204 projects on file, including joint ventures this contractor is part of.
Total projects
204
Total budget
₱11B
Average progress
94.3%
Completion rate
82.4%
Average risk score
50.4
Medium risk on average, out of 100
Flagged as unusual
8
3.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 75 | ₱3.9B | 48.6 | 1 | 97.5% |
| Region XIII | 50 | ₱2.2B | 44.4 | 2 | 93.0% |
| Negros Island Region | 39 | ₱1.9B | 54.5 | 2 | 88.9% |
| Region VI | 19 | ₱1.4B | 55.5 | 0 | 96.3% |
| Region XI | 16 | ₱943.6M | 58.2 | 2 | 92.9% |
| Region IX | 2 | ₱285.8M | 70.4 | 1 | 100.0% |
| Region IV-A | 2 | ₱200M | 60.0 | 0 | 100.0% |
| Region XII | 1 | ₱144M | 50.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 112 | ₱5.4B | 46.6 | 1 | 97.1% |
| Flood Control and Drainage | 58 | ₱3.9B | 50.1 | 0 | 93.6% |
| Buildings and Facilities | 10 | ₱319.2M | 43.2 | 0 | 100.0% |
| Bridges | 8 | ₱342.8M | 46.6 | 1 | 92.9% |
| GAA 2025 OO-2 | 7 | ₱466.1M | 92.0 | 3 | 51.3% |
| OTHER | 5 | ₱269.9M | 77.8 | 1 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱125.7M | 94.0 | 2 | 64.7% |
| Bridges, Roads | 2 | ₱258.7M | 66.9 | 0 | 99.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NA0027WIDENING OF PERMANENT BRIDGES - MAGUS PARALLEL BR. ALONG AGUSAN-MALAYBALAY RD | Region XIII | Agusan del Norte DEO | On-Going | ₱62.1M | 52% | High risk94 | Flagged0.012 |
| 25L00141CONSTRUCTION OF GRAVEL ROAD - BUKIDNON - COMPOSTELA VALLEY ROAD, NAMNAM, SAN FERNANDO, BUKIDNON - LAAK COMPOSTELA VALLEY, PACKAGE 15, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱63.6M | 77% | High risk94 | Flagged0.006 |
| 25LK0010CONSTRUCTION OF REVETMENT ALONG LASANG RIVER PROTECTING LASANG BRIDGE, STA. 6 + 800 - STA. 7 + 100, RIGHT BANK, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱96M | 82% | High risk94 | —-0.002 |
| 25LG0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PHASE II, BARANGAY MAYO, MATI CITY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱114M | 60% | High risk93 | Flagged0.016 |
| 25GO0098CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING IMPROVEMENT OF RIVERBANK ALONG PEQIÑO CREEK, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱62.4M | 10% | High risk92 | Flagged0.003 |
| 25GK0058CONSTRUCTION OF SEAWALL, BARANGAY ZONE 6, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱47.4M | 80% | High risk92 | —-0.013 |
| 25GO0102CONSTRUCTION FLOOD CONTROL STRUCTURES AT VILLA ANGELA, FROM BACOLOD CITY BOUNDARY ROAD TO LUPIT RIVER, BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱48.7M | 23% | High risk92 | —-0.002 |
| 25GO0105CONSTRUCTION OF REVETMENT WITH FLOODWALL INCLUDING IMPROVEMENT OF RIVERBANK, BANAGO RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.7M | 94% | High risk92 | —-0.020 |
| 25GO0099CONSTRUCTION OF REVETMENT WITH FLOODWALL INCLUDING IMPROVEMENT OF RIVERBANK, MANDALAGAN RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.8M | 10% | High risk91 | Flagged0.002 |
| 17ND0057ROAD IMPROVEMENT PROJECT, BUTUAN CITY-MALAYBALAY ROAD, BUTUAN CITY-CHAINAGE 0000-CHAINAGE 1082, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱19.7M | 100% | High risk84 | Flagged0.007 |
| 21GH0073OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING / CONSTRUCTION - PASSI - SN RAFAEL - LEMERY - SARA RD - K0069+095 - K0069+531, K0069+701 - K0070+593, K0074+493 - K0076+034, K0076+360 - K0076+784, SAN RAFAEL, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱51.7M | 100% | High risk78 | —-0.029 |
| 23K00011CONST.OF MISSING LINKS/NEW ROADS, JCT. MARAMAG-MARADUGAO ROAD-JCT. LAMPANUSAN ROAD, PACKAGE 11, BUKIDNON | Region X | Region X | Completed | ₱98.8M | 100% | High risk78 | —-0.011 |
| 17K00092ROAD UPGRADING(UNPAVED TO PAVED)BASED ON GRS,TB FOR UPGRADING TO PRS(HDM-4 PROJ. ANALYSIS),BARANDIAS | Region X | Region X | Completed | ₱73.5M | 100% | High risk75 | —-0.033 |
| 21J00107ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - UMUS MATAHA - LUPA - PULA ROAD | Region IX | Region IX | On-Going | ₱143M | 100% | High risk74 | Flagged0.013 |
| 17NA0008(RE-AD) IMPROVEMENT/WIDENING OF NATIONAL ROAD-SECONDARY NASIPIT PORT ROAD, NASIPIT, AGUSAN DEL NORTE, K1263+(-)681 - K1263+575 (S00392MN) | Region XIII | Agusan del Norte DEO | Completed | ₱26.2M | 100% | High risk74 | —-0.015 |
| 17G00096CONSTRUCTION OF REGIONAL EVACUATION CENTER, BRGY. GINES, ZARAGA, ILOILO | Region VI | Region VI | Completed | ₱34.2M | 100% | High risk73 | —-0.053 |
| 17G00045ROAD WIDENING - PASSI - SN RAFAEL - LEMERY - SARA ROAD INCLUDING RROW K0077+107 - K0080+122, K0086+0 | Region VI | Region VI | Completed | ₱132.5M | 100% | High risk72 | —-0.034 |
| 17G00078CONSTRUCTION OF REGIONAL EVACUATION CENTER, BRGY. CABUGUANA, CARLES, ILOILO | Region VI | Region VI | Completed | ₱34.3M | 100% | High risk71 | —-0.053 |
| 21GK0031CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO PACOL FALLS, ALIMATOC RICE TERRACES AND PRAYER MOUNTAIN, BRGY. V.F. GUSTILO, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱62.3M | 100% | High risk69 | —-0.058 |
| 24L00132CONSTRUCTION OF GRAVEL ROAD - BUKIDNON - COMPOSTELLA VALLEY ROAD, NAMNAM, SAN FERNANDO, BUKIDNON - LAAK COMPOSTELA VALLEY, PACKAGE 14, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱142.5M | 99% | High risk68 | —-0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24KA0190CONSTRUCTION/REPLACEMENT OF IMPASUG-ONG BRIDGE ALONG IMPASUG-ONG - PATULANGAN BYPASS ROAD, IMPASUG-ONG, BUKIDNON, POBLACION, IMPASUG-ONG, BUKIDNON | Region X | Bukidnon 1st DEO | On-Going | ₱34.7M | 61% | Medium risk48 | Flagged0.034 |
| 25LG0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PHASE II, BARANGAY MAYO, MATI CITY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱114M | 60% | High risk93 | Flagged0.016 |
| 21J00107ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - UMUS MATAHA - LUPA - PULA ROAD | Region IX | Region IX | On-Going | ₱143M | 100% | High risk74 | Flagged0.013 |
| 25NA0027WIDENING OF PERMANENT BRIDGES - MAGUS PARALLEL BR. ALONG AGUSAN-MALAYBALAY RD | Region XIII | Agusan del Norte DEO | On-Going | ₱62.1M | 52% | High risk94 | Flagged0.012 |
| 17ND0057ROAD IMPROVEMENT PROJECT, BUTUAN CITY-MALAYBALAY ROAD, BUTUAN CITY-CHAINAGE 0000-CHAINAGE 1082, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱19.7M | 100% | High risk84 | Flagged0.007 |
| 25L00141CONSTRUCTION OF GRAVEL ROAD - BUKIDNON - COMPOSTELA VALLEY ROAD, NAMNAM, SAN FERNANDO, BUKIDNON - LAAK COMPOSTELA VALLEY, PACKAGE 15, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱63.6M | 77% | High risk94 | Flagged0.006 |
| 25GO0098CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING IMPROVEMENT OF RIVERBANK ALONG PEQIÑO CREEK, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱62.4M | 10% | High risk92 | Flagged0.003 |
| 25GO0099CONSTRUCTION OF REVETMENT WITH FLOODWALL INCLUDING IMPROVEMENT OF RIVERBANK, MANDALAGAN RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.8M | 10% | High risk91 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 18GK0234CONSTRUCTION OF 2STY8CL SCHOOL BUILDING AT GIL LOPEZ ELEMENTARY SCHOOL, SAGAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱22.3M | 100% | Medium risk41 | —-0.043 |
| 177 | 23N00035ROAD LEADING TO TOP RIDGE AND CAMP SITE, MAGDAGOOC, JABONGA, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱41.4M | 100% | Medium risk41 | —-0.083 |
| 178 | 23N00061BONBON-LIBERTAD BYPASS ROAD, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱19.1M | 0% | Medium risk41 | —-0.018 |
| 179 | 24N00050BONBON-LIBERTAD BYPASS ROAD, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱20.4M | 0% | Medium risk41 | —-0.023 |
| 180 | 19GK0275CONCRETING OF BRGY. V.F GUSTILO FMR, BRGY. V.F GUSTILO, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱9.4M | 100% | Medium risk40 | —-0.041 |
| 181 | 18ND0067ROAD WIDENING ALONG MAYOR DEMOCRITO D. PLAZA II AVE. K1236+(-460)-K1236+109, K1236+134.80-K1236+388, K1236+388-K1236+438, K1242+000-K1242+100, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱29.1M | 100% | Medium risk39 | —-0.087 |
| 182 | 23NA0020READ REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION) K1171+700-K1171+744, K1171+780-K1171+823.20 | Region XIII | Agusan del Norte DEO | Completed | ₱28.7M | 100% | Medium risk39 | —-0.087 |
| 183 | 18ND0054REHABILITATION/RECONSTRUCTION OF DAMAGED PAVED ROADS ALONG BUTUAN CITY-MALAYBALAY ROAD-K1240+(-995)-K1240+(-535), BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱23.1M | 100% | Medium risk39 | —-0.088 |
| 184 | 18NC0050REHAB./REPAIR OF DAMAGED SLOPE/BANK PROTECTION OF ADGAWAN RIVER PROTECTING ADGAWAN BRIDGE APPROACH A (INCL. ROW) 0+000 - 0+140 APPROACH A UPSTREAM, LA PAZ, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱48.8M | 100% | Medium risk39 | —-0.058 |
| 185 | 23N00021SANGHAN ROAD LEADING TO RAGAS FARM (AGRITOURISM), CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱19.3M | 100% | Medium risk39 | —-0.088 |
| 186 | 20N00074SANGHAN ROAD LEADING TO RAGAS FARM (AGRITOURISM), CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱18.9M | 100% | Medium risk39 | —-0.088 |
| 187 | 21NA0035CONCRETING OF ROAD, BRGY. TAOD-OY, MAGALLANES, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.087 |
| 188 | 18ND0081CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO AGRICULTURAL TRAINING INSTITUTE DEMO FARM, BRGY. LOS ANGELES, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱19.3M | 100% | Medium risk39 | —-0.087 |
| 189 | 19ND0022CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO FARMERS PRODUCERS COOPERATIVE NURSERY DEMO AND INTEGRATED FARM, BRGY.TUNGAO, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱9.8M | 100% | Medium risk39 | —-0.086 |
| 190 | 22NF0078NETWORK DEVELOPMENT ROAD WIDENING-TERTIARY ROADS ALONG JCT. OSMENA-PILAR ROAD-K0013+919-K0015+193 | Region XIII | Surigao del Norte 1st DEO | Completed | ₱38.8M | 100% | Medium risk39 | —-0.079 |
| 191 | 24ND0076CONCRETING OF ROAD, PUROK 1A BARANGAY AMPAYON, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱9.8M | 100% | Medium risk38 | —-0.084 |
| 192 | 20NC0128CONCRETING OF NRJ-BUNAWAN BROOK (ROCK ISLAND), BRGY. BUNAWAN BROOK, BUNAWAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱14.9M | 100% | Medium risk38 | —-0.076 |
| 193 | 24ND0109CONSTRUCTION OF SLOPE PROTECTION ALONG BRGY. BONIFACIO, LAS NIEVES | Region XIII | Butuan City DEO | Completed | ₱14.5M | 100% | Medium risk38 | —-0.065 |
| 194 | 20NC0125CONSTRUCTION OF AGUSAN RIVER FLOOD CONTROL STA. 0+000 - 0+050.00, VERUELA, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱14.9M | 100% | Medium risk37 | —-0.060 |
| 195 | 23NB0051CONCRETING OF SITIO LILO TO SITIO MACOPAHON, BRGY. STA. INES FMR, BRGY. STA. INES, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱35.8M | 100% | Medium risk37 | —-0.028 |
| 196 | 23NB0045CONCRETING OF BRGY. NUEVO TRABAJO TO SITIO LILO FMR, BRGY. NUEVO TRABAJO, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱29.8M | 100% | Medium risk37 | —-0.028 |
| 197 | 23NB0044CONCRETING OF BRGY. ANISLAGAN TO SITIO NEW CEBU FMR, BRGY. ANISLAGAN, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱29.8M | 100% | Medium risk37 | —-0.027 |
| 198 | 21NA0052CONCRETING OF BRGY. MARAIGING FMR, BRGY. MARAIGING, JABONGA, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱11.9M | 100% | Medium risk33 | —-0.039 |
| 199 | 23NB0043CONCRETING OF PUROK 5 TO PUROK 1, BRGY. COALICION FMR, BRGY. COALICION, SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱11.9M | 100% | Medium risk33 | —-0.034 |
| 200 | 17KL0167CONSTRUCTION OF CLASSROOMS (BATCH 13) 4STY-20CL,MIS. OR. GEN CHS,CAGAYAN DE ORO CITY,MISAMIS ORIENTA | Region X | Misamis Oriental 2nd DEO | Completed | ₱45.8M | 100% | Low risk22 | —-0.018 |