AT MUSLIM COMPOUND, BRGY. 1 SAN LORENZO, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk77 | —-0.034 |
| 81 | 25AA0583BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY 27 NUESTRA SENORA DE SOLEDAD, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.9M | 48% | High risk77 | —-0.025 |
| 82 | 25AA0565BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.9M | 52% | High risk77 | —-0.026 |
| 83 | 23AA0404CONSTRUCTION OF MULTI PURPOSE BUILDING, BARANGAY STA. BALBINA, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.9M | 100% | High risk77 | —-0.034 |
| 84 | 24AA0306IMPROVEMENT OF MULTI-PURPOSE BUILDING, BANGUI NATIONAL HIGH SCHOOL, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk77 | —-0.040 |
| 85 | 24AA0339SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY NAMOROC, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 87% | High risk77 | —-0.038 |
| 86 | 24AA0360SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION ALONG ZANJERA DINIEGA, BARANGAY 7, SAN PEDRO II, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 78% | High risk77 | —-0.023 |
| 87 | 25AA0569BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI PURPOSE BUILDING (COVERED COURT), BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 100% | High risk77 | —-0.047 |
| 88 | 25AA0596BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 47 BENGCAG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.9M | 100% | High risk77 | —-0.048 |
| 89 | 24AA0290CONSTRUCTION OF MULTI PURPOSE BUILDING, BARANGAY PAGALI, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 81% | High risk77 | —-0.028 |
| 90 | 24AA0285CONSTRUCTION OF MULTI PURPOSE BUILDINGS, BARANGAY BAYOG, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 88% | High risk77 | —-0.029 |
| 91 | 25AA0512SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGAGA CREEK, BARANGAY AGAGA, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 75% | High risk77 | —-0.025 |
| 92 | 24AA0280CONSTRUCTION (COMPLETION) OF MULTI PURPOSE BUILDING, BARANGAY #10 SAN MIGUEL, SARRAT, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 20% | High risk76 | —-0.006 |
| 93 | 24AA0307CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, (COVERED COURT) BARANGAY MADILADIG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.9M | 75% | High risk76 | —-0.026 |
| 94 | 25AA0617BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI PURPOSE BUILDING (COVERED COURT), BARANGAY 19 ABUCAY, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 40% | High risk76 | —-0.023 |
| 95 | 24AA0394BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI PURPOSE BUILDING, BARANGAY CABISUCULAN, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 23% | High risk76 | —-0.011 |
| 96 | 24AA0288CONSTRUCTION OF MULTI PURPOSE BUILDING, BARANGAY DARUPIDIP, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 54% | High risk76 | —-0.018 |
| 97 | 23AB0179CONCRETING OF BRGY. 16, SAN MARCOS FMR, BRGY. 16, SAN MARCOS, SAN NICOLAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱24.1M | 100% | High risk76 | —-0.024 |
| 98 | 24AA0406CONCRETING OF BRGY. LAGUI - SAIL FMR, BRGY. LAGUI -SAIL, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.3M | 87% | High risk76 | Flagged0.019 |
| 99 | 24AA0271CONSTRUCTIONOF MULTI PURPOSE BUILDING, BOYBOY ELEMENTARY SCHOOL,PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 51% | High risk76 | —-0.018 |
| 100 | 25AA0111FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SITIO BARANGOBONG, BARANGAY DIPILAT, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 84% | High risk76 | —-0.031 |