Contractor dossier
204 projects on file, including joint ventures this contractor is part of.
Total projects
204
Total budget
₱11B
Average progress
94.3%
Completion rate
82.4%
Average risk score
50.4
Medium risk on average, out of 100
Flagged as unusual
8
3.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 75 | ₱3.9B | 48.6 | 1 | 97.5% |
| Region XIII | 50 | ₱2.2B | 44.4 | 2 | 93.0% |
| Negros Island Region | 39 | ₱1.9B | 54.5 | 2 | 88.9% |
| Region VI | 19 | ₱1.4B | 55.5 | 0 | 96.3% |
| Region XI | 16 | ₱943.6M | 58.2 | 2 | 92.9% |
| Region IX | 2 | ₱285.8M | 70.4 | 1 | 100.0% |
| Region IV-A | 2 | ₱200M | 60.0 | 0 | 100.0% |
| Region XII | 1 | ₱144M | 50.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 112 | ₱5.4B | 46.6 | 1 | 97.1% |
| Flood Control and Drainage | 58 | ₱3.9B | 50.1 | 0 | 93.6% |
| Buildings and Facilities | 10 | ₱319.2M | 43.2 | 0 | 100.0% |
| Bridges | 8 | ₱342.8M | 46.6 | 1 | 92.9% |
| GAA 2025 OO-2 | 7 | ₱466.1M | 92.0 | 3 | 51.3% |
| OTHER | 5 | ₱269.9M | 77.8 | 1 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱125.7M | 94.0 | 2 | 64.7% |
| Bridges, Roads | 2 | ₱258.7M | 66.9 | 0 | 99.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NA0027WIDENING OF PERMANENT BRIDGES - MAGUS PARALLEL BR. ALONG AGUSAN-MALAYBALAY RD | Region XIII | Agusan del Norte DEO | On-Going | ₱62.1M | 52% | High risk94 | Flagged0.012 |
| 25L00141CONSTRUCTION OF GRAVEL ROAD - BUKIDNON - COMPOSTELA VALLEY ROAD, NAMNAM, SAN FERNANDO, BUKIDNON - LAAK COMPOSTELA VALLEY, PACKAGE 15, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱63.6M | 77% | High risk94 | Flagged0.006 |
| 25LK0010CONSTRUCTION OF REVETMENT ALONG LASANG RIVER PROTECTING LASANG BRIDGE, STA. 6 + 800 - STA. 7 + 100, RIGHT BANK, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱96M | 82% | High risk94 | —-0.002 |
| 25LG0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PHASE II, BARANGAY MAYO, MATI CITY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱114M | 60% | High risk93 | Flagged0.016 |
| 25GO0098CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING IMPROVEMENT OF RIVERBANK ALONG PEQIÑO CREEK, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱62.4M | 10% | High risk92 | Flagged0.003 |
| 25GK0058CONSTRUCTION OF SEAWALL, BARANGAY ZONE 6, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱47.4M | 80% | High risk92 | —-0.013 |
| 25GO0102CONSTRUCTION FLOOD CONTROL STRUCTURES AT VILLA ANGELA, FROM BACOLOD CITY BOUNDARY ROAD TO LUPIT RIVER, BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱48.7M | 23% | High risk92 | —-0.002 |
| 25GO0105CONSTRUCTION OF REVETMENT WITH FLOODWALL INCLUDING IMPROVEMENT OF RIVERBANK, BANAGO RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.7M | 94% | High risk92 | —-0.020 |
| 25GO0099CONSTRUCTION OF REVETMENT WITH FLOODWALL INCLUDING IMPROVEMENT OF RIVERBANK, MANDALAGAN RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.8M | 10% | High risk91 | Flagged0.002 |
| 17ND0057ROAD IMPROVEMENT PROJECT, BUTUAN CITY-MALAYBALAY ROAD, BUTUAN CITY-CHAINAGE 0000-CHAINAGE 1082, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱19.7M | 100% | High risk84 | Flagged0.007 |
| 21GH0073OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING / CONSTRUCTION - PASSI - SN RAFAEL - LEMERY - SARA RD - K0069+095 - K0069+531, K0069+701 - K0070+593, K0074+493 - K0076+034, K0076+360 - K0076+784, SAN RAFAEL, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱51.7M | 100% | High risk78 | —-0.029 |
| 23K00011CONST.OF MISSING LINKS/NEW ROADS, JCT. MARAMAG-MARADUGAO ROAD-JCT. LAMPANUSAN ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | Completed | ₱98.8M | 100% | High risk78 | —-0.011 |
| 17K00092ROAD UPGRADING(UNPAVED TO PAVED)BASED ON GRS,TB FOR UPGRADING TO PRS(HDM-4 PROJ. ANALYSIS),BARANDIAS | Region X | Region X | Completed | ₱73.5M | 100% | High risk75 | —-0.033 |
| 21J00107ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - UMUS MATAHA - LUPA - PULA ROAD | Region IX | Region IX | On-Going | ₱143M | 100% | High risk74 | Flagged0.013 |
| 17NA0008(RE-AD) IMPROVEMENT/WIDENING OF NATIONAL ROAD-SECONDARY NASIPIT PORT ROAD, NASIPIT, AGUSAN DEL NORTE, K1263+(-)681 - K1263+575 (S00392MN) | Region XIII | Agusan del Norte DEO | Completed | ₱26.2M | 100% | High risk74 | —-0.015 |
| 17G00096CONSTRUCTION OF REGIONAL EVACUATION CENTER, BRGY. GINES, ZARAGA, ILOILO | Region VI | Region VI | Completed | ₱34.2M | 100% | High risk73 | —-0.053 |
| 17G00045ROAD WIDENING - PASSI - SN RAFAEL - LEMERY - SARA ROAD INCLUDING RROW K0077+107 - K0080+122, K0086+0 | Region VI | Region VI | Completed | ₱132.5M | 100% | High risk72 | —-0.034 |
| 17G00078CONSTRUCTION OF REGIONAL EVACUATION CENTER, BRGY. CABUGUANA, CARLES, ILOILO | Region VI | Region VI | Completed | ₱34.3M | 100% | High risk71 | —-0.053 |
| 21GK0031CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO PACOL FALLS, ALIMATOC RICE TERRACES AND PRAYER MOUNTAIN, BRGY. V.F. GUSTILO, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱62.3M | 100% | High risk69 | —-0.058 |
| 24L00132CONSTRUCTION OF GRAVEL ROAD - BUKIDNON - COMPOSTELLA VALLEY ROAD, NAMNAM, SAN FERNANDO, BUKIDNON - LAAK COMPOSTELA VALLEY, PACKAGE 14, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱142.5M | 99% | High risk68 | —-0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24KA0190CONSTRUCTION/REPLACEMENT OF IMPASUG-ONG BRIDGE ALONG IMPASUG-ONG - PATULANGAN BYPASS ROAD, IMPASUG-ONG, BUKIDNON, POBLACION, IMPASUG-ONG, BUKIDNON | Region X | Bukidnon 1st DEO | On-Going | ₱34.7M | 61% | Medium risk48 | Flagged0.034 |
| 25LG0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PHASE II, BARANGAY MAYO, MATI CITY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱114M | 60% | High risk93 | Flagged0.016 |
| 21J00107ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - UMUS MATAHA - LUPA - PULA ROAD | Region IX | Region IX | On-Going | ₱143M | 100% | High risk74 | Flagged0.013 |
| 25NA0027WIDENING OF PERMANENT BRIDGES - MAGUS PARALLEL BR. ALONG AGUSAN-MALAYBALAY RD | Region XIII | Agusan del Norte DEO | On-Going | ₱62.1M | 52% | High risk94 | Flagged0.012 |
| 17ND0057ROAD IMPROVEMENT PROJECT, BUTUAN CITY-MALAYBALAY ROAD, BUTUAN CITY-CHAINAGE 0000-CHAINAGE 1082, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱19.7M | 100% | High risk84 | Flagged0.007 |
| 25L00141CONSTRUCTION OF GRAVEL ROAD - BUKIDNON - COMPOSTELA VALLEY ROAD, NAMNAM, SAN FERNANDO, BUKIDNON - LAAK COMPOSTELA VALLEY, PACKAGE 15, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱63.6M | 77% | High risk94 | Flagged0.006 |
| 25GO0098CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING IMPROVEMENT OF RIVERBANK ALONG PEQIÑO CREEK, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱62.4M | 10% | High risk92 | Flagged0.003 |
| 25GO0099CONSTRUCTION OF REVETMENT WITH FLOODWALL INCLUDING IMPROVEMENT OF RIVERBANK, MANDALAGAN RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.8M | 10% | High risk91 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20KC0063WIDENING OF PERMANENT BRIDGE OLAYAN BR. (B01091MN) ALONG BARANDIAS-DOMINOROG RD., PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱23.9M | 100% | Medium risk46 | —-0.059 |
| 102 | 20GH0050CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF BAROTAC VIEJO RIVER CONTROL, BRGY. POBLACION ILAWOD, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱45.1M | 100% | Medium risk46 | —-0.071 |
| 103 | 25GQ0015RECONSTRUCTION TO CONCRETE PAVEMENT ALONG STOP AGUINALDO-BUG-ANG RD (S00395NR) - K0111+781 - K0111+900, K0116+581 - K0116+642, K0121+306-K0121+627, K0123+000-K0123+569 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱25M | 98% | Medium risk46 | —-0.068 |
| 104 | 24GH0079CONSTRUCTION OF FLOOD MILTIGATION STRUCTURE- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PILI, AJUY, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.070 |
| 105 | 22LA0112CONSTRUCTION OF REVETMENT ALONG BINUANGAN CREEK LEADING TO MACO RIVER, STA. 0+400 - STA. 1+200, BRGY. BINUANGAN, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.071 |
| 106 | 23KC0065ROAD WIDENING ALONG MARAMAG-MARADUGAO RD. - K1583+000-K1584+007, PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱41.5M | 100% | Medium risk46 | —-0.092 |
| 107 | 20KC0107ROAD WIDENING ALONG MARAMAG-MARADUGAO ROAD K1585+1027.60-K1587+102.60, PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱42.4M | 100% | Medium risk46 | —-0.093 |
| 108 | 23KC0064REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. MARADUGAO-CAMP KIBARITAN-DOMINOROG RD. - K1605+527-K1606+050, K1606+200-K1606+500, KALILANGAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱34.4M | 100% | Medium risk46 | —-0.093 |
| 109 | 23KC0035REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG MARAMAG-MARADUGAO RD. K1590+(-569)-K1590+(-462), K1590+(-165)-K1590+(-003), K1595+644-K1596+000, K1601+692-K1602+018, K1602+609-K1602+743, PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱30.8M | 100% | Medium risk46 | —-0.093 |
| 110 | 21KC0041REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE-JCT MARADUGAO-CAMP KIBARITAN-DOMINOROG RD.-K1615+457-K1615+551, K1624+362-K1624+477, K1624+545-K1624+591, KALILANGAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.093 |
| 111 | 18GH0074ROAD WIDENING - PASSI-SN RAFAEL-LEMERY-SARA RD - K0069+095 - K0069+546, K0069+704.5 - K0070+530, SAN RAFAEL, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱46.6M | 100% | Medium risk46 | —-0.085 |
| 112 | 24LF0035JCT. MANAY-TAOCANGA ROAD LEADING TO DIAMABOC LAKE, MANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱7.3M | 100% | Medium risk46 | —-0.078 |
| 113 | 21KC0099ROAD WIDENING ALONG SAYRE HIGHWAY K1442+100-K1442+410, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱31.9M | 100% | Medium risk46 | —-0.093 |
| 114 | 18GK0085ROAD REHABILITATION/RECONSTRUCTION OF JCT. MARTESAN LEADING TO LAKAWON ISLAND RESORT, BRGY. CADIZ VIEJO, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱37.2M | 100% | Medium risk46 | —-0.090 |
| 115 | 20GK0143ROAD WIDENING AT SPECIFIC LOCATIONS ALONG BACOLOD NORTH RD (S00406NR) -K0040+801 - K0041+843 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱31.7M | 100% | Medium risk46 | —-0.091 |
| 116 | 21K00271CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD CONTROL STRUCTURE ALONG PALILAN RIVER (PI-6, LEFT BANK), JIMENEZ, MISAMIS OCCIDENTAL, STA. 0+260.00 - STA. 0+712.49 | Region X | Region X | Completed | ₱35.1M | 100% | Medium risk46 | —-0.070 |
| 117 | 22GK0002CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF LAG-ASAN RIVER (BOTHSTREAM) ALONG BACOLOD NORTH ROAD, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱44.1M | 100% | Medium risk46 | —-0.066 |
| 118 | 22GO0119CONSTRUCTION OF MULTI-PURPOSE BUILDING, LAS PALMAS SUBD., BRGY. TACULING, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱9.9M | 100% | Medium risk45 | —-0.083 |
| 119 | 22GO0031CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) - B.S. AQUINO DRIVE (FROM SAN JUAN ST. LEADING TO MAMBUCAL RESORT, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱35.4M | 100% | Medium risk45 | —-0.089 |
| 120 | 18GK0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF DAPDAP RIVER (BOTHSTREAM) ALONG BACOLOD NORTH ROAD (S00406NR), MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱37.2M | 100% | Medium risk45 | —-0.067 |
| 121 | 22GK0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL AT DAPDAP RIVER ALONG BACOLOD NORTH ROAD, MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱44.1M | 100% | Medium risk45 | —-0.068 |
| 122 | 25GO0101CONSTRUCTION OF REVETMENT WITH FLOODWALL INCLUDING IMPROVEMENT OF RIVERBANK (WITH ESPLANADE) ALONG MAMBULOC CREEK, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱29.2M | 20% | Medium risk45 | —-0.019 |
| 123 | 18GK0183CONSTRUCTION OF 4STY 16CL BUILDING AT MABINI NATIONAL HIGH SCHOOL, CADIZ CITY | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱48M | 100% | Medium risk45 | —-0.036 |
| 124 | 21KC0061ROAD WIDENING-KIBAWE-KADINGILAN-KALILANGAN RD-K1606+483-K1606+759,K1608+113-K1608+184, PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱17.6M | 100% | Medium risk45 | —-0.095 |
| 125 | 24K00286CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARAMAG-MARADUGAO RD (UPSTREAM AND DOWNSTREAM) OF MULETA BRIDGE, PACKAGE 2, PANGANTUCAN, BUKIDNON | Region X | Region X | On-Going | ₱36.2M | 100% | Medium risk45 | —-0.042 |