Contractor dossier
204 projects on file, including joint ventures this contractor is part of.
Total projects
204
Total budget
₱12.4B
Average progress
87.3%
Completion rate
77.9%
Average risk score
43.9
Medium risk on average, out of 100
Flagged as unusual
22
10.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 167 | ₱11B | 42.0 | 9 | 92.4% |
| Region VII | 18 | ₱365.2M | 46.2 | 3 | 73.6% |
| Region IX | 12 | ₱669.4M | 69.0 | 10 | 41.7% |
| Region XII | 4 | ₱260.3M | 33.9 | 0 | 82.8% |
| Region VIII | 3 | ₱146.1M | 52.1 | 0 | 76.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 150 | ₱9.9B | 42.3 | 7 | 91.3% |
| Flood Control and Drainage | 22 | ₱1.5B | 45.6 | 3 | 75.6% |
| Bridges | 11 | ₱465.6M | 46.2 | 5 | 73.9% |
| Buildings and Facilities | 8 | ₱104.4M | 34.1 | 0 | 95.4% |
| Water Provision and Storage | 6 | ₱195.8M | 47.4 | 3 | 48.5% |
| OTHER | 5 | ₱238.1M | 74.8 | 3 | 88.7% |
| GAA 2025 SSP | 1 | ₱9.8M | 94.9 | 1 | 67.8% |
| GAA 2025 OO-2 | 1 | ₱14.7M | 85.7 | 0 | 80.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NF0006CONSTRUCTION OF ROAD, BARANGAY SANTA FE, GENERAL LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱9.8M | 68% | High risk95 | Flagged0.022 |
| 25JB0053CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF RIVER BANK PROTECTION WORKS SAN ISIDRO CIS, SERGIO OSMEÑA SR., ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱14.7M | 80% | High risk86 | —-0.011 |
| 24NF0110CONSTRUCTION OF DRAINAGE SYSTEM, PACKAGE 1, DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱96.4M | 93% | High risk80 | Flagged0.017 |
| 21JD0027WIDENING OF PERMANENT BRIDGES BIAYON PARALLEL BRIDGE ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSMEÑA ZAMBO. NORTE/SUR BDRY ROAD | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱38.2M | 79% | High risk77 | Flagged0.030 |
| 24NF0117CONSTRUCTION OF NRJ SOCORRO - NUEVA ESTRELLA - SUDLON - SOHOTON COVE SLOPE PROTECTION STRUCTURE, PACKAGE 2, SOCORRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱67.5M | 72% | High risk77 | Flagged0.014 |
| 20JD0015REPLACEMENT OF PERMANENT WEAK BRIDGES ISIS BRIDGE (BOO4196MN) ALONG ILAYA-ISIS-POLANCO ROAD (PHASE II) | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱31M | 100% | High risk77 | —-0.028 |
| 24JA0168CONSTRUCTION OF GUIWAN-TUGBUNGAN-DIVISORIA BY-PASS ROAD PACKAGE 2, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.4M | 0% | High risk75 | Flagged0.038 |
| 24JA0150CONSTRUCTION OF PUTIK-TUMAGA BY-PASS ROAD ZAMBOANGA CITY PACKAGE 2 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱101.2M | 0% | High risk75 | Flagged0.041 |
| 24JA0149CONSTRUCTION OF PUTIK-TUMAGA BY-PASS ROAD ZAMBOANGA CITY PACKAGE 1 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱101.2M | 0% | High risk75 | Flagged0.041 |
| 22J00020WIDENING OF PERMANENT BRIDGES - DE VENTA PERLA BRIDGE (B01606MN) ALONG DIPOLOG - PUNTA - DANSULLAN - S. OSMEÑA ROAD ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD | Region IX | Region IX | On-Going | ₱101.3M | 32% | High risk72 | Flagged0.022 |
| 21J00061CONSTRUCTION OF BRIDGE - BARANGAY SAN JUAN - DAMPALAN - SAN ISIDRO ROAD CONNECTING NATIONAL ROAD AND MARAPONG IN SUPPORT OF RUBBER, COCONUT AND ABACA INDUSTRIES, SERGIO OSMEÑA, ZAMBOANGA DEL NORTE, PACKAGE II | Region IX | Region IX | On-Going | ₱97.2M | 29% | High risk69 | Flagged0.007 |
| 24JA0151CONSTRUCTION OF PUTIK-TUMAGA BY-PASS ROAD ZAMBOANGA CITY PACKAGE 3 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱53M | 0% | High risk65 | Flagged0.033 |
| 25NF0094CONSTRUCTION OF FLOOD CONTROL-DRAINAGE SYSTEM, DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱63.7M | 0% | High risk65 | Flagged0.016 |
| 21HN0120CONST/IMPRV'T.OF ACCESS RDS.LEADING TO TRADES, INDSTS & ECO ZONES (ROADS LEVERAGNG LINKAGES FOR INDUSTRY & TRADE INFRASTRCTURE PROG-ROLL-IT)-M.CENIZA ST.CONNECTING M. L. QUEZON ST.IN SUPPORT TO MANUFACTRG INDUSTRY, BRGY.CASUNTINGAN, BRGY. MAGUIKAY,MANDAUE | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | High risk62 | —-0.033 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24JA0150CONSTRUCTION OF PUTIK-TUMAGA BY-PASS ROAD ZAMBOANGA CITY PACKAGE 2 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱101.2M | 0% | High risk75 | Flagged0.041 |
| 24JA0149CONSTRUCTION OF PUTIK-TUMAGA BY-PASS ROAD ZAMBOANGA CITY PACKAGE 1 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱101.2M | 0% | High risk75 | Flagged0.041 |
| 24JA0168CONSTRUCTION OF GUIWAN-TUGBUNGAN-DIVISORIA BY-PASS ROAD PACKAGE 2, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.4M | 0% | High risk75 | Flagged0.038 |
| 24JA0151CONSTRUCTION OF PUTIK-TUMAGA BY-PASS ROAD ZAMBOANGA CITY PACKAGE 3 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱53M | 0% | High risk65 | Flagged0.033 |
| 21JD0027WIDENING OF PERMANENT BRIDGES BIAYON PARALLEL BRIDGE ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSMEÑA ZAMBO. NORTE/SUR BDRY ROAD | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱38.2M | 79% | High risk77 | Flagged0.030 |
| 25NF0006CONSTRUCTION OF ROAD, BARANGAY SANTA FE, GENERAL LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱9.8M | 68% | High risk95 | Flagged0.022 |
| 22J00020WIDENING OF PERMANENT BRIDGES - DE VENTA PERLA BRIDGE (B01606MN) ALONG DIPOLOG - PUNTA - DANSULLAN - S. OSMEÑA ROAD ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD | Region IX | Region IX | On-Going | ₱101.3M | 32% | High risk72 | Flagged0.022 |
| 21JD0029REPLACEMENT OF PERMANENT WEAK BRIDGES ISIS BRIDGE (BO0419MN) ALONG ILAYA-ISIS-POLANCO ROAD (PHASE III),ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱6.7M | 42% | Medium risk53 | Flagged0.017 |
| 21JD0067WIDENING OF PERMANENT BRIDGES, NIPAAN BRIDGE (BO0414MN) ALONG DIPOLOG-POLANCO-PIÑAN-JCT. OROQUIETA ROAD (PHASE III) | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱9.5M | 47% | Medium risk53 | Flagged0.017 |
| 24NF0110CONSTRUCTION OF DRAINAGE SYSTEM, PACKAGE 1, DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱96.4M | 93% | High risk80 | Flagged0.017 |
| 25NF0094CONSTRUCTION OF FLOOD CONTROL-DRAINAGE SYSTEM, DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱63.7M | 0% | High risk65 | Flagged0.016 |
| 24NF0117CONSTRUCTION OF NRJ SOCORRO - NUEVA ESTRELLA - SUDLON - SOHOTON COVE SLOPE PROTECTION STRUCTURE, PACKAGE 2, SOCORRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱67.5M | 72% | High risk77 | Flagged0.014 |
| 23HH0155CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION / REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY SIN SIN, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱9.7M | 0% | Medium risk50 | Flagged0.008 |
| 23HH0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY SUDLON I, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱9.7M | 0% | Medium risk50 | Flagged0.008 |
| 23HH0147CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY BON BON, CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱9.7M | 0% | Medium risk50 | Flagged0.008 |
| 25NF0041REPLACEMENT OF PERMANENT WEAK BRIDGE, MAASIN BR. (B00012SG) ALONG JCT. OSMENA-PILAR RD. | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱20.3M | 2% | Medium risk42 | Flagged0.007 |
| 25NF0072CONSTRUCTION OF UNION-BUTONG-CONSUELO ROAD, DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱93.6M | 6% | Medium risk53 | Flagged0.007 |
| 21J00061CONSTRUCTION OF BRIDGE - BARANGAY SAN JUAN - DAMPALAN - SAN ISIDRO ROAD CONNECTING NATIONAL ROAD AND MARAPONG IN SUPPORT OF RUBBER, COCONUT AND ABACA INDUSTRIES, SERGIO OSMEÑA, ZAMBOANGA DEL NORTE, PACKAGE II | Region IX | Region IX | On-Going | ₱97.2M | 29% | High risk69 | Flagged0.007 |
| 25NF0095REHABILITATION OF ROAD AT BARANGAY TUBURAN TO BARANGAY MAHAYAHAY, DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱96.4M | 0% | Medium risk54 | Flagged0.006 |
| 21JD0042WIDENING OF PERMANENT BRIDGES POLANCO BRIDGE (BO0418MN) ALONG DIPOLOG-POLANCO-PIÑAN JCT. OROQUIETA ROAD (PHASE II) | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱19M | 90% | Medium risk53 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 18N00071REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, JCT. OSMEÑA-PILAR RD-K0019+216-K0019+460, K0019+565-K0019+615, PILAR, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱170.2M | 100% | Medium risk51 | —-0.056 |
| 27 | 23HH0155CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION / REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY SIN SIN, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱9.7M | 0% | Medium risk50 | Flagged0.008 |
| 28 | 17N00175CONSTRUCTION OF SAYAK - DOMOYOG - SAN FERNANDO ROAD, DEL CARMEN SIARGAO, SURIGAO DEL NORTE, SIARGAO ISLAND, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱87.5M | 100% | Medium risk50 | —-0.037 |
| 29 | 22NF0053CONSTRUCTION OF SEAWALL, BARANGAY 11, BARANGAY 12 AND BARANGAY 13 DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱95.5M | 100% | Medium risk50 | —-0.052 |
| 30 | 23HH0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY SUDLON I, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱9.7M | 0% | Medium risk50 | Flagged0.008 |
| 31 | 23HH0147CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY BON BON, CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱9.7M | 0% | Medium risk50 | Flagged0.008 |
| 32 | 23HH0151CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM -CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY TAGBA-O, CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱9.7M | 91% | Medium risk50 | —-0.014 |
| 33 | 23M00027ROAD WIDENING - MATALAM-LAMPAYAN-ANTIPAS RD, K1646+739 - K1649+907, K1649+1057 - K1649+1344, MATALAM, NORTH COTABATO | Region XII | Region XII | On-Going | ₱112.6M | 31% | Medium risk50 | —-0.012 |
| 34 | 18NG0089CONSTRUCTION OF FLOOD CONTROL SYSTEM, BRGY. TUBORAN, DEL CARMEN, SIARGAO, SURIGAO DEL NORTE DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱95M | 100% | Medium risk49 | —-0.053 |
| 35 | 25NF0061CONSTRUCTION / INSTALLATION OF SOLAR LIGHTS WITH SAFETY SIGNS AND DEVICES, GENERAL LUNA - CATANGNAN (CLOUD 9), GENERAL LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱93.6M | 7% | Medium risk49 | —-0.021 |
| 36 | 25NF0009CONSTRUCTION OF SHORE PROTECTION ALONG BARANGAY RIZAL, SOCORRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱96.4M | 6% | Medium risk49 | Flagged0.002 |
| 37 | 21HB0157ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF LOBOC RIVER CONTROL, BARANGAY | Region VII | Bohol 3rd DEO | Completed | ₱48.9M | 100% | Medium risk49 | —-0.071 |
| 38 | 21IJ0047ROAD WIDENING - PRIMARY ROADS, DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR), KO756+000 - KO756+786, KO756+807 - KO757+000, KO764+000 - KO764+120 | Region VIII | Samar 1st DEO | Completed | ₱34.6M | 100% | Medium risk49 | —-0.082 |
| 39 | 22HB0096ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM- CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE (PACKAGE 3) BARANGAY JIMILI-AN L | Region VII | Bohol 3rd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.062 |
| 40 | 25NF0029CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG BARANGAY SALVACION, PILAR, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱96.4M | 60% | Medium risk48 | —-0.040 |
| 41 | 24NF0026PREVENTIVE MAINTENANCE - SECONDARY ROADS ASPHALT OVERLAY ALONG BRGY. TAWIN-TAWIN DAPA-GEN. LUNA RD, GENERAL LUNA, SURIGAO DEL NORTE (PHASE 2) | Region XIII | Surigao del Norte 1st DEO | Completed | ₱144.6M | 100% | Medium risk48 | —-0.067 |
| 42 | 22NF0044CONSTRUCTION OF SEAWALL, BARANGAY 1 AND BARANGAY 2 DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱95.5M | 100% | Medium risk48 | —-0.052 |
| 43 | 24NF0122PREVENTIVE MAINTENANCE-TERTIARY ROADS JCT CANCOHOY - PILAR ROAD - K0037+500 - K0039+000 | Region XIII | Surigao del Norte 1st DEO | Completed | ₱125.4M | 100% | Medium risk48 | —-0.014 |
| 44 | 22NF0026CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG NRJ CONSUELO-CORAZON-STA. CRUZ-STA.FE-LIBERTAD ROAD, GENERAL LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱95.5M | 100% | Medium risk48 | —-0.074 |
| 45 | 25NF0019CONSTRUCTION OF SHORE PROTECTION STRUCTURE ALONG BARANGAY TARUC, SOCORRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱96.4M | 7% | Medium risk47 | Flagged0.002 |
| 46 | 22NF0004CONSTRUCTION OF ROAD, BRGY. CORAZON, GENERAL LUNA TO BRGY. KATIPUNAN, PILAR, SIARGAO ISLAND | Region XIII | Surigao del Norte 1st DEO | Completed | ₱95.5M | 100% | Medium risk47 | —-0.075 |
| 47 | 25NF0068CONSTRUCTION / INSTALLATION OF SOLAR STREET LIGHTS WITH SAFETY SIGNS AND DEVICES, JCT. CANCOHOY - PILAR K0019+(-449) - K0026+000 ROAD, DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱93.6M | 50% | Medium risk47 | —-0.038 |
| 48 | 25NF0062CONSTRUCTION / INSTALLATION OF SOLAR STREET LIGHTS WITH SAFETY SIGNS AND DEVICES, JCT. DEL CARMEN - STA. MONICA - SAN ISIDRO K0062+000 - K0068+627 ROAD, SAN ISIDRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱93.6M | 50% | Medium risk47 | —-0.038 |
| 49 | 25HH0060CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF REVETMENT ALONG LUSARAN RIVER, BARANGAY TAGBAO, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱43.4M | 35% | Medium risk47 | —-0.022 |
| 50 | 24NF0054IMPROVEMENT OF ROAD ALONG DON PAULINO TO SITIO LOBO, PHASE2, DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱95.1M | 100% | Medium risk47 | —-0.074 |