Opening the dossier…
Opening the dossier…
Contractor dossier
204 projects on file, including joint ventures this contractor is part of.
Total projects
204
Total budget
₱12.4B
Average progress
87.3%
Completion rate
77.9%
Average risk score
43.9
Medium risk on average, out of 100
Flagged as unusual
22
10.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 167 | ₱11B | 42.0 | 9 | 92.4% |
| Region VII | 18 | ₱365.2M | 46.2 | 3 | 73.6% |
| Region IX | 12 | ₱669.4M | 69.0 | 10 | 41.7% |
| Region XII | 4 | ₱260.3M | 33.9 | 0 | 82.8% |
| Region VIII | 3 | ₱146.1M | 52.1 | 0 | 76.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 150 | ₱9.9B | 42.3 | 7 | 91.3% |
| Flood Control and Drainage | 22 | ₱1.5B | 45.6 | 3 | 75.6% |
| Bridges | 11 | ₱465.6M | 46.2 | 5 | 73.9% |
| Buildings and Facilities | 8 | ₱104.4M | 34.1 | 0 | 95.4% |
| Water Provision and Storage | 6 | ₱195.8M | 47.4 | 3 | 48.5% |
| OTHER | 5 | ₱238.1M | 74.8 | 3 | 88.7% |
| GAA 2025 SSP | 1 | ₱9.8M | 94.9 | 1 | 67.8% |
| GAA 2025 OO-2 | 1 | ₱14.7M | 85.7 | 0 | 80.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NF0006CONSTRUCTION OF ROAD, BARANGAY SANTA FE, GENERAL LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱9.8M | 68% | High risk95 | Flagged0.022 |
| 25JB0053CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF RIVER BANK PROTECTION WORKS SAN ISIDRO CIS, SERGIO OSMEÑA SR., ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱14.7M | 80% | High risk86 | —-0.011 |
| 24NF0110CONSTRUCTION OF DRAINAGE SYSTEM, PACKAGE 1, DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱96.4M | 93% | High risk80 | Flagged0.017 |
| 21JD0027WIDENING OF PERMANENT BRIDGES BIAYON PARALLEL BRIDGE ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSMEÑA ZAMBO. NORTE/SUR BDRY ROAD | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱38.2M | 79% | High risk77 | Flagged0.030 |
| 24NF0117CONSTRUCTION OF NRJ SOCORRO - NUEVA ESTRELLA - SUDLON - SOHOTON COVE SLOPE PROTECTION STRUCTURE, PACKAGE 2, SOCORRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱67.5M | 72% | High risk77 | Flagged0.014 |
| 20JD0015REPLACEMENT OF PERMANENT WEAK BRIDGES ISIS BRIDGE (BOO4196MN) ALONG ILAYA-ISIS-POLANCO ROAD (PHASE II) | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱31M | 100% | High risk77 | —-0.028 |
| 24JA0168CONSTRUCTION OF GUIWAN-TUGBUNGAN-DIVISORIA BY-PASS ROAD PACKAGE 2, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.4M | 0% | High risk75 | Flagged0.038 |
| 24JA0150CONSTRUCTION OF PUTIK-TUMAGA BY-PASS ROAD ZAMBOANGA CITY PACKAGE 2 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱101.2M | 0% | High risk75 | Flagged0.041 |
| 24JA0149CONSTRUCTION OF PUTIK-TUMAGA BY-PASS ROAD ZAMBOANGA CITY PACKAGE 1 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱101.2M | 0% | High risk75 | Flagged0.041 |
| 22J00020WIDENING OF PERMANENT BRIDGES - DE VENTA PERLA BRIDGE (B01606MN) ALONG DIPOLOG - PUNTA - DANSULLAN - S. OSMEÑA ROAD ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD | Region IX | Region IX | On-Going | ₱101.3M | 32% | High risk72 | Flagged0.022 |
| 21J00061CONSTRUCTION OF BRIDGE - BARANGAY SAN JUAN - DAMPALAN - SAN ISIDRO ROAD CONNECTING NATIONAL ROAD AND MARAPONG IN SUPPORT OF RUBBER, COCONUT AND ABACA INDUSTRIES, SERGIO OSMEÑA, ZAMBOANGA DEL NORTE, PACKAGE II | Region IX | Region IX | On-Going | ₱97.2M | 29% | High risk69 | Flagged0.007 |
| 24JA0151CONSTRUCTION OF PUTIK-TUMAGA BY-PASS ROAD ZAMBOANGA CITY PACKAGE 3 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱53M | 0% | High risk65 | Flagged0.033 |
| 25NF0094CONSTRUCTION OF FLOOD CONTROL-DRAINAGE SYSTEM, DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱63.7M | 0% | High risk65 | Flagged0.016 |
| 21HN0120CONST/IMPRV'T.OF ACCESS RDS.LEADING TO TRADES, INDSTS & ECO ZONES (ROADS LEVERAGNG LINKAGES FOR INDUSTRY & TRADE INFRASTRCTURE PROG-ROLL-IT)-M.CENIZA ST.CONNECTING M. L. QUEZON ST.IN SUPPORT TO MANUFACTRG INDUSTRY, BRGY.CASUNTINGAN, BRGY. MAGUIKAY,MANDAUE | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | High risk62 | —-0.033 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24JA0150CONSTRUCTION OF PUTIK-TUMAGA BY-PASS ROAD ZAMBOANGA CITY PACKAGE 2 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱101.2M | 0% | High risk75 | Flagged0.041 |
| 24JA0149CONSTRUCTION OF PUTIK-TUMAGA BY-PASS ROAD ZAMBOANGA CITY PACKAGE 1 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱101.2M | 0% | High risk75 | Flagged0.041 |
| 24JA0168CONSTRUCTION OF GUIWAN-TUGBUNGAN-DIVISORIA BY-PASS ROAD PACKAGE 2, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.4M | 0% | High risk75 | Flagged0.038 |
| 24JA0151CONSTRUCTION OF PUTIK-TUMAGA BY-PASS ROAD ZAMBOANGA CITY PACKAGE 3 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱53M | 0% | High risk65 | Flagged0.033 |
| 21JD0027WIDENING OF PERMANENT BRIDGES BIAYON PARALLEL BRIDGE ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSMEÑA ZAMBO. NORTE/SUR BDRY ROAD | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱38.2M | 79% | High risk77 | Flagged0.030 |
| 25NF0006CONSTRUCTION OF ROAD, BARANGAY SANTA FE, GENERAL LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱9.8M | 68% | High risk95 | Flagged0.022 |
| 22J00020WIDENING OF PERMANENT BRIDGES - DE VENTA PERLA BRIDGE (B01606MN) ALONG DIPOLOG - PUNTA - DANSULLAN - S. OSMEÑA ROAD ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD | Region IX | Region IX | On-Going | ₱101.3M | 32% | High risk72 | Flagged0.022 |
| 21JD0029REPLACEMENT OF PERMANENT WEAK BRIDGES ISIS BRIDGE (BO0419MN) ALONG ILAYA-ISIS-POLANCO ROAD (PHASE III),ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱6.7M | 42% | Medium risk53 | Flagged0.017 |
| 21JD0067WIDENING OF PERMANENT BRIDGES, NIPAAN BRIDGE (BO0414MN) ALONG DIPOLOG-POLANCO-PIÑAN-JCT. OROQUIETA ROAD (PHASE III) | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱9.5M | 47% | Medium risk53 | Flagged0.017 |
| 24NF0110CONSTRUCTION OF DRAINAGE SYSTEM, PACKAGE 1, DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱96.4M | 93% | High risk80 | Flagged0.017 |
| 25NF0094CONSTRUCTION OF FLOOD CONTROL-DRAINAGE SYSTEM, DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱63.7M | 0% | High risk65 | Flagged0.016 |
| 24NF0117CONSTRUCTION OF NRJ SOCORRO - NUEVA ESTRELLA - SUDLON - SOHOTON COVE SLOPE PROTECTION STRUCTURE, PACKAGE 2, SOCORRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱67.5M | 72% | High risk77 | Flagged0.014 |
| 23HH0155CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION / REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS-WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY SIN SIN, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱9.7M | 0% | Medium risk50 | Flagged0.008 |
| 23HH0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY SUDLON I, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱9.7M | 0% | Medium risk50 | Flagged0.008 |
| 23HH0147CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM- CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY BON BON, CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱9.7M | 0% | Medium risk50 | Flagged0.008 |
| 25NF0041REPLACEMENT OF PERMANENT WEAK BRIDGE, MAASIN BR. (B00012SG) ALONG JCT. OSMENA-PILAR RD. | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱20.3M | 2% | Medium risk42 | Flagged0.007 |
| 25NF0072CONSTRUCTION OF UNION-BUTONG-CONSUELO ROAD, DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱93.6M | 6% | Medium risk53 | Flagged0.007 |
| 21J00061CONSTRUCTION OF BRIDGE - BARANGAY SAN JUAN - DAMPALAN - SAN ISIDRO ROAD CONNECTING NATIONAL ROAD AND MARAPONG IN SUPPORT OF RUBBER, COCONUT AND ABACA INDUSTRIES, SERGIO OSMEÑA, ZAMBOANGA DEL NORTE, PACKAGE II | Region IX | Region IX | On-Going | ₱97.2M | 29% | High risk69 | Flagged0.007 |
| 25NF0095REHABILITATION OF ROAD AT BARANGAY TUBURAN TO BARANGAY MAHAYAHAY, DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱96.4M | 0% | Medium risk54 | Flagged0.006 |
| 21JD0042WIDENING OF PERMANENT BRIDGES POLANCO BRIDGE (BO0418MN) ALONG DIPOLOG-POLANCO-PIÑAN JCT. OROQUIETA ROAD (PHASE II) | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱19M | 90% | Medium risk53 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 23NF0005CONSTRUCTION OF ROAD, BRGY. BONGDO TO BRGY. NUEVO CAMPO, SAN BENITO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱43M | 100% | Medium risk39 | —-0.072 |
| 152 | 23NF0060INSTALLATION OF SOLAR LIGHTS WITH SAFETY SIGNS AND DEVICES PHASE 2, PILAR, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱48.9M | 100% | Medium risk39 | —-0.080 |
| 153 | 24NF0033IMPROVEMENT OF ROAD, BRGY. BUHING KALIPAY - PELAEZ, SAN ISIDRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱39.5M | 100% | Medium risk39 | —-0.079 |
| 154 | 23NF0066REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS -SECONDARY ROADS DAPA-GEN. LUNA RD-K0001+(-960)-K0001+(-946), K0006+104-K0007+520,K0011+900-K0012+000 | Region XIII | Surigao del Norte 1st DEO | Completed | ₱50.7M | 100% | Medium risk39 | —-0.079 |
| 155 | 18NG0095CONSTRUCTION OF SAYAK TO DOMOYOG ROAD BRGY. DOMOYOG, DEL CARMEN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱48.4M | 100% | Medium risk39 | —-0.081 |
| 156 | 23NF0016CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION BRGY. TAWIN-TAWIN LEADING TO WORLD CLASS CLOUD 9 SURFING SPOT GENERAL LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱41.6M | 100% | Medium risk38 | —-0.067 |
| 157 | 20NF0015GENERAL LUNA-STA. INES-CATANGNAN BYPASS ROAD | Region XIII | Surigao del Norte 1st DEO | Completed | ₱43.7M | 100% | Medium risk38 | —-0.080 |
| 158 | 22NF0061CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SOCORRO-NUEVA ESTRELLA ROAD, SOCORRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱57.3M | 100% | Medium risk38 | —-0.081 |
| 159 | 21NF0018CONCRETING OF NRJ SOCORRO PORT-SONGKOY-SERING ROAD, (PACKAGE 3), SIARGAO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱59.9M | 100% | Medium risk38 | —-0.081 |
| 160 | 21NF0019CONCRETING OF NRJ SOCORRO PORT-SONGKOY-SERING ROAD, (PACKAGE 4), SIARGAO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱59.9M | 100% | Medium risk38 | —-0.081 |
| 161 | 21NF0012CONCRETING OF NRJ SOCORRO PORT-SONGKOY-SERING ROAD, (PACKAGE 1), SIARGAO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱59.9M | 100% | Medium risk38 | —-0.082 |
| 162 | 21NF0013CONCRETING OF NRJ SOCORRO PORT-SONGKOY-SERING ROAD, (PACKAGE 2), SIARGAO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱59.9M | 100% | Medium risk38 | —-0.082 |
| 163 | 25NF0010INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG DAPA-UNION-GEN LUNA RD. - K0015+(-395) - K0020+405 | Region XIII | Surigao del Norte 1st DEO | On-Going | ₱22.7M | 90% | Medium risk38 | —-0.050 |
| 164 | 24NF0036ACCESS ROAD LEADING TO MAASIN VIEW DECK, PILAR, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱9.7M | 100% | Medium risk38 | —-0.079 |
| 165 | 24NF0096ACCESS ROAD LEADING TO MAGPUPUNGKO ROCK FORMATION, PILAR, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱9.7M | 100% | Medium risk38 | —-0.079 |
| 166 | 24NF0055ACCESS ROAD LEADING TO FAMOUS CLOUD 9 SURFING SPOT, GENERAL LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱9.7M | 100% | Medium risk38 | —-0.079 |
| 167 | 19NF0035CONSTRUCTION OF STA. INES-BIL-AT-CATANGNAN ROAD (PHASE III), GEN. LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱9.5M | 100% | Medium risk38 | —-0.079 |
| 168 | 18NG0147CONSTRUCTION OF FLOOD CONTROL STRUCTURES BRGY. POBLACION 5 TO BRGY. POBLACION 3, GEN. LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱9.6M | 100% | Medium risk37 | —-0.062 |
| 169 | 24NF0038CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG JCT. SAN BENITO - STA. MONICA ROAD, SAN BENITO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱39.5M | 100% | Medium risk37 | —-0.066 |
| 170 | 21NF0092CONCRETING OF SITIO LOBO, BRGY. DON PAULINO FMR, BRGY. DON PAULINO, DAPA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱48.3M | 100% | Medium risk37 | —-0.022 |
| 171 | 25NF0003PREVENTIVE MAINTENANCE - TERTIARY ROADS - ASPHALT OVERLAY - JCT CANCOHOY - PILAR RD - K0019+030 - K0020+000 | Region XIII | Surigao del Norte 1st DEO | Completed | ₱39.3M | 100% | Medium risk37 | —-0.082 |
| 172 | 18NG0049CONSTRUCTION OF THE BARANGAY ROAD FROM BRGY. LIBERTAD PROPER TO SITIO CAN-UYAS BRGY. LIBERTAD, GEN. LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱4.8M | 100% | Medium risk37 | —-0.078 |
| 173 | 23NF0059REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS DAPA-JCT CANCOHOY RD-K0011+256-K0012+000, K0014+100-K0014+749 | Region XIII | Surigao del Norte 1st DEO | Completed | ₱37.2M | 100% | Medium risk37 | —-0.079 |
| 174 | 18NG0059COMPLETION OF BRGY. MAGSAYSAY TO BRGY. CABITOONAN ROAD (STA. 0+000 - 0+298), GENERAL LUNA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱14.4M | 100% | Medium risk37 | —-0.079 |
| 175 | 25NF0005PREVENTIVE MAINTENANCE - TERTIARY ROADS - ASPHALT OVERLAY - JCT. CANCOHOY - PILAR RD - K0028+859 - K0029+944 | Region XIII | Surigao del Norte 1st DEO | Completed | ₱43.2M | 100% | Medium risk37 | —-0.080 |