Contractor dossier
104 projects on file, including joint ventures this contractor is part of.
Total projects
104
Total budget
₱490.8M
Average progress
91.3%
Completion rate
72.1%
Average risk score
32.8
Medium risk on average, out of 100
Flagged as unusual
7
6.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 104 | ₱490.8M | 32.8 | 7 | 91.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 74 | ₱300.6M | 28.1 | 2 | 93.2% |
| Roads | 15 | ₱95.9M | 40.7 | 1 | 94.0% |
| Flood Control and Drainage | 7 | ₱44.7M | 38.9 | 0 | 86.0% |
| Water Provision and Storage | 4 | ₱17.1M | 32.1 | 1 | 75.0% |
| GAA 2025 SSP | 3 | ₱24.6M | 92.9 | 3 | 60.8% |
| Bridges | 1 | ₱7.9M | 47.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HN0024SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONST. OF ROAD WITH DRAINAGE FACILITIES, BARANGAY TABOK, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱14.7M | 47% | High risk95 | Flagged0.023 |
| 25HE0005CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY TULIC, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱7.9M | 73% | High risk94 | Flagged0.018 |
| 25HE0033CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TALAYTAY, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱2M | 63% | High risk90 | Flagged0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HN0024SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONST. OF ROAD WITH DRAINAGE FACILITIES, BARANGAY TABOK, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱14.7M | 47% | High risk95 | Flagged0.023 |
| 25HE0033CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TALAYTAY, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱2M | 63% | High risk90 | Flagged0.020 |
| 25HE0005CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY TULIC, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱7.9M | 73% | High risk94 | Flagged0.018 |
| 24HG0078CONSTRUCTION OF 3-STOREY 9-CLASSROOM SCHOOL BUILDING IN ARGAO NATIONAL HIGH SCHOOL, BARANGAY CANBANUA, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱39.7M | 65% | Medium risk48 | Flagged0.013 |
| 23HH0156CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY LUSARAN, CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱9.8M | 0% | Medium risk49 | Flagged0.008 |
| 25HE0094CONCRETING OF BRGY. EL PARDO FMR, BRGY. EL PARDO, BOLJOON, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱14.6M | 85% | Medium risk48 | Flagged0.005 |
| 23HG0067CONSTRUCTION OF 3STY9CL, LUNOP NATIONAL HIGH SCHOOL, BOLJOON, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱33.7M | 100% | Medium risk46 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25HN0024SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONST. OF ROAD WITH DRAINAGE FACILITIES, BARANGAY TABOK, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱14.7M | 47% | High risk95 | Flagged0.023 |
| 2 | 25HE0005CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY TULIC, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱7.9M | 73% | High risk94 | Flagged0.018 |
| 3 | 25HE0033CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TALAYTAY, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱2M | 63% | High risk90 | Flagged0.020 |
| 4 | 23HH0156CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY LUSARAN, CEBU CITY, CEBU | Region VII | Cebu City DEO | On-Going | ₱9.8M | 0% | Medium risk49 | Flagged0.008 |
| 5 | 23HH0041LOCAL PROGRAM - NATIONAL BUILDING PROGRAM -BUILDINGS AND OTHER STRUCTURES - MULTI PURPOSE / FACILITIES-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (CEBECO & MCWD I TRAINING CENTER), BARANGAY TALAMBAN, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱4.9M | 100% | Medium risk49 | —-0.096 |
| 6 | 24HH0001LOCAL PROGRAM-NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE / FACILITIES-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (CEBECO & MCWD I TRAINING CENTER), BARANGAY TALAMBAN, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 7 | 24HH0090CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BUDLA-AN, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱4.9M | 100% | Medium risk48 | —-0.054 |
| 8 | 25HN0063SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY TUGBONGAN, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 9 | 25HE0094CONCRETING OF BRGY. EL PARDO FMR, BRGY. EL PARDO, BOLJOON, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱14.6M | 85% | Medium risk48 | Flagged0.005 |
| 10 | 24HG0086CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LUNOP BRIDGE, BARANGAY LUNOP PROPER, BOLJOON, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱7.9M | 100% | Medium risk48 | —-0.022 |
| 11 | 23HG0046OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PUNGTOD FLOOD CONTROL, OSLOB, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱14.7M | 100% | Medium risk48 | —-0.076 |
| 12 | 24HG0078CONSTRUCTION OF 3-STOREY 9-CLASSROOM SCHOOL BUILDING IN ARGAO NATIONAL HIGH SCHOOL, BARANGAY CANBANUA, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱39.7M | 65% | Medium risk48 | Flagged0.013 |
| 13 | 24HG0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, LUNOP ELEMENTARY SCHOOL, BARANGAY LUNOP, BOLJOON, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱4.9M | 0% | Medium risk48 | —-0.016 |
| 14 | 24HG0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, EL PARDO NATIONAL HIGH SCHOOL, BARANGAY EL PARDO, BOLJOON, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱4.9M | 35% | Medium risk48 | —-0.030 |
| 15 | 24HG0054CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT CARITAS, BARANGAY GRANADA, BOLJOON, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.092 |
| 16 | 24HN0077CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TUGBONGAN, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱7.9M | 100% | Medium risk48 | —-0.096 |
| 17 | 24HG0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY POBLACION, ALCOY, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱4.9M | 100% | Medium risk48 | —-0.037 |
| 18 | 23HG0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF DRAINAGE SYSTEM, BARANGAY POBLACION, DALAGUETE, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.071 |
| 19 | 24HG0097CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TALAYTAY, ARGAO, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.094 |
| 20 | 18HH0014CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. BUHISAN, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.096 |
| 21 | 25HH0101CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY TALAMBAN, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱9.8M | 2% | Medium risk47 | —-0.012 |
| 22 | 20HH0018OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BRGY. TALAMBAN, CEBU | Region VII | Cebu City DEO | Completed | ₱7.4M | 100% | Medium risk47 | —-0.078 |
| 23 | 25HD0140CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONST (COMPLETION) OF MULTI-PURPOSE BUILDING, BUREAU OF JAIL MANAGEMENT AND PENOLOGY, BRGY TULAY, MINGLAN | Region VII | Cebu 1st DEO | Completed | ₱9.9M | 100% | Medium risk47 | —-0.095 |
| 24 | 24HG0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - POBLACION, ARGAO-USMAD-CANSUJE-LINUT-OD (VEGETABLE HIGHWAY) LEADING TO COAL MOUNTAIN | Region VII | Cebu 2nd DEO | On-Going | ₱4.9M | 100% | Medium risk46 | —-0.056 |
| 25 | 25HE0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY TULIC, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱4.9M | 68% | Medium risk46 | —-0.054 |