Contractor dossier
204 projects on file, including joint ventures this contractor is part of.
Total projects
204
Total budget
₱11B
Average progress
94.3%
Completion rate
82.4%
Average risk score
50.4
Medium risk on average, out of 100
Flagged as unusual
8
3.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 75 | ₱3.9B | 48.6 | 1 | 97.5% |
| Region XIII | 50 | ₱2.2B | 44.4 | 2 | 93.0% |
| Negros Island Region | 39 | ₱1.9B | 54.5 | 2 | 88.9% |
| Region VI | 19 | ₱1.4B | 55.5 | 0 | 96.3% |
| Region XI | 16 | ₱943.6M | 58.2 | 2 | 92.9% |
| Region IX | 2 | ₱285.8M | 70.4 | 1 | 100.0% |
| Region IV-A | 2 | ₱200M | 60.0 | 0 | 100.0% |
| Region XII | 1 | ₱144M | 50.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 112 | ₱5.4B | 46.6 | 1 | 97.1% |
| Flood Control and Drainage | 58 | ₱3.9B | 50.1 | 0 | 93.6% |
| Buildings and Facilities | 10 | ₱319.2M | 43.2 | 0 | 100.0% |
| Bridges | 8 | ₱342.8M | 46.6 | 1 | 92.9% |
| GAA 2025 OO-2 | 7 | ₱466.1M | 92.0 | 3 | 51.3% |
| OTHER | 5 | ₱269.9M | 77.8 | 1 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱125.7M | 94.0 | 2 | 64.7% |
| Bridges, Roads | 2 | ₱258.7M | 66.9 | 0 | 99.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NA0027WIDENING OF PERMANENT BRIDGES - MAGUS PARALLEL BR. ALONG AGUSAN-MALAYBALAY RD | Region XIII | Agusan del Norte DEO | On-Going | ₱62.1M | 52% | High risk94 | Flagged0.012 |
| 25L00141CONSTRUCTION OF GRAVEL ROAD - BUKIDNON - COMPOSTELA VALLEY ROAD, NAMNAM, SAN FERNANDO, BUKIDNON - LAAK COMPOSTELA VALLEY, PACKAGE 15, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱63.6M | 77% | High risk94 | Flagged0.006 |
| 25LK0010CONSTRUCTION OF REVETMENT ALONG LASANG RIVER PROTECTING LASANG BRIDGE, STA. 6 + 800 - STA. 7 + 100, RIGHT BANK, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱96M | 82% | High risk94 | —-0.002 |
| 25LG0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PHASE II, BARANGAY MAYO, MATI CITY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱114M | 60% | High risk93 | Flagged0.016 |
| 25GO0098CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING IMPROVEMENT OF RIVERBANK ALONG PEQIÑO CREEK, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱62.4M | 10% | High risk92 | Flagged0.003 |
| 25GK0058CONSTRUCTION OF SEAWALL, BARANGAY ZONE 6, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱47.4M | 80% | High risk92 | —-0.013 |
| 25GO0102CONSTRUCTION FLOOD CONTROL STRUCTURES AT VILLA ANGELA, FROM BACOLOD CITY BOUNDARY ROAD TO LUPIT RIVER, BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱48.7M | 23% | High risk92 | —-0.002 |
| 25GO0105CONSTRUCTION OF REVETMENT WITH FLOODWALL INCLUDING IMPROVEMENT OF RIVERBANK, BANAGO RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.7M | 94% | High risk92 | —-0.020 |
| 25GO0099CONSTRUCTION OF REVETMENT WITH FLOODWALL INCLUDING IMPROVEMENT OF RIVERBANK, MANDALAGAN RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.8M | 10% | High risk91 | Flagged0.002 |
| 17ND0057ROAD IMPROVEMENT PROJECT, BUTUAN CITY-MALAYBALAY ROAD, BUTUAN CITY-CHAINAGE 0000-CHAINAGE 1082, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱19.7M | 100% | High risk84 | Flagged0.007 |
| 21GH0073OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING / CONSTRUCTION - PASSI - SN RAFAEL - LEMERY - SARA RD - K0069+095 - K0069+531, K0069+701 - K0070+593, K0074+493 - K0076+034, K0076+360 - K0076+784, SAN RAFAEL, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱51.7M | 100% | High risk78 | —-0.029 |
| 23K00011CONST.OF MISSING LINKS/NEW ROADS, JCT. MARAMAG-MARADUGAO ROAD-JCT. LAMPANUSAN ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | Completed | ₱98.8M | 100% | High risk78 | —-0.011 |
| 17K00092ROAD UPGRADING(UNPAVED TO PAVED)BASED ON GRS,TB FOR UPGRADING TO PRS(HDM-4 PROJ. ANALYSIS),BARANDIAS | Region X | Region X | Completed | ₱73.5M | 100% | High risk75 | —-0.033 |
| 21J00107ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - UMUS MATAHA - LUPA - PULA ROAD | Region IX | Region IX | On-Going | ₱143M | 100% | High risk74 | Flagged0.013 |
| 17NA0008(RE-AD) IMPROVEMENT/WIDENING OF NATIONAL ROAD-SECONDARY NASIPIT PORT ROAD, NASIPIT, AGUSAN DEL NORTE, K1263+(-)681 - K1263+575 (S00392MN) | Region XIII | Agusan del Norte DEO | Completed | ₱26.2M | 100% | High risk74 | —-0.015 |
| 17G00096CONSTRUCTION OF REGIONAL EVACUATION CENTER, BRGY. GINES, ZARAGA, ILOILO | Region VI | Region VI | Completed | ₱34.2M | 100% | High risk73 | —-0.053 |
| 17G00045ROAD WIDENING - PASSI - SN RAFAEL - LEMERY - SARA ROAD INCLUDING RROW K0077+107 - K0080+122, K0086+0 | Region VI | Region VI | Completed | ₱132.5M | 100% | High risk72 | —-0.034 |
| 17G00078CONSTRUCTION OF REGIONAL EVACUATION CENTER, BRGY. CABUGUANA, CARLES, ILOILO | Region VI | Region VI | Completed | ₱34.3M | 100% | High risk71 | —-0.053 |
| 21GK0031CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO PACOL FALLS, ALIMATOC RICE TERRACES AND PRAYER MOUNTAIN, BRGY. V.F. GUSTILO, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱62.3M | 100% | High risk69 | —-0.058 |
| 24L00132CONSTRUCTION OF GRAVEL ROAD - BUKIDNON - COMPOSTELLA VALLEY ROAD, NAMNAM, SAN FERNANDO, BUKIDNON - LAAK COMPOSTELA VALLEY, PACKAGE 14, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱142.5M | 99% | High risk68 | —-0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24KA0190CONSTRUCTION/REPLACEMENT OF IMPASUG-ONG BRIDGE ALONG IMPASUG-ONG - PATULANGAN BYPASS ROAD, IMPASUG-ONG, BUKIDNON, POBLACION, IMPASUG-ONG, BUKIDNON | Region X | Bukidnon 1st DEO | On-Going | ₱34.7M | 61% | Medium risk48 | Flagged0.034 |
| 25LG0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PHASE II, BARANGAY MAYO, MATI CITY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱114M | 60% | High risk93 | Flagged0.016 |
| 21J00107ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - UMUS MATAHA - LUPA - PULA ROAD | Region IX | Region IX | On-Going | ₱143M | 100% | High risk74 | Flagged0.013 |
| 25NA0027WIDENING OF PERMANENT BRIDGES - MAGUS PARALLEL BR. ALONG AGUSAN-MALAYBALAY RD | Region XIII | Agusan del Norte DEO | On-Going | ₱62.1M | 52% | High risk94 | Flagged0.012 |
| 17ND0057ROAD IMPROVEMENT PROJECT, BUTUAN CITY-MALAYBALAY ROAD, BUTUAN CITY-CHAINAGE 0000-CHAINAGE 1082, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱19.7M | 100% | High risk84 | Flagged0.007 |
| 25L00141CONSTRUCTION OF GRAVEL ROAD - BUKIDNON - COMPOSTELA VALLEY ROAD, NAMNAM, SAN FERNANDO, BUKIDNON - LAAK COMPOSTELA VALLEY, PACKAGE 15, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱63.6M | 77% | High risk94 | Flagged0.006 |
| 25GO0098CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING IMPROVEMENT OF RIVERBANK ALONG PEQIÑO CREEK, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱62.4M | 10% | High risk92 | Flagged0.003 |
| 25GO0099CONSTRUCTION OF REVETMENT WITH FLOODWALL INCLUDING IMPROVEMENT OF RIVERBANK, MANDALAGAN RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.8M | 10% | High risk91 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 17ND0103REHABILITATION/IMPROVEMENT AT BUTUAN CITY-MALAYBALAY ROAD, K1241+700-K1246+500, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱47M | 100% | Medium risk45 | —-0.001 |
| 127 | 23KC0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGAYARAN RIVER (DOWNSTREAM) OF NABALIWA BRIDGE WITH SLOPE PROTECTION, PACKAGE 1, PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱16.7M | 100% | Medium risk45 | —-0.080 |
| 128 | 23KC0053REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. MARADUGAO-CAMP KIBARITAN-DOMINOROG RD. - K1620+150-K1620+350, K1622+352-K1622+452, KALILANGAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱16.1M | 100% | Medium risk45 | —-0.094 |
| 129 | 23KC0056CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGAYARAN RIVER (UPSTREAM) OF NABALIWA BRIDGE WITH SLOPE PROTECTION, PACKAGE 1, PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱28.9M | 100% | Medium risk45 | —-0.080 |
| 130 | 25GO0107IMPROVEMENT OF DRAINAGE SYSTEM, BRGY. PAHANOCOY, BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱24.4M | 46% | Medium risk45 | —-0.030 |
| 131 | 25KN0018ROAD WIDENING, MARAMAG-MARADUGAO RD - K1584 + 007 - K1584 + 231 | Region X | Bukidnon 4th DEO | On-Going | ₱15.6M | 100% | Medium risk45 | —-0.062 |
| 132 | 23KC0063REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG MARAMAG-MARADUGAO RD. K1578+360-K1578+560, K1578+653-K1578+788, K1579+544-K1579+603, K1581+101-K1581+285, K1582+799-K1582+862, K1587+838-K1587+941, K1589++396-K1589+451, PANGANTUCAN | Region X | Bukidnon 3rd DEO | Completed | ₱28.2M | 100% | Medium risk45 | —-0.093 |
| 133 | 21KC0085REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. MARADUGAO-CAMP KIBARITAN-DOMINOROG RD. K1614+981-K1614+1074, K1614+1317-K1614+1342, KALILANGAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱14.7M | 100% | Medium risk45 | —-0.093 |
| 134 | 25KN0013REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS, MARAMAG - MARADUGAO RD - K1581 + 280 - K1581 + 1063 | Region X | Bukidnon 4th DEO | Completed | ₱18.7M | 100% | Medium risk45 | —-0.094 |
| 135 | 23KC0036REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. MARADUGAO-CAMP KIBARITAN-DOMINOROG RD. - K1624+950-K1625+150, KALILANGAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱19.2M | 100% | Medium risk45 | —-0.094 |
| 136 | 19GK0038CONSTRUCTION OF CONCRETE ROAD - JCT. MARTESAN LEADING TO LAKAWON ISLAND RESORT, BRGY. CADIZ VIEJO, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱23.3M | 100% | Medium risk45 | —-0.092 |
| 137 | 18GK0088ROAD CONCRETING OF ACCESS ROAD LEADING TO PACOL FALLS, ALIMATOC RICE TERRACES AND PRAYER MOUNTAIN, BRGY. V.F. GUSTILO, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.091 |
| 138 | 18KH0040CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF CAGAYAN DE ORO CITY RIVER BASIN FLOOD CONTROL PROJECT BINONOAN CREEK (WITH SLUICE WAY AND GATE), CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱45.3M | 100% | Medium risk45 | —-0.074 |
| 139 | 25KN0012REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS, MARAMAG - MARADUGAO RD - K1580 + 833 - K1581 + 058 | Region X | Bukidnon 4th DEO | Completed | ₱5.4M | 100% | Medium risk45 | —-0.094 |
| 140 | 25KN0014REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS, MARAMAG - MARADUGAO RD - K1582 + 557 - K1582 + 882 | Region X | Bukidnon 4th DEO | Completed | ₱7.8M | 100% | Medium risk45 | —-0.094 |
| 141 | 25KN0022REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS, BARANDIAS-DOMINOROG RD - K1600 + 485 - K1600 + 716 | Region X | Bukidnon 4th DEO | On-Going | ₱5.5M | 100% | Medium risk45 | —-0.061 |
| 142 | 25KN0021REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS, BARANDIAS-DOMINOROG RD - K1599 + 028 - K1599 + 241 | Region X | Bukidnon 4th DEO | Completed | ₱5.1M | 100% | Medium risk45 | —-0.094 |
| 143 | 19GK0246CONSTRUCTION OF CONCRETE ROAD - CONCRETING OF ROAD, BARANGAY V.F. GUSTILO - BJOURMAINE ROAD, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱9.4M | 100% | Medium risk45 | —-0.090 |
| 144 | 22NG0038CONSTRUCTION OF RIVER CONTROL STRUCTURE, BARANGAY CAWILAN, TUBOD, SURIGAO DEL NORTE/BRGY. CAWILAN, TUBOD, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱82M | 100% | Medium risk44 | —-0.055 |
| 145 | 18KL0034CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE P | Region X | Misamis Oriental 2nd DEO | Completed | ₱27.1M | 100% | Medium risk44 | —-0.081 |
| 146 | 22LB0356CONSTRUCTION OF DRAINAGE AT BARANGAY CATALUNAN PEQUEÑO, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱29.4M | 100% | Medium risk44 | —-0.075 |
| 147 | 19GK0230CONSTRUCTION OF CONCRETE ROAD - CONCRETING OF ROAD, BARANGAY MABINI - SITIO COTCOT ROAD, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱6.6M | 100% | Medium risk44 | —-0.089 |
| 148 | 22LB0371CONSTRUCTION OF DRAINAGE SYSTEM AT PUROK7 & 9, BARANGAY 39-D, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱6.9M | 100% | Medium risk44 | —-0.073 |
| 149 | 21LA0071CONSTRUCTION OF REVETMENT ALONG HIJO RIVER AT BARANGAY TAGLAWIG, MACO DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱19.6M | 100% | Medium risk44 | —-0.072 |
| 150 | 21LA0070CONSTRUCTION OF REVETMENT ALONG HIJO RIVER AT BARANGAY PANGI (UPSTREAM) MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱19.6M | 100% | Medium risk44 | —-0.073 |