Contractor dossier
82 projects on file, including joint ventures this contractor is part of.
Total projects
82
Total budget
₱6.5B
Average progress
93.5%
Completion rate
72.0%
Average risk score
57.3
Medium risk on average, out of 100
Flagged as unusual
4
4.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 62 | ₱4.4B | 55.2 | 2 | 91.5% |
| Region VIII | 15 | ₱1.5B | 62.1 | 2 | 99.6% |
| Region IX | 3 | ₱248.5M | 67.7 | 0 | 98.6% |
| Central Office | 1 | ₱192.4M | 74.0 | 0 | 100.0% |
| National Capital Region | 1 | ₱127M | 65.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 36 | ₱2.9B | 54.5 | 0 | 93.9% |
| Flood Control and Drainage | 33 | ₱2.5B | 56.4 | 0 | 95.0% |
| Bridges | 7 | ₱353.5M | 53.0 | 1 | 83.6% |
| OTHER | 3 | ₱373.6M | 75.7 | 1 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱317.9M | 92.1 | 1 | 83.7% |
| GAA 2025 OO-1 | 1 | ₱96.2M | 94.2 | 1 | 95.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IF0064CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALBUERA-BURAUEN ROAD(ALBUERA SECTION), PACKAGE 8, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96.2M | 96% | High risk94 | Flagged0.000 |
| 25H00049OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (UPSTREAM), LILOAN, CEBU | Region VII | Region VII | On-Going | ₱269.2M | 69% | High risk93 | Flagged0.020 |
| 25HH0061OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KINALUMSAN RIVER, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱48.7M | 98% | High risk91 | —-0.019 |
| 18IF0072CONSTRUCTION OF MISSING LINKS/NEW ROADS, BURAUEN-ALBUERA ROAD, LEYTE, INCLUDING SLOPE PROTECTION (CONSTRUCTION OF CONCRETE ROAD AND CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE) | Region VIII | Leyte 4th DEO | Completed | ₱245.8M | 100% | High risk82 | —-0.006 |
| 24IF0031CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALBUERA-BURAUEN ROAD (ALBUERA SECTION), PACKAGE 6, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱102.6M | 100% | High risk81 | Flagged0.010 |
| 23H00080METRO CEBU FLOOD CONTROL AND DRAINAGE IMPROVEMENT PROJECT, KINALUMSAN RIVER, DULJO, LABANGON AND MAMBALING, CEBU CITY | Central Office | Flood Control Management Cluster | Completed | ₱192.4M | 100% | High risk74 | —-0.048 |
| 21J00027CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF LABASON FLOOD CONTROL AT ANTONINO, LABASON, ZAMBOANGA DEL NORTE (UPSTREAM) PACKAGE 2 | Region IX | Region IX | Completed | ₱98.9M | 100% | High risk73 | —-0.059 |
| 25HH0062OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BRGY. BUDLAAN, CEBU CIT | Region VII | Cebu City DEO | On-Going | ₱67.3M | 100% | High risk70 | —-0.022 |
| 17J00040CONSTRUCTION OF RIVER CONTROL ALONG KIPIT RIVER, BRGY. KIPIT, LABASON, ZAMBOANGA DEL NORTE 3RD LD | Region IX | Region IX | Completed | ₱91.7M | 100% | High risk70 | —-0.042 |
| 24HH0010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARA | Region VII | Cebu City DEO | On-Going | ₱144.6M | 71% | High risk67 | —-0.005 |
| 24HH0009OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARA | Region VII | Cebu City DEO | Completed | ₱144.6M | 100% | High risk67 | —-0.058 |
| 24HH0008OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARA | Region VII | Cebu City DEO | Completed | ₱144.6M | 100% | High risk67 | —-0.058 |
| 24HN0032OO2: -FLOOD MANAGEMENT PROGRAM - CONST./ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY POLOG TO BARANGAY PANOYPOY, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135.1M | 100% | High risk66 | —-0.019 |
| 23H00112CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, ROAD CONCRETING OF SRP BACK ROAD (PHASE II), | Region VII | Region VII | Completed | ₱289.5M | 100% | High risk65 | —-0.001 |
| 21HI0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DANAO BRIDGE I, DANAO CITY, CEBU | Region VII | Cebu 5th DEO | Completed | ₱94.9M | 100% | High risk65 | —-0.061 |
| 19O00032RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- MAKATI-MANDALUYONG BRIDGE (B04891LZ) ALONG MAKATI- MANDALUYONG BRIDGE, CITIES OF MAKATI AND MANDALUYONG | National Capital Region | National Capital Region | Completed | ₱127M | 100% | High risk65 | —-0.031 |
| 25HH0013OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANANGA RIVER, PACKA | Region VII | Cebu City DEO | On-Going | ₱95M | 50% | High risk65 | —-0.022 |
| 25HH0035OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANANGA RIVER, PACKA | Region VII | Cebu City DEO | On-Going | ₱96M | 52% | High risk65 | —-0.022 |
| 24HH0081OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE- TERTIARY ROADS- GOV. CUENCO AVE - K0009+(-206) - K0009+995, CHAINAGE 2937-CHAINAGE 3966, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱143.9M | 100% | High risk64 | —-0.039 |
| 24HH0021OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KINALUMSAN RIVER, B | Region VII | Cebu City DEO | On-Going | ₱96.4M | 100% | High risk64 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25H00049OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (UPSTREAM), LILOAN, CEBU | Region VII | Region VII | On-Going | ₱269.2M | 69% | High risk93 | Flagged0.020 |
| 24IF0031CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALBUERA-BURAUEN ROAD (ALBUERA SECTION), PACKAGE 6, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱102.6M | 100% | High risk81 | Flagged0.010 |
| 24HH0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY BUH | Region VII | Cebu City DEO | On-Going | ₱6.8M | 14% | Medium risk48 | Flagged0.009 |
| 25IF0064CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALBUERA-BURAUEN ROAD(ALBUERA SECTION), PACKAGE 8, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96.2M | 96% | High risk94 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 24HH0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD WITH SLOPE PROTECTION ST | Region VII | Cebu City DEO | On-Going | ₱71.3M | 14% | Medium risk54 | —-0.024 |
| 52 | 25HH0057OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -SECONDARY ROADS- CEBU SOUTH COASTAL RD -(S00134CB)- K0008+(-767)-K0008+000, (S00135CB) K0008+000-K0008+536, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱86.6M | 100% | Medium risk54 | —-0.057 |
| 53 | 23HH0060OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-SECONDARY ROADS- SALINAS DRIVE-(S00026CB) CHAINAGE 000 - CHAINAGE 1198, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱87.6M | 100% | Medium risk54 | —-0.086 |
| 54 | 23HH0053OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-TERTIARY ROADS- GORORDO AVE- K0003+(-870) - K0003+757, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱63.7M | 100% | Medium risk54 | —-0.093 |
| 55 | 22IF0031CONSTRUCTION OF MISSING LINKS/NEW ROADS, BURAUEN-ALBUERA ROAD (ALBUERA SECTION) PACKAGE 4, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱54M | 100% | Medium risk53 | —-0.093 |
| 56 | 22HI0034CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, LILOAN, CEBU | Region VII | Cebu 5th DEO | Completed | ₱86.8M | 100% | Medium risk52 | —-0.071 |
| 57 | 22IF0043CONSTRUCTION OF MISSING LINKS/NEW ROADS, BURAUEN-ALBUERA ROAD (ALBUERA SECTION) PACKAGE 5, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.095 |
| 58 | 21HN0001OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS -FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON | Region VII | Cebu 6th DEO | Completed | ₱52.8M | 100% | Medium risk51 | —-0.078 |
| 59 | 25HH0042OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS - F. CABAHUG EXT/F. CABAHUG BR-(S00042CB) - CHAINAGE 488 - CHAINAGE 1166, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱48.5M | 100% | Medium risk51 | —-0.064 |
| 60 | 20HN0011OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -PRIMARY ROADS-CEBUNORTH HAGNAYA WHARF ROAD-K0008+(-703) - K0008+317, K0008+953 -K0009+205, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱49.4M | 100% | Medium risk51 | —-0.095 |
| 61 | 22HH0034OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-TERTIARY ROADS-CEBU NORTH RD.-K0003+(-230)-K0003+000, K0003+466- K0004+000, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.096 |
| 62 | 19IF0083CONSTRUCTION OF ROAD WITH SLOPE PROTECTION, ALBUERA-BURAUEN ROAD (ALBUERA SECTION) ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱46.8M | 100% | Medium risk50 | —-0.093 |
| 63 | 20IF0086CONSTRUCTION OF CONCRETE ROAD WITH SLOPE PROTECTION, ALBUERA- BURAUEN ROAD, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱41.9M | 100% | Medium risk48 | —-0.095 |
| 64 | 23HH0072OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - INAYAWAN BR. (B00080CB) ALONG CEBU SOUTH COASTAL RD, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.057 |
| 65 | 24HH0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY BUH | Region VII | Cebu City DEO | On-Going | ₱6.8M | 14% | Medium risk48 | Flagged0.009 |
| 66 | 25HH0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CONCRETE BRIDGE, PACKAGE 2, BA | Region VII | Cebu City DEO | On-Going | ₱8.7M | 72% | Medium risk48 | —-0.018 |
| 67 | 18HH0050CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BRGY. BUDLAAN, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.077 |
| 68 | 19HH0121OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY, (S00031CB) K0006+080-K0006+225, K0007+608-K0008+000, K0010+726-K0011+200, K0012+000-K0012+300, K | Region VII | Cebu City DEO | Completed | ₱31.6M | 100% | Medium risk47 | —-0.096 |
| 69 | 20HN0012OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -PRIMARY ROADS - CEBU NORTH HAGNAYA WHARF ROAD - K0005+(-710) -K0005+100, CHAINAGE 800 - CHAINAGE 1011, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱42.1M | 100% | Medium risk47 | —-0.096 |
| 70 | 22HN0021CLUSTER II OO1:ENSURE SAFE & RELIABLE NAT'L. RD. SYS-ASSET PRESERVATION PROG-PREVENTIVE MAINT.-PRIMARY RDS- A.)CNHWR- K0010+222-K0010+694 B.)CNHWR-K0005+100-K0005+492,K0005+676-K0005+986 & C.)CNHWR-(S00270CB) CHAINAGE 000 -CHAINAGE 193, CHAINAGE 693-800 | Region VII | Cebu 6th DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.093 |
| 71 | 18HH0021CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT KINALUMSAN RIVER, BRGY. BUHISAN, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱32.6M | 100% | Medium risk47 | —-0.077 |
| 72 | 20HH0020OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG GUADALUPE RIVER, BRGY. KALUNASAN, CEBU | Region VII | Cebu City DEO | Completed | ₱46.5M | 100% | Medium risk47 | —-0.078 |
| 73 | 20HH0019OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KINALUMSAN RIVER, BRGY. BUHISAN, CEBU | Region VII | Cebu City DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.079 |
| 74 | 19HF0010CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT SAPANGDAKU RIVER BASIN ALONG TOLEDO-TABUELAN-SAN REMEGIO RD, TOLEDO CITY, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱20.6M | 100% | Medium risk47 | —-0.078 |
| 75 | 18HH0023CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. TALAMBAN-BACAYAN, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱43M | 100% | Medium risk47 | —-0.078 |