Contractor dossier
131 projects on file, including joint ventures this contractor is part of.
Total projects
131
Total budget
₱2.4B
Average progress
95.1%
Completion rate
83.2%
Average risk score
38.0
Medium risk on average, out of 100
Flagged as unusual
12
9.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 130 | ₱2.4B | 38.0 | 12 | 95.1% |
| Region VIII | 1 | ₱39.2M | 45.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 48 | ₱286.8M | 21.6 | 0 | 99.8% |
| Roads | 32 | ₱502.3M | 38.6 | 0 | 99.7% |
| Flood Control and Drainage | 26 | ₱1.2B | 41.0 | 1 | 94.9% |
| GAA 2025 SSP | 8 | ₱39.2M | 94.7 | 7 | 54.4% |
| OTHER | 7 | ₱235.9M | 75.1 | 4 | 85.1% |
| Bridges | 6 | ₱110.9M | 41.2 | 0 | 97.3% |
| Water Provision and Storage | 3 | ₱12.1M | 25.4 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱22.5M | 39.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NG0093CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. TAGANITO, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 44% | High risk95 | Flagged0.022 |
| 25NG0087CONSTRUCTION OF EVACUATION CENTER, BRGY. SAPA, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 61% | High risk95 | Flagged0.019 |
| 25NG0062CONSTRUCTION OF ROAD AT SITIO SABANG, BRGY. TAYAGA, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 3% | High risk95 | Flagged0.034 |
| 25NG0105CONSTRUCTION OF EVACUATION CENTER, BRGY. MAGALLANES, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 82% | High risk95 | Flagged0.013 |
| 25NG0101CONSTRUCTION OF SAN PEDRO - SAN ISIDRO - MAYAG ROAD, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 7% | High risk95 | Flagged0.031 |
| 25NG0027CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. SAN PABLO, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 66% | High risk95 | Flagged0.014 |
| 25NG0099CONSTRUCTION OF CAPAYAHAN-MARGA- SAN PABLO ROAD LEADING TO TOURISM AREA, TUBOD, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 73% | High risk95 | Flagged0.013 |
| 25NG0064CONSTRUCTION OF ROAD, BRGY. SABANG, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | High risk95 | —-0.022 |
| 24NG0092CONSTRUCTION OF ANOMAR FLOOD MITIGATING STRUCTURE/ BARANGAY ANOMAR, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱86.8M | 84% | High risk89 | Flagged0.050 |
| 24NG0045CONSTRUCTION OF BINOCARAN - MALIMONO FLOOD MITIGATION STRUCTURE AT BARANGAY BINOCARAN, MALIMONO, SURIGAO DEL NORTE / BRGY. BINOCARAN, MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱86M | 97% | High risk77 | Flagged0.006 |
| 16NF0149CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG SURIGAO-SAN JUAN COASTAL ROAD/SURIGAO CITY, K1119+485 - K1119+625.03, L/S K1119+633.09 - K1119+730.90, L/S, K1119+740 - K1119+813.25, L/S, K1119+823.45 - K1119+951, L/S | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.7M | 100% | High risk74 | —-0.023 |
| 25NG0024NRJ BRGY. CAMPO-BRGY. PAYAPAG ROAD LEADING TO SITIO LITTLE BAGUIO FALLS AND FARM, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 19% | High risk74 | Flagged0.018 |
| 24NG0007CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES INDUSTRIES AND ECONOMIC ZONES, CAMPO-CABUGAO ROAD IN SUPPORT TO AGRIBUSINESS INDUSTRY, BACUAG, SURIGAO DEL NORTE / BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱32.6M | 100% | High risk74 | —-0.019 |
| 16NF0141WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO (2) LANES/SIANA BRIDGE (B00859MN) ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION) K1157+163.00 - K1157+179.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱15M | 100% | High risk74 | —-0.023 |
| 24NG0106CONSTRUCTION OF DRRM BUILDING, MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱979.3K | 96% | High risk64 | Flagged0.037 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24NG0092CONSTRUCTION OF ANOMAR FLOOD MITIGATING STRUCTURE/ BARANGAY ANOMAR, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱86.8M | 84% | High risk89 | Flagged0.050 |
| 24NG0106CONSTRUCTION OF DRRM BUILDING, MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱979.3K | 96% | High risk64 | Flagged0.037 |
| 25NG0062CONSTRUCTION OF ROAD AT SITIO SABANG, BRGY. TAYAGA, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 3% | High risk95 | Flagged0.034 |
| 25NG0101CONSTRUCTION OF SAN PEDRO - SAN ISIDRO - MAYAG ROAD, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 7% | High risk95 | Flagged0.031 |
| 25NG0093CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. TAGANITO, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 44% | High risk95 | Flagged0.022 |
| 25NG0087CONSTRUCTION OF EVACUATION CENTER, BRGY. SAPA, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 61% | High risk95 | Flagged0.019 |
| 25NG0024NRJ BRGY. CAMPO-BRGY. PAYAPAG ROAD LEADING TO SITIO LITTLE BAGUIO FALLS AND FARM, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 19% | High risk74 | Flagged0.018 |
| 23NG0155REPAIR OF CABUGAO FLOOD CONTROL / BRGY. CABUGAO, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱30M | 0% | Medium risk59 | Flagged0.016 |
| 25NG0027CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. SAN PABLO, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 66% | High risk95 | Flagged0.014 |
| 25NG0099CONSTRUCTION OF CAPAYAHAN-MARGA- SAN PABLO ROAD LEADING TO TOURISM AREA, TUBOD, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 73% | High risk95 | Flagged0.013 |
| 25NG0105CONSTRUCTION OF EVACUATION CENTER, BRGY. MAGALLANES, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 82% | High risk95 | Flagged0.013 |
| 24NG0045CONSTRUCTION OF BINOCARAN - MALIMONO FLOOD MITIGATION STRUCTURE AT BARANGAY BINOCARAN, MALIMONO, SURIGAO DEL NORTE / BRGY. BINOCARAN, MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱86M | 97% | High risk77 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 22NG0022CONSTRUCTION OF MAGTIACO RIVER FLOOD CONTROL ALONG MAGTIACO RIVER, BARANGAY SAN PEDRO, ALEGRIA, SURIGAO DEL NORTE / BARANGAY SAN PEDRO, ALEGRIA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱48.5M | 100% | Medium risk40 | —-0.072 |
| 52 | 23NE0090CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ALBOR, LIBJO, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.084 |
| 53 | 21NG0014CONSTRUCTION/IMPROVEMENT OF MAGTIACO RIVER FLOOD CONTROL STRUCTURE ALONG MAGTIACO BR. (PHASE 2) / BRGY. SAN PEDRO, ALEGRIA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱47M | 100% | Medium risk39 | —-0.072 |
| 54 | 23NG0021CONSTRUCTION OF HEALTH CENTER, BARANGAY IMA, SISON, SURIGAO DEL NORTE / BARANGAY IMA, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.084 |
| 55 | 18NH0068NRJ LEADING TO MARINE AND BIRD SANCTUARY, BRGY. BURGOS,CORTES,SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱22.5M | 100% | Medium risk39 | —-0.057 |
| 56 | 20NG0016CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS NRJ ALIPAO ROAD LEADING TO MAINIT LAKE BOAT LANDING FACILITY / ALEGRIA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱14.3M | 100% | Medium risk39 | —-0.089 |
| 57 | 22NG0018CONSTRUCTION OF ANAO-AON FLOOD CONTROL STRUCTURE / BRGY. POBLACION, SAN FRANCISCO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱39.2M | 100% | Medium risk39 | —-0.073 |
| 58 | 23NG0015CONSTRUCTION OF EVACUATION CENTER, BARANGAY SILOP, MAINIT, SURIGAO DEL NORTE/BARANGAY SILOP, MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.083 |
| 59 | 24NG0040CONSTRUCTION OF ROAD, BARANGAY TINOGPAHAN, SISON, SURIGAO DEL NORTE / BRGY. TINOGPAHAN, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 96% | Medium risk39 | —-0.052 |
| 60 | 18NF0054CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS NRJ ALIPAO ROAD LEADING TO MAINIT LAKE BOAT LANDING FACILITY/BRGY. ALIPAO, ALEGRIA, SURIGAO DEL NORTE, STA.0+000.00 - STA.0+660.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱19.6M | 100% | Medium risk39 | —-0.087 |
| 61 | 24NG0048CONSTRUCTION OF TAGBAYANI FLOOD MITIGATION STRUCTURE, BARANGAY TAGBAYANI, SISON, SURIGAO DEL NORTE / BRGY. TAGBAYANI, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱29.1M | 100% | Medium risk39 | —-0.071 |
| 62 | 19NG0032NRJ BRGY. CAMPO - BRGY. PAYAPAG ROAD LEADING TO SITIO LITTLE BAGUIO FALLS AND FARM / BACUAG, SURIGAO DEL NORTE, K 2+179 - K 2+934.2 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱19.3M | 100% | Medium risk39 | —-0.087 |
| 63 | 21NG0041CONSTRUCTION/IMPROVEMENT OF BAOY RIVER FLOOD CONTROL/BRGY, SAN ISIDRO, GIGAQUIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱47M | 100% | Medium risk39 | —-0.068 |
| 64 | 23NG0065CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL GYMNASIUM)/BARANGAY SAN PEDRO, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.083 |
| 65 | 20NG0022CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, CAMPO-CABUGAO ROAD IN SUPPORT TO AGRIBUSINESS INDUSTRY/BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱19.6M | 100% | Medium risk39 | —-0.087 |
| 66 | 20NG0017CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ BRGY. CAMPO - BRGY. PAYAPAG ROAD LEADING TO SITIO LITTLE BAGUIO FALLS AND FARM / BRGY. DUGSANGON, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱19.6M | 100% | Medium risk39 | —-0.087 |
| 67 | 24NG0035CONSTRUCTION OF ROAD, BARANGAY POBLACION TO BARANGAY STO. ROSARIO, BACUAG, SURIGAO DEL NORTE /BRGY. POBLACION, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.087 |
| 68 | 24NG0012CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ BRGY. CAMPO-BRGY. PAYAPAG ROAD LEADING TO SITIO LITTLE BAGUIO FALLS AND FARM, BACUAG, SURIGAO DEL NORTE / BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.8M | 100% | Medium risk39 | —-0.084 |
| 69 | 18NF0069CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ BRGY. CAMPO - BGRY. PAYAPAG ROAD LEADING TO SITIO LITTLE BAGUIO FALLS AND FARM, BRGY. PAYAPAG, BACUAG, SURIGAO DEL NORTE, STA.2+934.20-STA.4+305.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱27.9M | 100% | Medium risk39 | —-0.088 |
| 70 | 25NG0103CONSTRUCTION OF ROAD, BRGY. CAGDIANAO, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 97% | Medium risk39 | —-0.054 |
| 71 | 19NG0023CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES ALONG CAMPO-CABUGAO ROAD IN SUPPORT TO AGRI-BUSINESS INDUSTRY / BACUAG, SURIGAO DEL NORTE, STA.1+000.00 - STA.1+400.75 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.8M | 100% | Medium risk39 | —-0.084 |
| 72 | 20NG0019CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM, SISON RIVER CONTROL /SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱45.9M | 100% | Medium risk39 | —-0.072 |
| 73 | 24NG0026CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, LOCAL ACCESS ROAD LEADING TO CLAVER ECO-PARK BARANGAY PANATAO FROM BARANGAY SAPA CLAVER WOMENS ASSOCIATION SUPPLIES SITE IN SUPPORT OF WASTE RECYCLING, PROCESSING A | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱11.6M | 100% | Medium risk39 | —-0.085 |
| 74 | 24NG0041CONSTRUCTION OF BARANGAY PAYAPAG ROAD, BACUAG, SURIGAO DEL NORTE / BRGY. PAYAPAG, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk39 | —-0.086 |
| 75 | 20NG0090CONSTRUCTION OF MULTIPURPOSE BUILDING (MUNICIPAL BLDG.)/SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱14.6M | 100% | Medium risk38 | —-0.081 |