Contractor dossier
517 projects on file, including joint ventures this contractor is part of.
Total projects
517
Total budget
₱34.1B
Average progress
91.8%
Completion rate
82.4%
Average risk score
54.9
Medium risk on average, out of 100
Flagged as unusual
56
10.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 127 | ₱7.7B | 58.0 | 7 | 97.4% |
| Region III | 112 | ₱6B | 50.1 | 13 | 89.3% |
| National Capital Region | 72 | ₱3.9B | 52.1 | 2 | 95.0% |
| Region IV-A | 50 | ₱3.8B | 59.2 | 10 | 77.4% |
| Region IV-B | 45 | ₱3.4B | 51.1 | 2 | 99.1% |
| Region I | 32 | ₱2.3B | 55.1 | 3 | 87.9% |
| Region II | 29 | ₱1.9B | 53.2 | 4 | 99.0% |
| Negros Island Region | 11 | ₱1.5B | 77.3 | 9 | 52.1% |
| Cordillera Administrative Region | 11 | ₱1.1B | 59.3 | 1 | 99.5% |
| Region VI | 7 | ₱399.9M | 57.2 | 2 | 76.3% |
| Region XI | 4 | ₱772.6M | 58.0 | 0 | 100.0% |
| Region X | 4 | ₱414.3M | 56.1 | 0 | 100.0% |
| Region VII | 4 | ₱311.8M | 55.1 | 0 | 100.0% |
| Region XII | 3 | ₱288.5M | 71.4 | 3 | 75.6% |
| Region VIII | 3 | ₱169.3M | 51.6 | 0 | 100.0% |
| Region XIII | 3 | ₱337M | 45.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 164 | ₱10.5B | 55.3 | 22 | 90.4% |
| Roads | 155 | ₱12.8B | 55.5 | 4 | 91.8% |
| Buildings and Facilities | 95 | ₱3.9B | 47.4 | 12 | 93.9% |
| Bridges | 66 | ₱3.7B | 53.3 | 3 | 95.0% |
| OTHER | 19 | ₱1.6B | 73.7 | 9 | 95.3% |
| Water Provision and Storage | 8 | ₱344.3M | 62.2 | 2 | 83.5% |
| Bridges, Roads | 6 | ₱968.3M | 66.2 | 0 | 71.2% |
| GAA 2025 SSP | 3 | ₱228.7M | 95.0 | 3 | 85.2% |
| GAA 2025 OO-2 | 1 | ₱141.1M | 93.7 | 1 | 50.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CL0061CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG TAKAR RIVER PHASE 6, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱97.5M | 82% | High risk95 | Flagged0.014 |
| 25CL0062CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG TAKAR RIVER PHASE 7, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱97.5M | 95% | High risk95 | Flagged0.011 |
| 25OA0016CONSTRUCTION OF R-10 PUMPING STATION, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱33.6M | 78% | High risk94 | Flagged0.008 |
| 25HK0058ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD CONTROL STRUCTURE (RIGHT SIDE), BARANGAY CABANLUTAN,BA | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱141.1M | 50% | High risk94 | Flagged0.005 |
| 24FL0113CONSTRUCTION OF REVETMENT AT SAN RAMON, DOWNSTREAM PHASE 4, BULAN, SORSOGON | Region V | Sorsogon 2nd DEO | On-Going | ₱141.4M | 99% | High risk92 | Flagged0.054 |
| 24DD0308CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PINAGKAWITAN NATIONAL HIGH SCHOOL, BARANGAY PINAGKAWITAN, LIPA CITY, BAT | Region IV-A | Batangas 4th DEO | On-Going | ₱78.7M | 54% | High risk87 | Flagged0.055 |
| 17DD0194DRAINAGE IMPROVEMENT, ROSARIO-SAN JUAN ROAD (S01926LZ), K0126 + 774.00 - K0128 + 649.00; K0128 + 649.00 - K0130 + 638.00 | Region IV-A | Batangas 4th DEO | Completed | ₱98M | 100% | High risk83 | Flagged0.022 |
| 24GA0248CONSTRUCTION OF PUMPING STATION AT BRGY. POBLACION, KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱96.2M | 3% | High risk83 | Flagged0.070 |
| 24FE0022OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF DIKE ALONG BICOL RIVER BASIN, ISLA MATUNGAW, MILAOR, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | On-Going | ₱125.4M | 99% | High risk82 | Flagged0.008 |
| 23BD0041BASIC INFRASTRUCTURE PROGRAM - MULTI- PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, TUGUEGARAO EAST CENTRAL SCHOOL, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱49.4M | 72% | High risk82 | Flagged0.025 |
| 24MC0028CONSTRUCTION OF REVETMENT ALONG MARBOL RIVER STA. 21 + 900 - STA. 22 + 700 R/S, BARANGAY NEW CEBU, PRES. ROXAS, COTABATO (REPUBLISHED) | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 94% | High risk81 | Flagged0.017 |
| 24MC0027CONSTRUCTION OF REVETMENT ALONG MARBOL RIVER STA. 21 + 400 - STA. 22 + 200 L/S, BARANGAY NEW CEBU, PRES. ROXAS, COTABATO (REPUBLISHED) | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 93% | High risk81 | Flagged0.017 |
| 25CL0079CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BAYTO RIVER, PHASE 3, SANTA CRUZ, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 25% | High risk81 | Flagged0.005 |
| 25CL0080CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BAYTO RIVER, PHASE 4, SANTA CRUZ, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 39% | High risk81 | Flagged0.000 |
| 24CL0078CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 3, SAGPAT SECTION, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.2M | 100% | High risk81 | —-0.043 |
| 24CL0077CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 2, SAGPAT SECTION, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.2M | 100% | High risk81 | —-0.043 |
| 24CL0079CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 4, SAGPAT SECTION, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.3M | 100% | High risk81 | —-0.043 |
| 25CC0329CONSTRUCTION OF PUMPING STATION INCLUDING FLOOD GATE (PHASE II) AT BARANGAY ATLAG, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 34% | High risk81 | —-0.004 |
| 24CC0548CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION AND FLOOD GATE AT BARANGAY SANTO ROSARIO, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk81 | Flagged0.008 |
| 24CC0547CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION AND FLOOD GATE AT BARANGAY CALERO CREEK, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 51% | High risk81 | —-0.006 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24GA0248CONSTRUCTION OF PUMPING STATION AT BRGY. POBLACION, KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱96.2M | 3% | High risk83 | Flagged0.070 |
| 24DD0308CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PINAGKAWITAN NATIONAL HIGH SCHOOL, BARANGAY PINAGKAWITAN, LIPA CITY, BAT | Region IV-A | Batangas 4th DEO | On-Going | ₱78.7M | 54% | High risk87 | Flagged0.055 |
| 24FL0113CONSTRUCTION OF REVETMENT AT SAN RAMON, DOWNSTREAM PHASE 4, BULAN, SORSOGON | Region V | Sorsogon 2nd DEO | On-Going | ₱141.4M | 99% | High risk92 | Flagged0.054 |
| 24DD0277ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF LIPA CITY-MATAAS NA KAHOY DIVERSION RD. LEADING TO TAAL CIRCUMFERENTIAL ROAD PHASE 7, BATAN | Region IV-A | Batangas 4th DEO | On-Going | ₱187.4M | 0% | High risk69 | Flagged0.040 |
| 24DD0275ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF LIPA CITY-MATAAS NA KAHOY DIVERSION RD. LEADING TO TAAL CIRCUMFERENTIAL ROAD PHASE 5, BATAN | Region IV-A | Batangas 4th DEO | On-Going | ₱187.4M | 0% | High risk69 | Flagged0.040 |
| 17DF0096CONSTRUCTION OF 4STY 12CL SCHOOL BUILDING AT HALAYHAY ES, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱31.7M | 98% | Medium risk46 | Flagged0.039 |
| 17AA0616CONST. OF 1 UNIT 4 STOREY 20 CL, 2 UNITS 2 STOREY 8 CL, 2 UNITS 2 STOREY 4 CL SCHOOL BUILDING LAOAG | Region I | Ilocos Norte 1st DEO | Completed | ₱110.1M | 100% | Medium risk58 | Flagged0.032 |
| 24FL0117CONST. OF FLOOD MITIGATION STRUCTURE (REVETMENT) ALONG MARINAB RIVER AT BARANGAY MARINAB, BULAN, SOR | Region V | Sorsogon 2nd DEO | On-Going | ₱95.4M | 44% | High risk80 | Flagged0.028 |
| 25E00132CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, STO. NINO RIVER WATERWAYS ALONG ARAMAYWAN-BERONG-PTO. PRINCESA ROAD, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱161.8M | 81% | High risk76 | Flagged0.027 |
| 23BD0041BASIC INFRASTRUCTURE PROGRAM - MULTI- PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, TUGUEGARAO EAST CENTRAL SCHOOL, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱49.4M | 72% | High risk82 | Flagged0.025 |
| 24FL0118CONST, OF FLOOD MITIGATION STRUCTURE (REVETMENT) ALOBNG QUEZON (CABARAWAN) RIVER AT BARANGAY QUEZON | Region V | Sorsogon 2nd DEO | On-Going | ₱95.5M | 66% | High risk80 | Flagged0.025 |
| 24DD0276ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF LIPA CITY-MATAAS NA KAHOY DIVERSION RD. LEADING TO TAAL CIRCUMFERENTIAL ROAD PHASE 6, BATAN | Region IV-A | Batangas 4th DEO | On-Going | ₱187.4M | 61% | High risk69 | Flagged0.024 |
| 17DD0194DRAINAGE IMPROVEMENT, ROSARIO-SAN JUAN ROAD (S01926LZ), K0126 + 774.00 - K0128 + 649.00; K0128 + 649.00 - K0130 + 638.00 | Region IV-A | Batangas 4th DEO | Completed | ₱98M | 100% | High risk83 | Flagged0.022 |
| 23AH0162CLUSTER NO. I - CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS WATER SUPPLY SYSTEM: 1. CONSTRUCTION OF SOLAR WATER SYSTEM IN THE MUNICIPALITY OF SAN FABIAN, PANGASINAN; 2. | Region I | Pangasinan 2nd DEO | On-Going | ₱39.2M | 17% | Medium risk47 | Flagged0.021 |
| 24CC0568CONSTRUCTION OF 4STY8CL, SAN ROQUE NATIONAL HS, PAOMBONG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱40.3M | 58% | Medium risk54 | Flagged0.020 |
| 24CC0544CONSTRUCTION OF 4STY 8CL, MATIAS B. SALVADOR MEMORIAL ELEMENTARY SCHOOL, PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱41.3M | 66% | Medium risk48 | Flagged0.019 |
| 25G00078CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY BITOON ILAWOD TO BARANGAY POBLACION ILAYA, CUARTERO, CAPIZ | Region VI | Region VI | On-Going | ₱150.7M | 31% | High risk80 | Flagged0.019 |
| 23E00078SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF BULILUYAN SHORE PROTECTION AND CAUSEWAY DEVELOPMENT, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱120.6M | 77% | High risk62 | Flagged0.018 |
| 24MC0028CONSTRUCTION OF REVETMENT ALONG MARBOL RIVER STA. 21 + 900 - STA. 22 + 700 R/S, BARANGAY NEW CEBU, PRES. ROXAS, COTABATO (REPUBLISHED) | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 94% | High risk81 | Flagged0.017 |
| 24MC0027CONSTRUCTION OF REVETMENT ALONG MARBOL RIVER STA. 21 + 400 - STA. 22 + 200 L/S, BARANGAY NEW CEBU, PRES. ROXAS, COTABATO (REPUBLISHED) | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 93% | High risk81 | Flagged0.017 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 24FN0061CLUSTER V: CONSTRUCTION OF 8-CLASSROOM SCHOOL BUILDING (BUHI HIGH SCHOOL, BRGY. LOURDES, BUHI, CAMARINES SUR & NABUA NATIONAL HIGH SCHOOL, BRGY. SAN MIGUEL, NABUA, CAMARINES SUR) | Region V | Camarines Sur 5th DEO | On-Going | ₱79.6M | 100% | High risk63 | —-0.002 |
| 127 | 24A00012CONSTRUCTION OF MISSING LINKS/NEW ROADS, BANTAY (ILOCOS SUR) - SAN QUINTIN - LANGIDEN (ABRA) ROAD, ILOCOS SUR (PACKAGE 5) | Region I | Region I | Completed | ₱154M | 100% | High risk63 | —-0.024 |
| 128 | 16OE0105MFO 2-FLOOD MANAGEMENT SERVICES-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVERWALL, ESTERO DE MAYPAJO (HERMOSA SECTION) TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱49M | 100% | High risk63 | —-0.041 |
| 129 | 18OH0064CONSTRUCTION OF DRAINAGE SYSTEM (BOX CULVERT) ALONG SERVICE ROAD TO VILLAMOR GOLF COURSE LEADING TO | National Capital Region | South Manila DEO | Completed | ₱93.1M | 100% | High risk63 | —-0.077 |
| 130 | 19FK0089LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-ASPHALTING AT POBLACION CASIGURAN | Region V | Sorsogon DEO | Completed | ₱85.9M | 100% | High risk63 | —-0.090 |
| 131 | 17A00021CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL ROAD, REPLACEMENT OF PERMANENT WEAK BRIDGE OF CARAYAN BORIS BRIDGE (B00677LZ) ALONG PANGASINAN-TARLAC ROAD | Region I | Region I | Completed | ₱57.9M | 100% | High risk63 | —-0.022 |
| 132 | 25OB0356CONSTRUCTION OF MULTI-PURPOSE BUILDING, NATIONAL LANGUAGE SKILLS CENTER, TESDA COMPLEX, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱97.1M | 15% | High risk63 | —-0.025 |
| 133 | 24A00020CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BAUANG-SAN FERNANDO-SAN JUAN BYPASS ROAD, (SAN FERNANDO-SAN JUAN SECTION), LA UNION | Region I | Region I | On-Going | ₱105.4M | 25% | High risk62 | —-0.001 |
| 134 | 20FK0017NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CASTILLA BYPASS ROAD, PACKAGE 2 CASTILLA, SORSOGON | Region V | Sorsogon DEO | Completed | ₱79.6M | 100% | High risk62 | —-0.047 |
| 135 | 23E00078SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF BULILUYAN SHORE PROTECTION AND CAUSEWAY DEVELOPMENT, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱120.6M | 77% | High risk62 | Flagged0.018 |
| 136 | 25HK0046ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY 4, TANJAY CITY, NEG | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱93.8M | 55% | High risk62 | —-0.020 |
| 137 | 18FK0100CLUSTER XIII-CONSTRUCTION OF CY-2018 BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH I, CASIGURAN, SORSOGON | Region V | Sorsogon DEO | Completed | ₱91.5M | 100% | High risk62 | —-0.027 |
| 138 | 24A00513SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM (PACKAGE 2), DAGUPAN CITY, PANGASINAN | Region I | Region I | Completed | ₱144.7M | 100% | High risk62 | —-0.047 |
| 139 | 22E00113CLUSTER 7: PREVENTIVE MAINTENANCE-SECONDARY ROADS-PUERTO PRINCESA NORTH ROAD, 7.1: KO246+000-KO249+703; 7.2: KO232+531-KO236+460; 7.3: KO189+681-KO194+358, PALAWAN | Region IV-B | Region IV-B | Completed | ₱262.7M | 100% | High risk62 | —-0.035 |
| 140 | 20OE0146CONSTRUCTION (COMPLETION) OF NORTH MANILA DISTRICT ENGINEERING OFFICE (PERMANENT OFFICE) PHASE II, MANILA | National Capital Region | North Manila DEO | Completed | ₱98M | 100% | High risk62 | —-0.084 |
| 141 | 25OD0115CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM ALONG BARANGAY 174, 175 AD 177, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱94.9M | 51% | High risk61 | —-0.048 |
| 142 | 23E00175ASSET PRESERVATION PROGRAM- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS, PUERO PRINCESANORTH ROAD, STA. 215+005-STA. 215+365, TAYTAY, PALAWAN | Region IV-B | Region IV-B | Completed | ₱160.2M | 100% | High risk61 | —-0.053 |
| 143 | 18OE0244LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMETN OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES - LOCAL ROADS- CONSTRUCTION OF ROADS AND PATHWAYS WITH DRAINAGE IMPROVEMENT, BRGY. 147 ZONE 13 TO BRGY. 205 ZONE 18, | National Capital Region | North Manila DEO | Completed | ₱95.5M | 100% | High risk61 | —-0.079 |
| 144 | 23DI0154CONSTRUCTION OF ROAD INCLUDING DRAINAGE AT BARANGAY PULO AND BARANGAY SAN ISIDRO, CABUYAO CITY, LAGUNA (PHASE II) | Region IV-A | Laguna 2nd DEO | On-Going | ₱94.6M | 100% | High risk61 | —-0.058 |
| 145 | 23F00001CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS(KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN) IMELDA BOULEVARD, VIRAC, CATANDUANES, VIRAC, CATANDUANES (LONE DISTRICT) | Region V | Region V | Completed | ₱104.2M | 100% | High risk61 | —-0.087 |
| 146 | 22O00004CONSTRUCTION OF LAGUNA LAKE HIGHWAY EXTENSION (PHASE 5), MUNTINLUPA CITY | National Capital Region | National Capital Region | Completed | ₱96.4M | 100% | High risk61 | —-0.085 |
| 147 | 25DD0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF LIPA CITY-MATAASNAKAHOY DIVE | Region IV-A | Batangas 4th DEO | On-Going | ₱93.7M | 0% | High risk61 | —-0.037 |
| 148 | 17BB0018NETWORK DEV'T-OFF-CARRIAGEWAY IMPRV'T INCLUDING DRAINAGE-SECONDARY,OFF CARRIAGEWAY IMPRV'T:SHOULDER PAVING/CONST.-CVR(MAGAPIT JCT.APARRI AIRPORT SECT).K0554+(-240)-K0557+000,K0559+000-K0560+012.90 (S00662LZ),BRGYS. MAGAPIT,STA.MARIA & CATAYAUAN,LAL-LO,CAG | Region II | Cagayan 1st DEO | Completed | ₱70.7M | 100% | High risk61 | —-0.027 |
| 149 | 18PL0087CONSTRUCTION OF NEW PERMANENT BRIDGES (TANUDAN BRIDGE) ALONG TABUK BANAWE RD VIA TANUDAN-BARLIG RD | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱96.2M | 100% | High risk61 | —-0.014 |
| 150 | 18B00049ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: ABIAN BRIDGE (B01226LZ) ALONG DAANG MAHARLIKA (LZ) K0254+517-K0254+641, PROVINCE OF NUEVA VIZCAYA | Region II | Region II | Completed | ₱101.9M | 100% | High risk61 | —-0.034 |