Contractor dossier
116 projects on file, including joint ventures this contractor is part of.
Total projects
116
Total budget
₱2.8B
Average progress
98.2%
Completion rate
94.0%
Average risk score
41.9
Medium risk on average, out of 100
Flagged as unusual
3
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 112 | ₱2.7B | 41.8 | 3 | 98.1% |
| Negros Island Region | 4 | ₱105.4M | 45.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 52 | ₱1.6B | 46.7 | 0 | 97.9% |
| Buildings and Facilities | 34 | ₱349M | 23.6 | 0 | 99.7% |
| Flood Control and Drainage | 19 | ₱611.6M | 49.2 | 0 | 95.2% |
| OTHER | 10 | ₱274.9M | 65.3 | 3 | 99.9% |
| Water Provision and Storage | 1 | ₱10.4M | 47.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18HB0157CONCRETING OF BRGY. CANTAGAY FMR, BRGY. CANTAGAY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+793.26, STA. 0+834.96 - STA. 1+040.00, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk78 | Flagged0.012 |
| 24HB0019ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0168 + 839 - K0169 + 865 | Region VII | Bohol 3rd DEO | On-Going | ₱87.3M | 99% | High risk72 | Flagged0.012 |
| 21HB0158CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM- ROLL IT)-JCT.(TER) GABAYAN-ANOLING (CANDIJAY)-INAGH | Region VII | Bohol 3rd DEO | Completed | ₱67M | 100% | High risk71 | —-0.027 |
| 18HB0156CONCRETING OF BRGY. MALBOG FMR, BRGY. MALBOG, JAGNA, BOHOL STA. 0+000.00-STA. 0+498.12 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk66 | Flagged0.013 |
| 17HA0039CONSTRUCTION OF LIBORON RIVER FLOOD CONTROL, CALAPE, BOHOL. STA. 1+065-STA. 1+700.00 PROJECT COMPONE | Region VII | Bohol 1st DEO | Completed | ₱22.7M | 100% | High risk63 | —-0.050 |
| 18HB0087CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, JCT. (LIR) QUINOGUITAN-SEVILLA-HANOPOL-TAGUSTUSAN (BALILIHAN) ROAD IN SUPPORT OF THE FURNITURE AND GARMENTS AND TOURISM INDUSTRIES, SEVILLA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱18.6M | 100% | High risk63 | —-0.030 |
| 18HB0062CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-CORBADA-INAHAGAN-CABAHIS-LA HACIENDA (ALICIA)BARANGAY ROAD LEADING TO BIRHEN SA BARANGAY NATURE RESORT AND CAGONGCAGONG, BRGY. LA HACIENDA, ALICIA, BOHOL KO0+000.00-KO1+039. | Region VII | Bohol 3rd DEO | Completed | ₱13.9M | 100% | High risk62 | —-0.030 |
| 20HB0154LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROADS SITIO CABUNGAN, BRGY. CADAPDAPAN, CANDIJAY TO BRGY. INAGHUBAN, PILAR, BOHOL, ST | Region VII | Bohol 3rd DEO | Completed | ₱39.2M | 100% | High risk62 | —-0.030 |
| 18HB0086CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, JCT. (LIR) BUENOS AIRES-NUEVA VIDA (CARMEN)-OMJON (VALENCIA) ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY | Region VII | Bohol 3rd DEO | Completed | ₱15.7M | 100% | High risk61 | —-0.030 |
| 19HB0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS -CABUNGAAN - LONOY ROAD LEADING TO KINAHUGAN FALLS AND LONOY SPRING, BRGY. CABUNGAAN, JAGNA, BOHOL STA. 000+800 - STA. 001+200 | Region VII | Bohol 3rd DEO | Completed | ₱9.4M | 100% | High risk60 | —-0.030 |
| 25HA0044ROAD WIDENING - SECONDARY ROADS - THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0055+922 - K0057+000 | Region VII | Bohol 1st DEO | On-Going | ₱49.2M | 52% | High risk60 | —-0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18HB0156CONCRETING OF BRGY. MALBOG FMR, BRGY. MALBOG, JAGNA, BOHOL STA. 0+000.00-STA. 0+498.12 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk66 | Flagged0.013 |
| 18HB0157CONCRETING OF BRGY. CANTAGAY FMR, BRGY. CANTAGAY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+793.26, STA. 0+834.96 - STA. 1+040.00, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk78 | Flagged0.012 |
| 24HB0019ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0168 + 839 - K0169 + 865 | Region VII | Bohol 3rd DEO | On-Going | ₱87.3M | 99% | High risk72 | Flagged0.012 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 18HB0157CONCRETING OF BRGY. CANTAGAY FMR, BRGY. CANTAGAY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+793.26, STA. 0+834.96 - STA. 1+040.00, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk78 | Flagged0.012 |
| 2 | 24HB0019ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0168 + 839 - K0169 + 865 | Region VII | Bohol 3rd DEO | On-Going | ₱87.3M | 99% | High risk72 | Flagged0.012 |
| 3 | 21HB0158CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM- ROLL IT)-JCT.(TER) GABAYAN-ANOLING (CANDIJAY)-INAGH | Region VII | Bohol 3rd DEO | Completed | ₱67M | 100% | High risk71 | —-0.027 |
| 4 | 18HB0156CONCRETING OF BRGY. MALBOG FMR, BRGY. MALBOG, JAGNA, BOHOL STA. 0+000.00-STA. 0+498.12 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk66 | Flagged0.013 |
| 5 | 17HA0039CONSTRUCTION OF LIBORON RIVER FLOOD CONTROL, CALAPE, BOHOL. STA. 1+065-STA. 1+700.00 PROJECT COMPONE | Region VII | Bohol 1st DEO | Completed | ₱22.7M | 100% | High risk63 | —-0.050 |
| 6 | 18HB0087CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, JCT. (LIR) QUINOGUITAN-SEVILLA-HANOPOL-TAGUSTUSAN (BALILIHAN) ROAD IN SUPPORT OF THE FURNITURE AND GARMENTS AND TOURISM INDUSTRIES, SEVILLA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱18.6M | 100% | High risk63 | —-0.030 |
| 7 | 18HB0062CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-CORBADA-INAHAGAN-CABAHIS-LA HACIENDA (ALICIA)BARANGAY ROAD LEADING TO BIRHEN SA BARANGAY NATURE RESORT AND CAGONGCAGONG, BRGY. LA HACIENDA, ALICIA, BOHOL KO0+000.00-KO1+039. | Region VII | Bohol 3rd DEO | Completed | ₱13.9M | 100% | High risk62 | —-0.030 |
| 8 | 20HB0154LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROADS SITIO CABUNGAN, BRGY. CADAPDAPAN, CANDIJAY TO BRGY. INAGHUBAN, PILAR, BOHOL, ST | Region VII | Bohol 3rd DEO | Completed | ₱39.2M | 100% | High risk62 | —-0.030 |
| 9 | 18HB0086CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, JCT. (LIR) BUENOS AIRES-NUEVA VIDA (CARMEN)-OMJON (VALENCIA) ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY | Region VII | Bohol 3rd DEO | Completed | ₱15.7M | 100% | High risk61 | —-0.030 |
| 10 | 19HB0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS -CABUNGAAN - LONOY ROAD LEADING TO KINAHUGAN FALLS AND LONOY SPRING, BRGY. CABUNGAAN, JAGNA, BOHOL STA. 000+800 - STA. 001+200 | Region VII | Bohol 3rd DEO | Completed | ₱9.4M | 100% | High risk60 | —-0.030 |
| 11 | 25HA0044ROAD WIDENING - SECONDARY ROADS - THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0055+922 - K0057+000 | Region VII | Bohol 1st DEO | On-Going | ₱49.2M | 52% | High risk60 | —-0.020 |
| 12 | 19HB0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TRADES, INDUSTRIES, AND ECONOMIC ZONES, BAGUMBAYAN-ESTACA (PILAR)-CALUNASAN-DAGOHOY ROAD IN SUPPORT OF THE AGRIBUSINESS, INDUSTRY, PILAR, BOHOL STA. 2+095 | Region VII | Bohol 3rd DEO | Completed | ₱9.4M | 100% | Medium risk60 | —-0.031 |
| 13 | 22HA0008CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - TANDAY-CORELLA PROVINCIAL ROAD CONNECTING TCSR IN SUPPORT TO AGRIBUSINESS INDUSTRIES, CORELLA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.078 |
| 14 | 17HA0059CONSTRUCTION OF UBUJAN FLOOD CONTROL (BATERIA RIVER), TUBIGON, BOHOL PROJECT ID ; P00122191VS | Region VII | Bohol 1st DEO | Completed | ₱46M | 100% | Medium risk59 | —-0.051 |
| 15 | 17H00027MFO-1- NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT, OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS. S00078BH, TAGBILARAN EAST ROAD (TAGB.-JAGNA) | Region VII | Region VII | Completed | ₱60.4M | 100% | Medium risk57 | —-0.058 |
| 16 | 23HB0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱101.2M | 100% | Medium risk57 | —-0.081 |
| 17 | 17HA0043CONCRETING OF BARANGAY ROADS, NAGTUANG-TUBUAN-BONGCO, LOON, BOHOL, STA.00+000-STA.01+020, PROJECT CO | Region VII | Bohol 1st DEO | Completed | ₱23M | 100% | Medium risk56 | —-0.063 |
| 18 | 23HB0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACULITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CANDIJAY SPORTS CENTER), BRGY. POBLACION, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱99M | 100% | Medium risk56 | —-0.062 |
| 19 | 17HA0002CONSTRUCTION OF MULTI-PURPOSE BUILDING, CANTAONGON, LOON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱7.7M | 100% | Medium risk55 | —-0.065 |
| 20 | 24HA0094CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002+170 AND PEÑAFLOR STREET LEADING TO OUTFALL, BRGYS. COGON, BOOY AND TALOTO, TAGBILARAN CITY, BOHOL (PHASE 2 | Region VII | Bohol 1st DEO | On-Going | ₱69.9M | 84% | Medium risk54 | —-0.024 |
| 21 | 23HA0110CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRANSTRUCTURE PROGRAM - ROLL-IT) - TANDAY-CORELLA PROVINCIAL ROAD CONNECTING TCSR IN SUPPORT TO AGRIBUSINESS IND | Region VII | Bohol 1st DEO | On-Going | ₱72.2M | 92% | Medium risk53 | —-0.043 |
| 22 | 17HB0002ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4) SECONDARY ROAD, TAGBILARAN EAST ROAD (TAGBILARAN | Region VII | Bohol 3rd DEO | Completed | ₱45.4M | 100% | Medium risk53 | —-0.061 |
| 23 | 24HA0027CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BATERIA RIVER FLOOD CONTROL, TUBIGON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱69.9M | 100% | Medium risk53 | —-0.074 |
| 24 | 20HB0038ORGANIZATIONAL OUTCOME 1: ENSURE SAFETY AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, JCT. (TER) JAGNA-SIERRA BULLONES ROAD, KO065+054 - KO066+018, KO066+097 - KO067+500.00 | Region VII | Bohol 3rd DEO | Completed | ₱19.8M | 100% | Medium risk52 | —-0.061 |
| 25 | 17HB0024ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT - 4 (HDM-4) SECONDARY ROADS, JCT. (TER) JAGNA-SIERRA BULLO | Region VII | Bohol 3rd DEO | Completed | ₱20.4M | 100% | Medium risk52 | —-0.061 |