Contractor dossier
2 projects on file, including joint ventures this contractor is part of.
Total projects
2
Total budget
₱9.9M
Average progress
100.0%
Completion rate
50.0%
Below 70%
Average risk score
59.1
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 2 | ₱9.9M | 59.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| OTHER | 1 | ₱5M | 72.0 | 0 | 100.0% |
| Flood Control and Drainage | 1 | ₱5M | 46.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DO0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE SYSTEM, BRGY. SAN JOSE, MORONG, | Region IV-A | Rizal 2nd DEO | On-Going | ₱5M | 100% | High risk72 | —-0.007 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24DO0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE SYSTEM, BRGY. SAN JOSE, MORONG, | Region IV-A | Rizal 2nd DEO | On-Going | ₱5M | 100% | High risk72 | —-0.007 |
| 2 | 24DO0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURES, MORONG, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.087 |