Contractor dossier
86 projects on file, including joint ventures this contractor is part of.
Total projects
86
Total budget
₱2.8B
Average progress
95.4%
Completion rate
91.9%
Average risk score
46.4
Medium risk on average, out of 100
Flagged as unusual
3
3.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 86 | ₱2.8B | 46.4 | 3 | 95.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 35 | ₱1.6B | 47.9 | 1 | 99.3% |
| Roads | 24 | ₱627.8M | 45.1 | 0 | 100.0% |
| Bridges | 15 | ₱256.2M | 47.1 | 0 | 81.3% |
| Buildings and Facilities | 7 | ₱42.7M | 24.4 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱43.7M | 94.6 | 2 | 54.3% |
| GAA 2025 OO-2 | 1 | ₱93.5M | 91.5 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱87.8M | 51.8 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱3.7M | 24.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BI0097BASIC INFRASTRUCTURE PROGRAM (BIP) MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES COMPLETION OF MULTI-PURPOSE BUILDING NUEVA VIZCAYA STATE UNIVERSITY (NVSU), BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | On-Going | ₱38.3M | 40% | High risk95 | Flagged0.023 |
| 25BI0044BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING, UDDIAWAN NATIONAL HIGH SCHOOL, BRGY. UDDIAWAN, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | On-Going | ₱5.4M | 69% | High risk95 | Flagged0.014 |
| 25BJ0023OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. CRUZ RIVER, BARANGAY GABUT, DUPAX DEL S | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱93.5M | 100% | High risk91 | —-0.006 |
| 17BI0015ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4(HDM-4)-BAGABAG DIV. RD. K0284+483-K0285+000, K0285+000-K07 | Region II | Nueva Vizcaya DEO | Completed | ₱42.9M | 100% | High risk66 | —-0.051 |
| 17BI0016ASSET PRESERVATION OF NATIONAL ROADS-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROAD, NUEVA VIZCAYA-IFUGAO ROAD, K0283+811-K0284+250, K0284+971-K0285+523, BAGABAG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱12.6M | 100% | High risk66 | —-0.054 |
| 17BI0013IMPROVEMENT/WIDENING OF NATIONAL ROADS-N1 DAANG MAHARLIKA (LZ) K0248+520-K0248+913, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱12.2M | 100% | High risk66 | —-0.055 |
| 25BJ0012OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. CRUZ RIVER, SITIO PALTUG, BARANGAY SAN F | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱93.7M | 95% | High risk62 | —-0.030 |
| 23BJ0030CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG MANGA RIVER, BITNONG SECTION, DUPAX DEL NORTE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 23BJ0031CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG BENAY RIVER, BAGUMBAYAN SECTION, DUPAX DEL SUR, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 24BJ0005PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS : CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG STA. FE RIVER, BALETE SECTION, STA. FE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.057 |
| 24BJ0006CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG BENAY RIVER, PALABOTAN SECTION, DUPAX DEL SUR, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.057 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BI0097BASIC INFRASTRUCTURE PROGRAM (BIP) MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES COMPLETION OF MULTI-PURPOSE BUILDING NUEVA VIZCAYA STATE UNIVERSITY (NVSU), BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | On-Going | ₱38.3M | 40% | High risk95 | Flagged0.023 |
| 25BI0044BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING, UDDIAWAN NATIONAL HIGH SCHOOL, BRGY. UDDIAWAN, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | On-Going | ₱5.4M | 69% | High risk95 | Flagged0.014 |
| 16BJ0077RESTORATION OF DAMAGED /COLLAPSED GABION REVETMENT, PINGKIAN REVETMENT # 20 PINGKIAN FLOOD CONTROL FACILITIES | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱5.3M | 100% | Medium risk54 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25BI0097BASIC INFRASTRUCTURE PROGRAM (BIP) MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES COMPLETION OF MULTI-PURPOSE BUILDING NUEVA VIZCAYA STATE UNIVERSITY (NVSU), BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | On-Going | ₱38.3M | 40% | High risk95 | Flagged0.023 |
| 2 | 25BI0044BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING, UDDIAWAN NATIONAL HIGH SCHOOL, BRGY. UDDIAWAN, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | On-Going | ₱5.4M | 69% | High risk95 | Flagged0.014 |
| 3 | 25BJ0023OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. CRUZ RIVER, BARANGAY GABUT, DUPAX DEL S | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱93.5M | 100% | High risk91 | —-0.006 |
| 4 | 17BI0015ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4(HDM-4)-BAGABAG DIV. RD. K0284+483-K0285+000, K0285+000-K07 | Region II | Nueva Vizcaya DEO | Completed | ₱42.9M | 100% | High risk66 | —-0.051 |
| 5 | 17BI0016ASSET PRESERVATION OF NATIONAL ROADS-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROAD, NUEVA VIZCAYA-IFUGAO ROAD, K0283+811-K0284+250, K0284+971-K0285+523, BAGABAG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱12.6M | 100% | High risk66 | —-0.054 |
| 6 | 17BI0013IMPROVEMENT/WIDENING OF NATIONAL ROADS-N1 DAANG MAHARLIKA (LZ) K0248+520-K0248+913, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱12.2M | 100% | High risk66 | —-0.055 |
| 7 | 25BJ0012OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. CRUZ RIVER, SITIO PALTUG, BARANGAY SAN F | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱93.7M | 95% | High risk62 | —-0.030 |
| 8 | 23BJ0030CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG MANGA RIVER, BITNONG SECTION, DUPAX DEL NORTE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 9 | 23BJ0031CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG BENAY RIVER, BAGUMBAYAN SECTION, DUPAX DEL SUR, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 10 | 24BJ0005PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS : CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG STA. FE RIVER, BALETE SECTION, STA. FE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.057 |
| 11 | 24BJ0006CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG BENAY RIVER, PALABOTAN SECTION, DUPAX DEL SUR, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.057 |
| 12 | 16BJ0077RESTORATION OF DAMAGED /COLLAPSED GABION REVETMENT, PINGKIAN REVETMENT # 20 PINGKIAN FLOOD CONTROL FACILITIES | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱5.3M | 100% | Medium risk54 | Flagged0.002 |
| 13 | 22BJ0042CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL ALONG SANTA CRUZ RIVER, SAN FABIAN SECTION, KAYAPA, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱91.5M | 100% | Medium risk53 | —-0.057 |
| 14 | 17BI0039CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES BONFAL BR. (B01232LZ) ALONG DAANG MAHARLIKA (LZ) BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱17.5M | 100% | Medium risk53 | —-0.024 |
| 15 | 17BI0021CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES ORIWONG BR. (BO1240LZ) ALONG DAANG MAHARLIKA (LZ), DIADI, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱14.8M | 100% | Medium risk52 | —-0.025 |
| 16 | 17BI0038CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES BUAYA BR. (B01244LZ) ALONG DAANG MAHARLIKA, DIADI, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱14.3M | 100% | Medium risk52 | —-0.025 |
| 17 | 23BJ0037NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, DUPAX DEL SUR BYPASS, NUEVA VIZCAYA, DUPAX DEL SUR, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱87.8M | 100% | Medium risk52 | —-0.056 |
| 18 | 17BI0018CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES ROSARIO BR. (BO1238LZ) ALONG DAANG MAHARLIKA (LZ) BAGABAG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱11.4M | 100% | Medium risk52 | —-0.028 |
| 19 | 17BI0019CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, LANOG BRIDGE (BO1262LZ) ALONG NUEVA VIZCAYA-IFUGAO RD., BAGABAG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱11.7M | 100% | Medium risk52 | —-0.025 |
| 20 | 25BJ0026OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD STRUCTURE ALONG TUBO RIVER, BARANGAY PUDI, KASIBU, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱88.9M | 86% | Medium risk51 | —-0.030 |
| 21 | 21BI0060001:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- TERTIARY ROAD, PAPAYA-MALABING-WANGAL-B | Region II | Nueva Vizcaya DEO | Completed | ₱72.4M | 100% | Medium risk51 | —-0.076 |
| 22 | 23BI0051OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION CONSTRUCTION UPGRADING REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS PRIMARY ROADS POBLACION, BAMBANG, NUEVA VIZCAYA SECTION 1 : STA. 0 + 000 STA. 0 + 533.85, SECTION 2: S | Region II | Nueva Vizcaya DEO | Completed | ₱77.2M | 100% | Medium risk50 | —-0.073 |
| 23 | 22BI0097ORGANIZATION OUTCOME 2: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM IMPROVEMENT OF MANAMTAM RIVER CONTROL ALONG MATUNO RIVER | Region II | Nueva Vizcaya DEO | Completed | ₱73.5M | 100% | Medium risk50 | —-0.064 |
| 24 | 23BI0123ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOODS MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM CONSTRUCTION OF SAN FERNANDO FLOOD CONTROL AT BRGY. SAN FER | Region II | Nueva Vizcaya DEO | Completed | ₱48.3M | 100% | Medium risk50 | —-0.016 |
| 25 | 24BI0102BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE FACILITY, (NUEVA VIZCAYA STATE UNIVERSITY SPORTS COMPLEX), BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱29.7M | 100% | Medium risk50 | —-0.079 |