Contractor dossier
76 projects on file, including joint ventures this contractor is part of.
Total projects
76
Total budget
₱1.9B
Average progress
80.2%
Completion rate
55.3%
Below 70%
Average risk score
44.5
Medium risk on average, out of 100
Flagged as unusual
7
9.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 53 | ₱1.6B | 42.0 | 3 | 82.6% |
| Negros Island Region | 11 | ₱100.6M | 45.0 | 0 | 77.4% |
| Region I | 7 | ₱83.4M | 66.7 | 4 | 66.5% |
| National Capital Region | 3 | ₱7.4M | 32.7 | 0 | 100.0% |
| Region IV-A | 1 | ₱9.7M | 47.5 | 0 | 3.1% |
| Region VI | 1 | ₱4.9M | 46.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 30 | ₱633.2M | 38.3 | 0 | 84.4% |
| Buildings and Facilities | 21 | ₱148.2M | 37.3 | 1 | 77.8% |
| Flood Control and Drainage | 11 | ₱783.7M | 56.4 | 0 | 91.0% |
| Bridges | 7 | ₱200M | 43.5 | 1 | 71.9% |
| GAA 2025 SSP | 4 | ₱61.7M | 94.4 | 4 | 56.8% |
| Water Provision and Storage | 2 | ₱4.4M | 31.2 | 0 | 100.0% |
| OTHER | 1 | ₱19.5M | 84.5 | 1 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00379BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY PUELAY, VILLASIS, PANGASINAN | Region I | Region I | On-Going | ₱4.8M | 48% | High risk95 | Flagged0.026 |
| 25A00380BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY ZONE V, VILLASIS, PANGASINAN | Region I | Region I | On-Going | ₱4.8M | 55% | High risk95 | Flagged0.026 |
| 25A00381BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY SAN JOSE, SANTO TOMAS, PANGASINAN | Region I | Region I | On-Going | ₱4.8M | 63% | High risk95 | Flagged0.024 |
| 25CO0008SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF FLOOD MITIGATION STRUCTURE, COLO RIS, DINALUPIHAN, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱47.3M | 62% | High risk94 | Flagged0.013 |
| 25CA0074CONSTRUCTION OF SCHOOL BUILDING, MABUCO ELEMENTARY SCHOOL, MABUCO ELEMENTARY SCHOOL, BARANGAY MABUCO, HERMOSA, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱19.5M | 0% | High risk84 | Flagged0.062 |
| 24C00048FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAGAC RIVER (VALDEZ BRIDGE), BAGAC, BATAAN (PHASE II) | Region III | Region III | On-Going | ₱94.3M | 93% | High risk81 | —-0.012 |
| 24CM0078FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION STRUCTURE, STO. TOMAS RIVER (STA. FE SECTION), SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱386M | 100% | High risk80 | —-0.019 |
| 24C00161FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO TRIBUTARY (PINULOT SECTION) TO COLO RIVER, PHASE 2-P, BRGY PINULOT, DINALUPIHAN, BATAAN | Region III | Region III | On-Going | ₱47.3M | 54% | High risk73 | —-0.008 |
| 24C00174CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BLDG/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. PARANG, BAGAC, BATAAN | Region III | Region III | Completed | ₱5M | 100% | High risk71 | —-0.070 |
| 25C00320CONVERGENCE ANS SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLES USER'S CHARGE (MVUC) AS PER RA 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONGJCT LAYAC-BALANGA-MARIVELES PORT RD - MARIVELES, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱18.9M | 0% | High risk70 | —-0.012 |
| 25C00177CONVERGENCE AND SPECIAL SUPPORT PROG. - BASIC INFRASTRUCTURE PROG. - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB. OF FLOOD MITIGATION STRUCTURE ALONG SAGUING RIVER (TRIBUTARY TO COLO RIVER) DINALUPIHAN, BAT. | Region III | Bataan 3rd DEO | On-Going | ₱9.7M | 100% | High risk69 | —-0.034 |
| 17CA0018CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF PENTOR-BALSIK RIVER (TORRES SECTION), DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱13.7M | 100% | High risk68 | —-0.061 |
| 24HM0076CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF LICOAN ROAD, MARIA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱29.6M | 82% | High risk66 | —-0.023 |
| 24C00160BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - AMO BR. (B01613LZ) ALONG JCT. LAYAC-BALANGA-MARIVELES PORT ROAD (PHASE 1) | Region III | Region III | On-Going | ₱40.2M | 0% | High risk64 | Flagged0.016 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CA0074CONSTRUCTION OF SCHOOL BUILDING, MABUCO ELEMENTARY SCHOOL, MABUCO ELEMENTARY SCHOOL, BARANGAY MABUCO, HERMOSA, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱19.5M | 0% | High risk84 | Flagged0.062 |
| 24AI0221CONSTRUCTION OF ONE (1) STOREY TWO (2) CLASSROOM SCHOOL BUILDING IN CASABULA ELEMENTARY SCHOOL BARANGAY CASANTAAN, URDANETA CITY, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱5.4M | 0% | Medium risk46 | Flagged0.031 |
| 25A00379BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY PUELAY, VILLASIS, PANGASINAN | Region I | Region I | On-Going | ₱4.8M | 48% | High risk95 | Flagged0.026 |
| 25A00380BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY ZONE V, VILLASIS, PANGASINAN | Region I | Region I | On-Going | ₱4.8M | 55% | High risk95 | Flagged0.026 |
| 25A00381BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY SAN JOSE, SANTO TOMAS, PANGASINAN | Region I | Region I | On-Going | ₱4.8M | 63% | High risk95 | Flagged0.024 |
| 24C00160BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - AMO BR. (B01613LZ) ALONG JCT. LAYAC-BALANGA-MARIVELES PORT ROAD (PHASE 1) | Region III | Region III | On-Going | ₱40.2M | 0% | High risk64 | Flagged0.016 |
| 25CO0008SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF FLOOD MITIGATION STRUCTURE, COLO RIS, DINALUPIHAN, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱47.3M | 62% | High risk94 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25A00379BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY PUELAY, VILLASIS, PANGASINAN | Region I | Region I | On-Going | ₱4.8M | 48% | High risk95 | Flagged0.026 |
| 2 | 25A00380BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY ZONE V, VILLASIS, PANGASINAN | Region I | Region I | On-Going | ₱4.8M | 55% | High risk95 | Flagged0.026 |
| 3 | 25A00381BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY SAN JOSE, SANTO TOMAS, PANGASINAN | Region I | Region I | On-Going | ₱4.8M | 63% | High risk95 | Flagged0.024 |
| 4 | 25CO0008SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF FLOOD MITIGATION STRUCTURE, COLO RIS, DINALUPIHAN, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱47.3M | 62% | High risk94 | Flagged0.013 |
| 5 | 25CA0074CONSTRUCTION OF SCHOOL BUILDING, MABUCO ELEMENTARY SCHOOL, MABUCO ELEMENTARY SCHOOL, BARANGAY MABUCO, HERMOSA, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱19.5M | 0% | High risk84 | Flagged0.062 |
| 6 | 24C00048FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAGAC RIVER (VALDEZ BRIDGE), BAGAC, BATAAN (PHASE II) | Region III | Region III | On-Going | ₱94.3M | 93% | High risk81 | —-0.012 |
| 7 | 24CM0078FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION STRUCTURE, STO. TOMAS RIVER (STA. FE SECTION), SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱386M | 100% | High risk80 | —-0.019 |
| 8 | 24C00161FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO TRIBUTARY (PINULOT SECTION) TO COLO RIVER, PHASE 2-P, BRGY PINULOT, DINALUPIHAN, BATAAN | Region III | Region III | On-Going | ₱47.3M | 54% | High risk73 | —-0.008 |
| 9 | 24C00174CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BLDG/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. PARANG, BAGAC, BATAAN | Region III | Region III | Completed | ₱5M | 100% | High risk71 | —-0.070 |
| 10 | 25C00320CONVERGENCE ANS SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLES USER'S CHARGE (MVUC) AS PER RA 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONGJCT LAYAC-BALANGA-MARIVELES PORT RD - MARIVELES, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱18.9M | 0% | High risk70 | —-0.012 |
| 11 | 25C00177CONVERGENCE AND SPECIAL SUPPORT PROG. - BASIC INFRASTRUCTURE PROG. - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB. OF FLOOD MITIGATION STRUCTURE ALONG SAGUING RIVER (TRIBUTARY TO COLO RIVER) DINALUPIHAN, BAT. | Region III | Bataan 3rd DEO | On-Going | ₱9.7M | 100% | High risk69 | —-0.034 |
| 12 | 17CA0018CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF PENTOR-BALSIK RIVER (TORRES SECTION), DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱13.7M | 100% | High risk68 | —-0.061 |
| 13 | 24HM0076CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF LICOAN ROAD, MARIA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱29.6M | 82% | High risk66 | —-0.023 |
| 14 | 24C00160BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - AMO BR. (B01613LZ) ALONG JCT. LAYAC-BALANGA-MARIVELES PORT ROAD (PHASE 1) | Region III | Region III | On-Going | ₱40.2M | 0% | High risk64 | Flagged0.016 |
| 15 | 23C00013FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAGAC RIVER (VALDEZ BRIDGE), BAGAC, BATAAN | Region III | Region III | Completed | ₱96.5M | 100% | Medium risk58 | —-0.072 |
| 16 | 25CA0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD, SAN JUAN VICIN | Region III | Bataan 1st DEO | On-Going | ₱95.5M | 31% | Medium risk57 | —-0.044 |
| 17 | 20C00004NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS-ROMAN EXPRESSWAY, BATAAN 1ST LEGISLATIVE DISTRICT | Region III | Region III | Completed | ₱125.4M | 100% | Medium risk56 | —-0.079 |
| 18 | 23CA0032BRIDGE PROGRAM - REPLACEMENT OF WEAK BRIDGES - SAMAL BR. (B00055LZ) ALONG ROMAN EXPRESSWAY, SAMAL, BATAAN | Region III | Bataan 1st DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.046 |
| 19 | 23HM0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PROVINCIAL CAPITOL GROUNDS, POLANGYUTA, SIQUIJOR, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱19.8M | 0% | Medium risk51 | —-0.006 |
| 20 | 23HM0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BLDG. IN THE PROVINCIAL CAPITOL GROUNDS, POLANGYUTA, SIQUIJOR, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱4.9M | 0% | Medium risk49 | —-0.006 |
| 21 | 25CO0006CONVERGENCE & SPECIAL SUPPORT PROG-CONST/IMPROVEMENT OF ACCESS RDS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES (ROAD LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA. PROGRAM-ROLL IT) BRGY PITA RDLEADING TO AGRO-INDUSTRIAL AREA, DINALUPIHAN, BAT | Region III | Bataan 3rd DEO | On-Going | ₱2.4M | 0% | Medium risk48 | —-0.012 |
| 22 | 23HM0044CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM, ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF BARANGAY ROAD, BARANGAY BASAC, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱5M | 100% | Medium risk48 | —-0.046 |
| 23 | 24DI0193CONSTRUCTION OF SAIMSIM BRIDGE CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱9.7M | 3% | Medium risk48 | —-0.013 |
| 24 | 22HM0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), CONSTRUCTION/ IMPROVEMENT OF ACCESSS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), SAN ANTONIO - CANTABON - BANDILAAN ROAD LEADING TO VARIOUS CANTABON CAVE, HE | Negros Island Region | Siquijor DEO | On-Going | ₱8.3M | 88% | Medium risk47 | —-0.033 |
| 25 | 22G00164CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MABINI, ESCALANTE CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱4.9M | 100% | Medium risk47 | —-0.080 |