Contractor dossier
179 projects on file, including joint ventures this contractor is part of.
Total projects
179
Total budget
₱5.6B
Average progress
97.0%
Completion rate
88.8%
Average risk score
45.1
Medium risk on average, out of 100
Flagged as unusual
1
0.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 104 | ₱2.7B | 45.8 | 1 | 98.1% |
| Region III | 75 | ₱2.8B | 44.2 | 0 | 95.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 114 | ₱3.9B | 44.5 | 0 | 95.4% |
| Flood Control and Drainage | 32 | ₱1B | 50.1 | 0 | 99.4% |
| Buildings and Facilities | 19 | ₱99M | 29.1 | 0 | 100.0% |
| OTHER | 12 | ₱408.9M | 59.4 | 1 | 100.0% |
| GAA 2025 SSP | 1 | ₱48M | 94.2 | 0 | 99.7% |
| Bridges | 1 | ₱48.2M | 42.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CD0179CONSTRUCTION OF ROAD, DPWH COMPOUND, BRGY. PULONG BUHANGIN, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱48M | 100% | High risk94 | —-0.004 |
| 25CP0061CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE I, BARANGAY PULONG SAMPALOC, D | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 21% | High risk77 | —-0.002 |
| 25CP0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,BRGY. PULONG SAMPALOC,DONA | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 35% | High risk77 | —-0.009 |
| 25CC0097CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY BONGA MENOR, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 80% | High risk76 | —-0.025 |
| 24CC0262CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG KALERO RIVER AND ITS TRIBUTARIES, BARANGAY CALERO, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.060 |
| 24CC0081CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY CAMBAOG (TRIBUTARY), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 23CC0516CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. SAN PASCUAL, HAGONOY, BULACAN PHASE III | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.004 |
| 24C00098SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROADS INCLUDING DRAINAGE STRUCTURE AT SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱71.5M | 85% | High risk74 | —-0.033 |
| 24C00494SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS./FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER (PUROK 1 SECTION, UPSTREAM), BARANGAY TARTARO, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱48.2M | 100% | High risk73 | —-0.063 |
| 24C00495SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS-(SIPAG)-SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS./FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER (PUROK 1 SECTION, DOWNSTREAM), BARANGAY TARTARO, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱48.2M | 100% | High risk73 | —-0.063 |
| 24C00081SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD INCLUDING DRAINAGE STRUCTURE AT F. VIOLA HIGHWAY, SAN RAFAEL, BUL | Region III | Region III | On-Going | ₱96.5M | 100% | High risk73 | —-0.028 |
| 24CD0208CONSTRUCTION OF ROAD AND DRAINAGE ALONG NORZAGARAY SAN JOSE DEL MONTE CITY ROAD, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49.5M | 100% | High risk72 | —-0.067 |
| 24C00097SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROADS INCLUDING DRAINAGE STRUCTURE AT KALSADANG BAGO,SAN RAFAEL,BUL. | Region III | Region III | On-Going | ₱71.5M | 44% | High risk72 | —-0.019 |
| 25CK0075REHABILITATION OF ROAD, LILIBANGAN - CASTILLO ROAD, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱47.8M | 97% | High risk71 | —-0.040 |
| 25CK0115REHABILITATION OF ROAD, BARANGAY STA. LUCIA, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱47.8M | 78% | High risk71 | —-0.033 |
| 24C00240ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROAD, DAANG MAHARLIKA (LZ), PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱15.8M | 100% | High risk70 | —-0.044 |
| 24CD0123IMPROVEMENT OF ROAD WITH DRAINAGE CANAL, BRGY. POBLACION (DULONG BAYAN SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱14.5M | 100% | High risk70 | —-0.068 |
| 17CD0026IMPROVEMENT/REHABILITATION OF SAN JOSE PATAG - CATMON - BULAC ROAD, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱9.4M | 100% | High risk69 | —-0.068 |
| 24CD0011CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES, STA. 09+300 TO STA. 09+500 (BALASING-PULONG BUHANGIN SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49.5M | 100% | High risk68 | —-0.039 |
| 24CD0010CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES, STA. 09+100 TO STA. 09+300 (BALASING-PULONG BUHANGIN SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49.5M | 100% | High risk68 | —-0.040 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18OG0141CONSTRUCTION OF WATER IMPOUNDING LAGOONS, UP DILIMAN, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱47.3M | 100% | High risk64 | Flagged0.024 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CD0179CONSTRUCTION OF ROAD, DPWH COMPOUND, BRGY. PULONG BUHANGIN, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱48M | 100% | High risk94 | —-0.004 |
| 2 | 25CP0061CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE I, BARANGAY PULONG SAMPALOC, D | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 21% | High risk77 | —-0.002 |
| 3 | 25CP0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,BRGY. PULONG SAMPALOC,DONA | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 35% | High risk77 | —-0.009 |
| 4 | 25CC0097CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY BONGA MENOR, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 80% | High risk76 | —-0.025 |
| 5 | 24CC0262CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG KALERO RIVER AND ITS TRIBUTARIES, BARANGAY CALERO, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.060 |
| 6 | 24CC0081CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY CAMBAOG (TRIBUTARY), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 7 | 23CC0516CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. SAN PASCUAL, HAGONOY, BULACAN PHASE III | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.004 |
| 8 | 24C00098SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROADS INCLUDING DRAINAGE STRUCTURE AT SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱71.5M | 85% | High risk74 | —-0.033 |
| 9 | 24C00494SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS./FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER (PUROK 1 SECTION, UPSTREAM), BARANGAY TARTARO, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱48.2M | 100% | High risk73 | —-0.063 |
| 10 | 24C00495SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS-(SIPAG)-SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS./FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER (PUROK 1 SECTION, DOWNSTREAM), BARANGAY TARTARO, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱48.2M | 100% | High risk73 | —-0.063 |
| 11 | 24C00081SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD INCLUDING DRAINAGE STRUCTURE AT F. VIOLA HIGHWAY, SAN RAFAEL, BUL | Region III | Region III | On-Going | ₱96.5M | 100% | High risk73 | —-0.028 |
| 12 | 24CD0208CONSTRUCTION OF ROAD AND DRAINAGE ALONG NORZAGARAY SAN JOSE DEL MONTE CITY ROAD, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49.5M | 100% | High risk72 | —-0.067 |
| 13 | 24C00097SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROADS INCLUDING DRAINAGE STRUCTURE AT KALSADANG BAGO,SAN RAFAEL,BUL. | Region III | Region III | On-Going | ₱71.5M | 44% | High risk72 | —-0.019 |
| 14 | 25CK0075REHABILITATION OF ROAD, LILIBANGAN - CASTILLO ROAD, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱47.8M | 97% | High risk71 | —-0.040 |
| 15 | 25CK0115REHABILITATION OF ROAD, BARANGAY STA. LUCIA, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱47.8M | 78% | High risk71 | —-0.033 |
| 16 | 24C00240ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROAD, DAANG MAHARLIKA (LZ), PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱15.8M | 100% | High risk70 | —-0.044 |
| 17 | 24CD0123IMPROVEMENT OF ROAD WITH DRAINAGE CANAL, BRGY. POBLACION (DULONG BAYAN SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱14.5M | 100% | High risk70 | —-0.068 |
| 18 | 17CD0026IMPROVEMENT/REHABILITATION OF SAN JOSE PATAG - CATMON - BULAC ROAD, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱9.4M | 100% | High risk69 | —-0.068 |
| 19 | 24CD0011CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES, STA. 09+300 TO STA. 09+500 (BALASING-PULONG BUHANGIN SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49.5M | 100% | High risk68 | —-0.039 |
| 20 | 24CD0010CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES, STA. 09+100 TO STA. 09+300 (BALASING-PULONG BUHANGIN SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49.5M | 100% | High risk68 | —-0.040 |
| 21 | 24CD0012CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES, (BALASING-PULONG BUHANGIN SECTION), SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱48.2M | 100% | High risk68 | —-0.039 |
| 22 | 18OG0141CONSTRUCTION OF WATER IMPOUNDING LAGOONS, UP DILIMAN, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱47.3M | 100% | High risk64 | Flagged0.024 |
| 23 | 18OG0099ASSET PRESERVATION-CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROAD-SECONDARY ROAD: QUEZON AVE.-K0011+(-551) + K0008+259, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱69.3M | 100% | High risk64 | —-0.039 |
| 24 | 19OG0150IMPROVEMENT / REHABILITATION OF WATERWAYS, UNIVERSITY OF THE PHILIPPINES DILIMAN, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱55M | 100% | High risk64 | —-0.027 |
| 25 | 25OF0042CONSTRUCTION OF KATIPUNAN AVENUE EXTENSION STA. 1+200 - STA. 1+300, STA. 5+020 - STA. 5+702.62, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱129.7M | 15% | High risk62 | —-0.024 |