Contractor dossier
3 projects on file, including joint ventures this contractor is part of.
Total projects
3
Total budget
₱155.1M
Average progress
99.7%
Completion rate
33.3%
Below 70%
Average risk score
56.1
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 2 | ₱61.3M | 51.8 | 0 | 99.5% |
| National Capital Region | 1 | ₱93.8M | 64.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 2 | ₱140.6M | 56.9 | 0 | 99.6% |
| Roads | 1 | ₱14.5M | 54.4 | 0 | 99.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OB0226CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG C-6 OPEN CHANNEL (PHASE 12), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.8M | 100% | High risk65 | —-0.078 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25OB0226CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG C-6 OPEN CHANNEL (PHASE 12), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.8M | 100% | High risk65 | —-0.078 |
| 2 | 24DD0303CONCRETING OF BARANGAY SAMPIRO FMR, BARANGAY SAMPIRO, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱14.5M | 100% | Medium risk54 | —-0.020 |
| 3 | 25DD0023ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LAIYA RIVER, SAN JUAN, | Region IV-A | Batangas 4th DEO | On-Going | ₱46.8M | 99% | Medium risk49 | —-0.053 |