Contractor dossier
33 projects on file, including joint ventures this contractor is part of.
Total projects
33
Total budget
₱291.8M
Average progress
85.0%
Completion rate
36.4%
Below 70%
Average risk score
47.9
Medium risk on average, out of 100
Flagged as unusual
4
12.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 33 | ₱291.8M | 47.9 | 4 | 85.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 23 | ₱130.9M | 39.4 | 0 | 87.8% |
| GAA 2025 SSP | 4 | ₱13.6M | 93.1 | 4 | 68.4% |
| Roads | 3 | ₱21.7M | 38.3 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱91.6M | 92.4 | 0 | 70.1% |
| Water Provision and Storage | 1 | ₱9.6M | 49.1 | 0 | 100.0% |
| Flood Control and Drainage | 1 | ₱24.4M | 46.5 | 0 | 42.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IN0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY LIBAS ROAD, H | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IN0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAP (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY POBLACION DIST | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 94% | High risk95 | Flagged0.009 |
| 25IN0014FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SUBANGDAKU RIVER (ZONE 5 SEGMENT 4), SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱91.6M | 70% | High risk92 | —-0.001 |
| 25IN0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY UPPER BANTAWON, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 75% | High risk91 | Flagged0.016 |
| 25IN0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MALANGZA, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 5% | High risk91 | Flagged0.034 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IN0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MALANGZA, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 5% | High risk91 | Flagged0.034 |
| 25IN0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY UPPER BANTAWON, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 75% | High risk91 | Flagged0.016 |
| 25IN0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAP (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY POBLACION DIST | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 94% | High risk95 | Flagged0.009 |
| 25IN0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY LIBAS ROAD, H | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25IN0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY LIBAS ROAD, H | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 2 | 25IN0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAP (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY POBLACION DIST | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 94% | High risk95 | Flagged0.009 |
| 3 | 25IN0014FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SUBANGDAKU RIVER (ZONE 5 SEGMENT 4), SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱91.6M | 70% | High risk92 | —-0.001 |
| 4 | 25IN0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY UPPER BANTAWON, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 75% | High risk91 | Flagged0.016 |
| 5 | 25IN0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MALANGZA, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 5% | High risk91 | Flagged0.034 |
| 6 | 25IN0043LOCAL PROGRAM (LP) - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF DPWH MULTI-PURPOSE BUILDING (PHASE 1), SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱19.3M | 49% | Medium risk52 | —-0.039 |
| 7 | 23I00031BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (LOCAL GOVERNMENT UNIT), ANAHAWAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱9.9M | 100% | Medium risk51 | —-0.046 |
| 8 | 23I00154CONSTRUCTION OF STAFF HOUSE DPWH SOUTHERN LEYTE, 2ND DEO, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱14.4M | 100% | Medium risk51 | —-0.095 |
| 9 | 25IN0044LOCAL PROGRAM (LP) - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF DPWH QAS BUILDING (PHASE 2), SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱11.6M | 77% | Medium risk50 | —-0.051 |
| 10 | 23I00153BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF QAS BUILDING, DPWH SOUTHERN LEYTE 2ND DEO, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱11.6M | 100% | Medium risk50 | —-0.094 |
| 11 | 23I00028BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LABRADOR, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱4.9M | 100% | Medium risk50 | —-0.095 |
| 12 | 23I00135CLUSTER 20: 1. CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY ZONE 1, SOGOD, SOUTHERN LEYTE; 2. CONVERG | Region VIII | Region VIII | Completed | ₱7.9M | 100% | Medium risk49 | —-0.095 |
| 13 | 23I00158CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE, RAIN WATER COLLECTORS - CONSTRUCTION OF SOLAR WATER SYSTEM, LILOAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱9.6M | 100% | Medium risk49 | —-0.016 |
| 14 | 23I00146CLUSTER 23: 1. BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION OF MULTI-PURPOSE BUILDING, BARANGAY BONGAWISAN, SAN FRANCISCO, SOUTHERN LEYTE; AND OTHER FOUR (4) PROJECTS | Region VIII | Region VIII | Completed | ₱13.8M | 100% | Medium risk48 | —-0.093 |
| 15 | 23I00122SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF LOCAL ROAD, PLARIDEL TO MANIGAWONG, BARANGAY PLARIDEL, HINUNDAYAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱6.8M | 100% | Medium risk47 | —-0.049 |
| 16 | 23I00035BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION/MAJOR REPAIR OF MULTI-PURPOSE BUILDING - REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY MARAYAG, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱4.9M | 100% | Medium risk47 | —-0.095 |
| 17 | 25IN0069FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION, BARANGAY TAMPOONG, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱24.4M | 42% | Medium risk47 | —-0.023 |
| 18 | 23I00041BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CALIAN, LILOAN, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱4.9M | 100% | Medium risk46 | —-0.095 |
| 19 | 23I00142CONCRETING OF BRGY. CARNAGA TO BRGY. MANLICO FMR, BRGY. CARNAGA AND BRGY. MANLICO, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱11.9M | 100% | Medium risk43 | —-0.040 |
| 20 | 25IN0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY AGAY-AY, SAN JUAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 44% | Medium risk34 | —-0.039 |
| 21 | 25IN0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY AMBACON, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 100% | Medium risk34 | —-0.063 |
| 22 | 25IN0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION DISTRICT II, SILAGO, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 41% | Medium risk34 | —-0.039 |
| 23 | 25IN0042CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY STA. PAZ SUR, SAN FRANCISCO SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 65% | Medium risk34 | —-0.046 |
| 24 | 25IN0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY KAUSWAGAN, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 100% | Medium risk34 | —-0.063 |
| 25 | 25IN0054CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY SAN MIGUEL, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 100% | Medium risk33 | —-0.063 |