Contractor dossier
82 projects on file, including joint ventures this contractor is part of.
Total projects
82
Total budget
₱6.5B
Average progress
93.5%
Completion rate
72.0%
Average risk score
57.3
Medium risk on average, out of 100
Flagged as unusual
4
4.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 62 | ₱4.4B | 55.2 | 2 | 91.5% |
| Region VIII | 15 | ₱1.5B | 62.1 | 2 | 99.6% |
| Region IX | 3 | ₱248.5M | 67.7 | 0 | 98.6% |
| Central Office | 1 | ₱192.4M | 74.0 | 0 | 100.0% |
| National Capital Region | 1 | ₱127M | 65.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 36 | ₱2.9B | 54.5 | 0 | 93.9% |
| Flood Control and Drainage | 33 | ₱2.5B | 56.4 | 0 | 95.0% |
| Bridges | 7 | ₱353.5M | 53.0 | 1 | 83.6% |
| OTHER | 3 | ₱373.6M | 75.7 | 1 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱317.9M | 92.1 | 1 | 83.7% |
| GAA 2025 OO-1 | 1 | ₱96.2M | 94.2 | 1 | 95.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IF0064CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALBUERA-BURAUEN ROAD(ALBUERA SECTION), PACKAGE 8, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96.2M | 96% | High risk94 | Flagged0.000 |
| 25H00049OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (UPSTREAM), LILOAN, CEBU | Region VII | Region VII | On-Going | ₱269.2M | 69% | High risk93 | Flagged0.020 |
| 25HH0061OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KINALUMSAN RIVER, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱48.7M | 98% | High risk91 | —-0.019 |
| 18IF0072CONSTRUCTION OF MISSING LINKS/NEW ROADS, BURAUEN-ALBUERA ROAD, LEYTE, INCLUDING SLOPE PROTECTION (CONSTRUCTION OF CONCRETE ROAD AND CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE) | Region VIII | Leyte 4th DEO | Completed | ₱245.8M | 100% | High risk82 | —-0.006 |
| 24IF0031CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALBUERA-BURAUEN ROAD (ALBUERA SECTION), PACKAGE 6, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱102.6M | 100% | High risk81 | Flagged0.010 |
| 23H00080METRO CEBU FLOOD CONTROL AND DRAINAGE IMPROVEMENT PROJECT, KINALUMSAN RIVER, DULJO, LABANGON AND MAMBALING, CEBU CITY | Central Office | Flood Control Management Cluster | Completed | ₱192.4M | 100% | High risk74 | —-0.048 |
| 21J00027CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF LABASON FLOOD CONTROL AT ANTONINO, LABASON, ZAMBOANGA DEL NORTE (UPSTREAM) PACKAGE 2 | Region IX | Region IX | Completed | ₱98.9M | 100% | High risk73 | —-0.059 |
| 25HH0062OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BRGY. BUDLAAN, CEBU CIT | Region VII | Cebu City DEO | On-Going | ₱67.3M | 100% | High risk70 | —-0.022 |
| 17J00040CONSTRUCTION OF RIVER CONTROL ALONG KIPIT RIVER, BRGY. KIPIT, LABASON, ZAMBOANGA DEL NORTE 3RD LD | Region IX | Region IX | Completed | ₱91.7M | 100% | High risk70 | —-0.042 |
| 24HH0010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARA | Region VII | Cebu City DEO | On-Going | ₱144.6M | 71% | High risk67 | —-0.005 |
| 24HH0009OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARA | Region VII | Cebu City DEO | Completed | ₱144.6M | 100% | High risk67 | —-0.058 |
| 24HH0008OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARA | Region VII | Cebu City DEO | Completed | ₱144.6M | 100% | High risk67 | —-0.058 |
| 24HN0032OO2: -FLOOD MANAGEMENT PROGRAM - CONST./ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY POLOG TO BARANGAY PANOYPOY, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135.1M | 100% | High risk66 | —-0.019 |
| 23H00112CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, ROAD CONCRETING OF SRP BACK ROAD (PHASE II), | Region VII | Region VII | Completed | ₱289.5M | 100% | High risk65 | —-0.001 |
| 21HI0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DANAO BRIDGE I, DANAO CITY, CEBU | Region VII | Cebu 5th DEO | Completed | ₱94.9M | 100% | High risk65 | —-0.061 |
| 19O00032RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- MAKATI-MANDALUYONG BRIDGE (B04891LZ) ALONG MAKATI- MANDALUYONG BRIDGE, CITIES OF MAKATI AND MANDALUYONG | National Capital Region | National Capital Region | Completed | ₱127M | 100% | High risk65 | —-0.031 |
| 25HH0013OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANANGA RIVER, PACKA | Region VII | Cebu City DEO | On-Going | ₱95M | 50% | High risk65 | —-0.022 |
| 25HH0035OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANANGA RIVER, PACKA | Region VII | Cebu City DEO | On-Going | ₱96M | 52% | High risk65 | —-0.022 |
| 24HH0081OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE- TERTIARY ROADS- GOV. CUENCO AVE - K0009+(-206) - K0009+995, CHAINAGE 2937-CHAINAGE 3966, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱143.9M | 100% | High risk64 | —-0.039 |
| 24HH0021OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KINALUMSAN RIVER, B | Region VII | Cebu City DEO | On-Going | ₱96.4M | 100% | High risk64 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25H00049OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (UPSTREAM), LILOAN, CEBU | Region VII | Region VII | On-Going | ₱269.2M | 69% | High risk93 | Flagged0.020 |
| 24IF0031CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALBUERA-BURAUEN ROAD (ALBUERA SECTION), PACKAGE 6, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱102.6M | 100% | High risk81 | Flagged0.010 |
| 24HH0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY BUH | Region VII | Cebu City DEO | On-Going | ₱6.8M | 14% | Medium risk48 | Flagged0.009 |
| 25IF0064CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALBUERA-BURAUEN ROAD(ALBUERA SECTION), PACKAGE 8, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96.2M | 96% | High risk94 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 19IF0096CONSTRUCTION OF MISSING LINKS/NEW ROADS-ALBUERA-BURAUEN ROAD, PACKAGE 2, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱137.2M | 100% | High risk61 | —-0.075 |
| 27 | 23J00022CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LABASON BYPASS ROAD PACKAGE 1 (KIPIT SECTION), ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱57.9M | 96% | High risk61 | —-0.035 |
| 28 | 25HH0159OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY-K0009+200-K0009+240, CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱96.3M | 61% | High risk60 | —-0.045 |
| 29 | 25HH0160OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY-K0009+240-K0009+280, CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱96.4M | 55% | High risk60 | —-0.045 |
| 30 | 25HH0121CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD WITH SLOPE PROTECTION STR | Region VII | Cebu City DEO | On-Going | ₱96.3M | 56% | High risk60 | —-0.044 |
| 31 | 23HH0055OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-SECONDARY ROADS-J LUNA AVE-(S00324CB) CHAINAGE 000-CHAINAGE 144,(S00330CB) CHAINAGE 000-CHAINAGE 1501, (S00024CB) CHAINAGE 645-CHAINAGE 1508, CEBU | Region VII | Cebu City DEO | Completed | ₱96.3M | 100% | High risk60 | —-0.085 |
| 32 | 23HH0009OO1: ENSURE SAFE AND RELIABLE NATIONAL ROADSYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-TERTIARY ROADS- CEBU CIRCUMFERENCIAL RD (KATIPUNAN ST)-(S00345CB) CHAINAGE 000-CHAINAGE 995 (S00346CB) CHAINAGE 000-CHAINAGE 931, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱96.4M | 100% | High risk60 | —-0.085 |
| 33 | 24HH0066OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE - TERTIARY ROADS IMUS RD - CHAINAGE 0 - CHAINAGE 1076, CHAINAGE 0 -CHAINAGE 1070, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱103.6M | 100% | Medium risk60 | —-0.047 |
| 34 | 20IF0044BURAUEN- ALBUERA ROAD, ALBUERA SECTION, PACKAGE 1, LEYTE, ALBUERA LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱96.4M | 100% | Medium risk59 | —-0.085 |
| 35 | 23IF0072CONSTRUCTION OF MISSING LINKS/NEW ROADS - BURAUEN - ALBUERA ROAD (ALBUERA SECTION), LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱115.8M | 100% | Medium risk59 | —-0.082 |
| 36 | 23IF0060CONSTRUCTION OF LIBERTY - BURAUEN BRGY. ROAD, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.084 |
| 37 | 24IF0032CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALBUERA-BURAUEN ROAD (ALBUERA SECTION), PACKAGE 7, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱100.3M | 100% | Medium risk58 | —-0.082 |
| 38 | 23HH0054OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-PRIMARY ROADS-CEBU NORTH RD-(S00321CB) CHAINAGE 000-CHAINAGE 696, (S00016CB) K0001+(-048)-K0001+653, (S00017CB) K0003+(-1339)-K0003+(-839), CEBU CITY | Region VII | Cebu City DEO | Completed | ₱91.4M | 100% | Medium risk56 | —-0.086 |
| 39 | 21IF0066CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE- BURAUEN- ALBUERA ROAD (ALBUERA SECTION), PACKAGE 3, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱91.5M | 100% | Medium risk56 | —-0.084 |
| 40 | 21IF0032CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - BURAUEN-ALBUERA RD (ALBUERA SECTION), PACKAGE 2, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱91.5M | 100% | Medium risk56 | —-0.085 |
| 41 | 17HH0123CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, JUNQUERA STREET, LEADING TO MANGO ENTERTAINMENT DISTRICT, DOWNTOWN TOURIST SPOTS (COLON STREET, PARIAN HERITAGE SHRINE, CASA GORORDO, CEBU METROPOLITAN CATHEDRAL AND | Region VII | Cebu City DEO | Completed | ₱22.8M | 100% | Medium risk56 | —-0.064 |
| 42 | 17HH0107ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS, CEBU NORTH ROAD (S00017CB), K0004+000 - K0004+279, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱10.4M | 100% | Medium risk55 | —-0.066 |
| 43 | 24HH0007OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- BRIDGE PROGRAM - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - INAYAWAN BR. (B00080CB) ALONG CEBU SOUTH COASTAL RD, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱72.2M | 100% | Medium risk55 | —-0.051 |
| 44 | 22HN0007OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BARANGAY CABANCALAN, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱77.2M | 100% | Medium risk54 | —-0.075 |
| 45 | 19HH0105OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT KINALUMSAN RIVER, BRGY. BUHISAN, CEBU CI | Region VII | Cebu City DEO | Completed | ₱63.2M | 100% | Medium risk54 | —-0.075 |
| 46 | 20HN0043OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER (PHASE V), MANDAUE CITY | Region VII | Cebu 6th DEO | Completed | ₱59.8M | 100% | Medium risk54 | —-0.076 |
| 47 | 25HH0034OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY PIT-OS, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱58.9M | 62% | Medium risk54 | —-0.026 |
| 48 | 19HH0051OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. BINALIW, CEBU C | Region VII | Cebu City DEO | Completed | ₱79.2M | 100% | Medium risk54 | —-0.062 |
| 49 | 19HH0050OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BRGY. BUDLAAN, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱67.6M | 100% | Medium risk54 | —-0.076 |
| 50 | 21HH0037OO2: ENSURE LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BRGY. PULANGBATO, CEBU | Region VII | Cebu City DEO | Completed | ₱59.1M | 100% | Medium risk54 | —-0.077 |