Contractor dossier
116 projects on file, including joint ventures this contractor is part of.
Total projects
116
Total budget
₱2.8B
Average progress
98.2%
Completion rate
94.0%
Average risk score
41.9
Medium risk on average, out of 100
Flagged as unusual
3
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 112 | ₱2.7B | 41.8 | 3 | 98.1% |
| Negros Island Region | 4 | ₱105.4M | 45.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 52 | ₱1.6B | 46.7 | 0 | 97.9% |
| Buildings and Facilities | 34 | ₱349M | 23.6 | 0 | 99.7% |
| Flood Control and Drainage | 19 | ₱611.6M | 49.2 | 0 | 95.2% |
| OTHER | 10 | ₱274.9M | 65.3 | 3 | 99.9% |
| Water Provision and Storage | 1 | ₱10.4M | 47.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18HB0157CONCRETING OF BRGY. CANTAGAY FMR, BRGY. CANTAGAY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+793.26, STA. 0+834.96 - STA. 1+040.00, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk78 | Flagged0.012 |
| 24HB0019ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0168 + 839 - K0169 + 865 | Region VII | Bohol 3rd DEO | On-Going | ₱87.3M | 99% | High risk72 | Flagged0.012 |
| 21HB0158CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM- ROLL IT)-JCT.(TER) GABAYAN-ANOLING (CANDIJAY)-INAGH | Region VII | Bohol 3rd DEO | Completed | ₱67M | 100% | High risk71 | —-0.027 |
| 18HB0156CONCRETING OF BRGY. MALBOG FMR, BRGY. MALBOG, JAGNA, BOHOL STA. 0+000.00-STA. 0+498.12 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk66 | Flagged0.013 |
| 17HA0039CONSTRUCTION OF LIBORON RIVER FLOOD CONTROL, CALAPE, BOHOL. STA. 1+065-STA. 1+700.00 PROJECT COMPONE | Region VII | Bohol 1st DEO | Completed | ₱22.7M | 100% | High risk63 | —-0.050 |
| 18HB0087CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, JCT. (LIR) QUINOGUITAN-SEVILLA-HANOPOL-TAGUSTUSAN (BALILIHAN) ROAD IN SUPPORT OF THE FURNITURE AND GARMENTS AND TOURISM INDUSTRIES, SEVILLA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱18.6M | 100% | High risk63 | —-0.030 |
| 18HB0062CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-CORBADA-INAHAGAN-CABAHIS-LA HACIENDA (ALICIA)BARANGAY ROAD LEADING TO BIRHEN SA BARANGAY NATURE RESORT AND CAGONGCAGONG, BRGY. LA HACIENDA, ALICIA, BOHOL KO0+000.00-KO1+039. | Region VII | Bohol 3rd DEO | Completed | ₱13.9M | 100% | High risk62 | —-0.030 |
| 20HB0154LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROADS SITIO CABUNGAN, BRGY. CADAPDAPAN, CANDIJAY TO BRGY. INAGHUBAN, PILAR, BOHOL, ST | Region VII | Bohol 3rd DEO | Completed | ₱39.2M | 100% | High risk62 | —-0.030 |
| 18HB0086CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, JCT. (LIR) BUENOS AIRES-NUEVA VIDA (CARMEN)-OMJON (VALENCIA) ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY | Region VII | Bohol 3rd DEO | Completed | ₱15.7M | 100% | High risk61 | —-0.030 |
| 19HB0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS -CABUNGAAN - LONOY ROAD LEADING TO KINAHUGAN FALLS AND LONOY SPRING, BRGY. CABUNGAAN, JAGNA, BOHOL STA. 000+800 - STA. 001+200 | Region VII | Bohol 3rd DEO | Completed | ₱9.4M | 100% | High risk60 | —-0.030 |
| 25HA0044ROAD WIDENING - SECONDARY ROADS - THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0055+922 - K0057+000 | Region VII | Bohol 1st DEO | On-Going | ₱49.2M | 52% | High risk60 | —-0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18HB0156CONCRETING OF BRGY. MALBOG FMR, BRGY. MALBOG, JAGNA, BOHOL STA. 0+000.00-STA. 0+498.12 | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | High risk66 | Flagged0.013 |
| 18HB0157CONCRETING OF BRGY. CANTAGAY FMR, BRGY. CANTAGAY, JAGNA, BOHOL, STA. 0+000.00 - STA. 0+793.26, STA. 0+834.96 - STA. 1+040.00, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.5M | 100% | High risk78 | Flagged0.012 |
| 24HB0019ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0168 + 839 - K0169 + 865 | Region VII | Bohol 3rd DEO | On-Going | ₱87.3M | 99% | High risk72 | Flagged0.012 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18HA0047CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATION-JCT. ANTEQUERA-SAN-ISIDRO-LIBERTAD ROAD LEADING TO DANAO AGRI-TOURISM, BRGY. DANAO, ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱25.1M | 100% | Medium risk46 | —-0.096 |
| 52 | 21HA0121CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - KINABAG-AN TALISAY ROAD LEADING TO HAYAHAY BEACH RESORT AND TREASURE ISLAND RESORT, PANGANGAN, CALAPE, BOHOL. | Region VII | Bohol 1st DEO | Completed | ₱28.1M | 100% | Medium risk46 | —-0.096 |
| 53 | 20HA0082CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-CAMIAS-SOHOTON ROAD CONNECTING TAGBILARAN NORTH ROAD AND UBUJAN-CAMIAS PROVINCIAL ROAD IN SUPPORT TO GIFTS AND HOUSEWARES AND AGRIBUSINESS INDUSTRIES, CALAPE, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱22.1M | 100% | Medium risk46 | —-0.097 |
| 54 | 21HA0039CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - KINABAG-AN-TALISAY ROAD LEADING TO HAYAHAY BEACH RESORTS AND TREASURE ISLAND RESORT, PANGANGAN, CALAPE, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.094 |
| 55 | 18HA0048REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-JCT. (TNR) MARIBOJOC-ANTEQUERA-CATAGBACAN (LOON)-K0021+000-K0021+420, K0021+480-K0021+620, K0021+720-K0022+100, ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱21.4M | 100% | Medium risk46 | —-0.096 |
| 56 | 19HA0128CONSTRUCTION (COMPLETION) OF POBLACION WESTE - BONGBONG ROAD, CATIGBIAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱28.4M | 100% | Medium risk46 | —-0.095 |
| 57 | 20HA0061CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF POBLACION WESTE AND POLACION ESTE FLOOD CONTROL PROJECT, CATIGBIAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱11M | 100% | Medium risk46 | —-0.077 |
| 58 | 18HA0099CONSTRUCTION OF DRAINAGE ALONG TAGBILARAN NORTH ROAD (BARANGAYS STA. CRUZ AND BENTIG, CALAPE, BOHOL SECTION) LEADING TO PANGANGAN PROVINCIAL ROAD, CALAPE, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.097 |
| 59 | 20HA0033CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - KINABAG-AN TALISAY ROAD LEADING TO HAYAHAY BEACH RESORT AND TREASURE ISLAND RESORT, PANGANGAN, CALAPE, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.097 |
| 60 | 24HB0155CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (CANDIJAY SPORTS COMPLEX), BRGY. POBLACION, CANDIJAY, BOHO | Region VII | Bohol 3rd DEO | On-Going | ₱29.6M | 91% | Medium risk46 | —-0.043 |
| 61 | 21HA0084CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - CANGUHA-SAMPOANGON ROAD CONNECTING TAGBILARAN NORTH ROAD AND MARIBOJOC-ANTEQUEARA-CATAGBACAN ROAD IN SUPPORT TO GIFTS AND HOUSEWARES AND AGRIBUSINESS INDUSTRIES, C | Region VII | Bohol 1st DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.094 |
| 62 | 19HA0071CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - CANGUHA-SAMPOANGON ROAD CONNECTING TAGBILARAN NORTH ROAD AND MARIBOJOC-ANTEQUERA-CATAGBACAN ROAD IN SUPPORT TO GIFTS AND HOUSEWARES AND AGRI-BUSINESS INDUSTRIES, C | Region VII | Bohol 1st DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.096 |
| 63 | 20HA0072CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - CANGUHA-SAMPOANGON ROAD CONNECTING TAGBILARAN NORTH ROAD AND MARIBOJOC-ANTEQUERA-CATAGBACAN ROAD IN SUPPORT TO GIFTS AND HOUSEWARES AND AGRIBUSINESS INDUSTRIES, C | Region VII | Bohol 1st DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.096 |
| 64 | 19HA0067CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - CAMIAS-SOHOTON ROAD CONNECTING TAGBILARAN NORTH ROAD AND PROVINCIAL ROAD UBUJAN-CAMIAS IN SUPPORT TO GIFTS AND HOUSEWARES AND AGRIBUSINESS INDUSTRY, CALAPE, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.098 |
| 65 | 19HA0010CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - MARIBOJOC-PAGNITOAN-CANDAVID-BASAK (LOON) PROVICIAL ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, MARIBOJOC, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱9.5M | 100% | Medium risk45 | —-0.096 |
| 66 | 20HA0038CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - MARIBOJOC - PAGNITOAN -CANDAVID -BASAK (LOON) PROVINCIAL ROAD IN SUPPORT TO THE AGRIBUSINESS INDUSTRY, MARIBOJOC, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱9.4M | 100% | Medium risk45 | —-0.097 |
| 67 | 18HA0134CONSTRUCTION OF 1 UNIT 4-STOREY 8 LABORATORY BUILDING, CAWAYANAN NATIONAL HIGH SCHOOL, TUBIGON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱39.7M | 100% | Medium risk45 | —-0.044 |
| 68 | 23GO0033CONSTRUCTION OF DRAINAGE SYSTEM, HILADO ST., BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.068 |
| 69 | 19HC0175CONSTRUCTION OF BRGY. DATAG TO BRGY. NABUAD ROAD INABANGA, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱38M | 100% | Medium risk45 | —-0.095 |
| 70 | 22HB0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG) ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF BATUAN - OMJON ROAD, (BATUAN | Region VII | Bohol 3rd DEO | Completed | ₱29.4M | 100% | Medium risk45 | —-0.095 |
| 71 | 21HA0187CONSTRUCTION/COMPLETION OF 4STY - 12CL SCHOOL BUILDING FELIX E. BOMPAT HIGH SCHOOL, PANGLAO, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱37.4M | 100% | Medium risk45 | —-0.027 |
| 72 | 21HC0021002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF INABANGA FLOOD CONTROL INABANGA, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱38.7M | 100% | Medium risk45 | —-0.063 |
| 73 | 21HB0192CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) TANABOG, BRGY. CADAPDAPAN, CANDIJAY, BOHOL (COMPLETION) IN SUPPORT TO CAN-UMANTAD FALLS | Region VII | Bohol 3rd DEO | Completed | ₱29.4M | 100% | Medium risk44 | —-0.093 |
| 74 | 20HC0170CONCRETING OF BONOT-BONOT ROAD, BRGY. BONOT-BONOT, BUENAVISTA, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱28.4M | 100% | Medium risk44 | —-0.094 |
| 75 | 25GO0031CONSTRUCTION OF CONCRETE ROAD - JUNCTION HERNAEZ ST. TO BANGGA VISTA ALEGRE ROAD IN SUPPORT OF MICRO FOOD PROCESSING INDUSTRY, BRGY. VISTA ALEGRE, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱12.2M | 100% | Medium risk44 | —-0.092 |