Contractor dossier
74 projects on file, including joint ventures this contractor is part of.
Total projects
74
Total budget
₱1.5B
Average progress
97.5%
Completion rate
83.8%
Average risk score
46.8
Medium risk on average, out of 100
Flagged as unusual
4
5.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 74 | ₱1.5B | 46.8 | 4 | 97.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 39 | ₱878.1M | 43.7 | 1 | 99.1% |
| Buildings and Facilities | 17 | ₱138.7M | 35.3 | 0 | 100.0% |
| Flood Control and Drainage | 8 | ₱310.2M | 50.7 | 0 | 100.0% |
| GAA 2025 SSP | 5 | ₱101.9M | 94.4 | 3 | 72.5% |
| Bridges | 4 | ₱49M | 47.1 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱46.6M | 92.8 | 0 | 90.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0104REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG QUIRINO H-WAY - K0255+400 - K0255+553, K0255+610 - K0255+862, K0258+720 - K0258+886.50, K0259+378 - K0259+684, K0259+883 - K0259+910 | Region IV-A | Quezon 4th DEO | On-Going | ₱38.3M | 97% | High risk95 | —-0.007 |
| 25DL0165CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BOCBOC CORE ROAD (LIPUTIHAN TO BRGY HALL TO BU | Region IV-A | Quezon 4th DEO | On-Going | ₱24.3M | 28% | High risk95 | Flagged0.013 |
| 25DM0148CONSTRUCTION OF ROAD, BRGY. SAN VICENTE, SAN NARCISO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱19.8M | 61% | High risk95 | Flagged0.008 |
| 25DM0149CONSTRUCTION OF ROAD, BARANGAY BINAY, SAN NARCISO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.9M | 100% | High risk94 | —-0.008 |
| 25DM0137CONSTRUCTION OF ROAD, BARANGAY LAKDAYAN, SAN NARCISO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.6M | 76% | High risk94 | Flagged0.002 |
| 25DL0117ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GUINAYANGAN-TAGKAWAYAN DIVERSION ROAD, TAGKAWAYAN, PACKAGE A, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱46.6M | 90% | High risk93 | —-0.012 |
| 20DL0018C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 3. ACCESS ROAD LEADING TO KABAKAN FALLS, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.069 |
| 24DL0183(SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF GUINAYANGAN - TAGKAWAYAN ROAD (SAN ROQUE - SEGUIWAN - KATIMO - KINATAKUTAN SECTION), TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱112M | 66% | High risk66 | Flagged0.009 |
| 23DM0041CONSTRUCTION OF SEAWALL AT BARANGAY MARAO (PACKAGE 2), PADRE BURGOS, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 24DM0037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PIRIS RIVER, BUENAVISTA, PACKAGE 1, QUEZON, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.070 |
| 23DL0107CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, 17. CONSTRUCTION/ IMPROVEMENT OF ACCESS R | Region IV-A | Quezon 4th DEO | Completed | ₱106.2M | 100% | High risk60 | —-0.091 |
| 23DL0166CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM, BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES 15. REHABILITATION OF SUMULONG-GUINAYANGAN ROAD, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱99M | 100% | High risk60 | —-0.091 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0165CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BOCBOC CORE ROAD (LIPUTIHAN TO BRGY HALL TO BU | Region IV-A | Quezon 4th DEO | On-Going | ₱24.3M | 28% | High risk95 | Flagged0.013 |
| 24DL0183(SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF GUINAYANGAN - TAGKAWAYAN ROAD (SAN ROQUE - SEGUIWAN - KATIMO - KINATAKUTAN SECTION), TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱112M | 66% | High risk66 | Flagged0.009 |
| 25DM0148CONSTRUCTION OF ROAD, BRGY. SAN VICENTE, SAN NARCISO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱19.8M | 61% | High risk95 | Flagged0.008 |
| 25DM0137CONSTRUCTION OF ROAD, BARANGAY LAKDAYAN, SAN NARCISO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.6M | 76% | High risk94 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24DL0125ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS 2. QUIRINO H-WAY - K0272 + 200 - K0272 + 230, K0274 + 9 | Region IV-A | Quezon 4th DEO | On-Going | ₱33.5M | 100% | Medium risk47 | —-0.067 |
| 27 | 22DL0125BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF QUIRINO HIGHWAY-MUNTING PARANG ROAD, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱29.7M | 100% | Medium risk47 | —-0.105 |
| 28 | 24DL0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 1. INSTALLATION OF ROAD SIGNS ALONG QUIRINO H-WAY - K0251+(-511) - K0281+185 | Region IV-A | Quezon 4th DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.105 |
| 29 | 24DL0016ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 5. CONSTRUCTION OF BREAKWATER, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱24.5M | 100% | Medium risk47 | —-0.087 |
| 30 | 21DL0054ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BREAKWATER, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱37.8M | 100% | Medium risk46 | —-0.085 |
| 31 | 24DL0067ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 22. REHABILITATION OF DRAINAGE STRUCTURE ALONG BARANGAY POBLACION, TAGKAW | Region IV-A | Quezon 4th DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.085 |
| 32 | 23DL0158CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES 1. CONSTRUCTION OF SLOPE PROTECTION AT BRGY. MUNTING PARANG, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.086 |
| 33 | 23DL0151CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES 2. CONSTRUCTION OF SLOPE PROTECTION, RESILIENCY COMPLEX, BRGY. MUNTING PARANG, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱10.7M | 100% | Medium risk46 | —-0.086 |
| 34 | 25DL0054CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), ECOTOURISM ROAD LEADING TO MAGUIBUAY FALLS, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | Medium risk46 | —-0.078 |
| 35 | 24DL0042CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) 7. ACCESS ROAD LEADING TO PRISTINE BEACHES, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.103 |
| 36 | 20DL0020C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 8. ACCESS ROAD LEADING TO PRISTINE BEACHES, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.103 |
| 37 | 25DL0003CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), ACCESS ROAD LEADING TO PRISTINE BEACHES, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.104 |
| 38 | 24DL0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) 3. ACCESS ROAD LEADING TO KABAKAN FALLS, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.104 |
| 39 | 24DL0001CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) 12. ECOTOURISM ROAD LEADING TO MAGUIBUAY FALLS, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.104 |
| 40 | 22DL0036ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BREAKWATER, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.086 |
| 41 | 25DL0004CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), ACCESS ROAD LEADING TO KABAKAN FALLS, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.8M | 100% | Medium risk46 | —-0.078 |
| 42 | 25DL0116ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - PRIMARY ROADS, QUIRINO H-WAY - K0258 +513 - K0258 +655, K0258 +679 - K0259 +320 | Region IV-A | Quezon 4th DEO | On-Going | ₱23.2M | 100% | Medium risk46 | —-0.078 |
| 43 | 19DL0215REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG QUIRINO HIGHWAY K0253+300 - K0253+400, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱28M | 100% | Medium risk46 | —-0.105 |
| 44 | 20DL0119A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 1. ASSET PRESERVATION PROGRAM C. REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE 1. PRIMARY ROADS 3. QUIRINO H-WAY - K0255+350 - K0255+400 | Region IV-A | Quezon 4th DEO | Completed | ₱20.9M | 100% | Medium risk46 | —-0.106 |
| 45 | 22DL0089SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MALBOG-CABUGWANG ROAD, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.106 |
| 46 | 25DL0115ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - PRIMARY ROADS, QUIRINO H-WAY - K0251 + 591 - K0251 + 823, K0251 + 933 - K0252 + 096, K0252 + 192 - K0252 + 452 | Region IV-A | Quezon 4th DEO | On-Going | ₱18.5M | 100% | Medium risk46 | —-0.078 |
| 47 | 22DL0126BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ACCESS ROAD, TAGKAWAYAN NATIONAL HIGH SCHOOL (TNHS), TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱15.8M | 100% | Medium risk46 | —-0.106 |
| 48 | 19DL0053C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 20. ACCESS ROAD LEADING TO PRISTINE BEACHES, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱7.6M | 100% | Medium risk46 | —-0.103 |
| 49 | 19DL0051C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 18. ACCESS ROAD LEADING TO KABAKAN FALLS, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.103 |
| 50 | 20DL0038C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 3. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES 6. ACCESS ROADS TO QUIRINO HIGHWAY IN SUPPORT OF AGRI-BASED INDUSTRIES, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱8M | 100% | Medium risk46 | —-0.104 |